Works.

Appendix VI (a)

LOAN

WORKS.

Authorised under Public Works Loan, 1927-$5,000,000.

Works.

HEAD 1-WATER WORKS DEVELOPMENT.

(a) Shing Mun Valley Scheme,

HEAD 2 AERODROME AND HARBOUR DEVELOPMENT,

(a) Harbour Development.... (b) Aerodrome...

Total Cost.

Amount charged to Public Works Loan 1927.

Amount tempo- rarily charged to Surplus Balances.

4,136,765.59

3,500,000.00

636,765.59

474,854.63 1,045,631.29

474,854.63 1,025,145.37

20,485.92

Total

5,657,251.51

5,000,000.00

*657,251.51

* Transferred to 34% Dollar Loan, 1934.

Appendix VI (b).

Appendix VI (b)

LOAN WORKS

Authorised under 31% Dollar Loan, 1934-$25,000,000.

117

Revised Estimated Cost.

Expenditure up to

31. 12. 35.

Revised Estimated Expenditure 1936.

Estimated Expenditure 1937.

Estimated

Estimated Expenditure Expenditure

1938.

1939.

(2) Filters†

HEAD-1. ABERDEEN VALLEY WATER SCHEMET

2. SHING MUN VALLEY WATER SCHEMES

(a) 1st Sectiont.

(b) 2nd Section :-

(1) Preliminary Workst.

(3) Gorge Dam

2,555,702.78

2,555,702.78

E

636,705.59*

636,765.59

36,718.84

120,045.23

8,325,000.00

(4) 2nd Cross Harbour Pipel

173,348.32

36,718.84 120,045.23 6,023,127,03 173,348.32

2,000,000.00

301,872.97

(5) 2nd 24" Trunk Main

350,000.00

300,000.00

50,000.00

(6) 3rd Rapid Gravity Filters

300,000.00

0,941,877.98

250,000.00

50,000.00

3. VEHICULAR FERRY.

1,930,000.00 1,867,977.51

02,022.49

4. NEW GAOL AT STANLEY

5. TYTAM TCK CATCHWATERS

6. AIRPORT:—

(a) Aerodromet

(b) Airport and Seaplane Slipway

(e) Wireless Telegraph Station

7. REDEMPTION OF 31% INSCRIBED STOCK†.

4,400,000.00 1,450,711.32

700,000.00 644,368.44

2,600,000.00

349,288.68

55,631.50

20,485.92*

20,485,92

860,000.00

583,931.92

214,068.00

127,000.00 1,007,485.92

64,172.79

62,000,08 02,827.21

3,861,942.97

3,864,942.97

8. CENTRAL MARKET

9. PUBLIC WORKS (UNALLOCATED)

550,000.00

49,990.35

200,000.00

350,000.00

49,990.35

TOTAL..

25,000,000.00

13,860,000.00

18,042,298.66 5,481,722.05

13,800,000.00

1,075,988.94

399,990.35

Expenditure charged to 33% Dollar Loan (First Issue).......

Expenditure temporarily charged or to be charged to

Surplus Balances pending Second Issue of Bonds..

† Completed.

11,140,000.00

* Transferred from Appendix VI (a).

4,182,298.66

5,481,722.05 1,075,988.94

399,990.35