Appendix II-Contd.

163

KOWLOON

P17. Cheung Sha Wan Reclamation, Stage II.

P18. Police Small Arms Range.

P19.

Kwun Tong Public Pier.

NEW TERRITORIES

P20. Tsuen Wan Reclamation, Stage I.

P21.

Tung Chung Pier.

P22. Ma Wan Pier.

CATEGORY B(i)

HONG KONG

(Items the planning of which has commenced or should commence during 1960/61)

P23. Reclamation at Aldrich Bay (including Pier at Shau Kei Wan},

P24.

Aberdeen Reclamation and Typhoon Shelter.

KOWLOON

P25.

P26.

P27.

P28.

P29.

P30.

Kwun Tong Reclamation, Stage III:

(a) Section 2.

(b) Section 3 and Seawall,

Cha Kwo Ling Seawall.

Extension to Seawall at To Kwa Wan.

To Kwa Wan Public Pier.

Cheung Sha Wan Reclamation, Landing Stages.

Tai Wan Seawall.

P31. Tai Po/Castle Peak Road Link.

NEW TERRITORIES

P32.

Lai Chi Chong Pier.

P33.

Sha Tau Kok Pier.

P34.

P35.

Sai Kung Reclamation.

P36.

KOWLOON

Cheung Chau Typhoon Shelter.

Sham Chung Pier, Tolo Harbour.

CATEGORY B(ii)

(Investigations of Major Development Scheme)

P37. Ho Man Tin Development, Investigations.

CATEGORY C

HONG KONG

P38.

KOWLOON

P39.

(Items considered desirable, the details of which require further consideration or for which no design staff can be made available)

North Point Quarry Area Development.

Kwun Tong Reclamation, Stage III, Section 3 Roads and Drainage. P40. Ngok Yu Shan, Kwun Tong, Roads & Drainage.

P41. Area East of Kwun Tong Nullah, Roads and Drainage.

NEW TERRITORIES

P42. Waglan Island, Landing Facilities.

P43. Sai Kung Typhoon Shelter.

P44. Tai O Typhoon Shelter.

P45. Tap Mun Typhoon Shelter.

GENERAL

CATEGORY D(i)

(Items which are estimated to cost less than $100,000 and which could be proceeded with as and when opportunity offers)

P46. Temporary Vehicular Ferry Service.

Share This Page