78
Head 26. KOWLOON CANTON RAILWAY
KOWLOON CANTON RAILWAY,-Continued.
Other Charges,-Continued.
Brought forward
Sub-heads :-
12 Incidental Expenses.
Approved Estimate, 1936.
Estimate, 1937.
€
$
582,348
581,657
E-1-5-3 Stores
E-1-6 Head Office
E-2-8-4 Traffic Office
150
155
800
940
150
160
13 Locomotives.
E-5-1-3 Engineering Office
E-4-2-1 Repairs...
150
155
eeee
1,250
1,410
26,500
22,750
(2)
E-4-2-1-1 Painting
1,638
1,092 (2)
28,138
23,842
14 Lubricants and Oil Fuel.
E-3-1-4 Locomotive Oil........................
12,800
12,800
E-3-2-2 Carriages and Wagons, Oil
1,100
900
(2)
E-3-3-2 Oil Fuel for Motor Coaches
1,500
4,400
(1)
15,400
18,100
15 Medical and Sanitation.
E-1-9-2 First aid Bandages, up-keep of Ambulance Boxes,
etc. on trains
200
200
""
Railway Cups for Efficiency in First Aid.
75
75
275
275
16 Minor Works (Maintenance of Way and Structures).
E-5-11 New Minor Works
E-5-12-6 Minor Repairs
17 Miscellaneous.
E-1-7-3 Stores Depreciation.....
18 Nightsoil Disposal,
F-2-2-3 Nightsoil Disposal
19 Plantations.
E-5-12-4 Plantations....
20 Power, Electric Fans and Light.
E-1-5-3 Stores
2,000
2,000
150
150
2,150
2,150
100
100
100
100
261
216
(2)
264
216
75
(3)
75
100
100
E-1-6 Head Office
650
650
E-2-4-1 Stations
3.300
3,300
E-4 Maintenance of Equipment
7,000
6,800
(2)
E-5-14-2 Maintenance of Fans and Light
1,200
1,200
12,250
12,050
21 Printing, Stationery and Tickets.
E-1-5-3 Stores
80
80
E-1-6
Head Office
540
500
(2)
E-2-5
Traffic Expenses
2,400
2,400
E-3-1-1-4 Running Expenses
180
180
E-5-1-3 Maintenance of Way and Structures
250
250
3,450
3,410
22 Rails and Fastenings.
E-5-5-3 Fastenings
1,500
2,250
(4)
Rails
150
150
1,650
2,400
23 Rents.
E-1-13 Rent of Shum Chun Station
4,400
4,400
4,400
4,400
Carried forward
651,750
650,010
(1) Considered necessary.
(2) Considered sufficient.
(3) Not required.
(4) Lower rate of exchange.