Works.
Appendix VI (a)
LOAN WORKS.
Authorised under Public Works Loan, 1927-$5,000,000.
Works.
Total Cost.
Amount charged to Public Works Loan 1927,
Amount tempo- rarily charged to Surplus Balances.
HEAD 1-WATER WORKS DEVELOPMENT.
(a) Shing Mun Valley Scheme,
4,136,765.59
3,500,000.00
636,765.59
HEAD 2-AERODROME AND HARBOUR DEVELOPMENT. (a) Harbour Development... (b) Aerodrome..
474,854,63
1,045,631.29
474,854.63 1,025,145.37
20,485.92
Total
5,657,251.51
5,000,000.00
*657,251.51
* Transferred to 3% Dollar Loan, 1934,
Appendix VI (b).
Appendix VI (b)
LOAN WORKS
Authorised under 31% Dollar Loan, 1934-$25,000,000.
115
Revised Estimated Cost.
Expenditure up to
31. 12. 34.
Revised Estimated Expenditure 1935.
Estimated Expenditure 1936.
Estimated
Estimated Expenditure Expenditure
1937.
1938.
HEAD-1. ABERDEEN VALLEY WATER SCHEME
2. SHING MUN VALLEY WATER SCHEMES
(a) 1st Section
(b) 2nd Section:-
(1) Preliminary Works
(2) Filters
(3) Gorge Dam
(4) 2nd Cross Harbour Pipe
(5) 2nd 24" Trunk Main
(6) 3rd Rapid Gravity Filters
3. VEHICULAR FERRY
4. NEW GOAL AT STANLEY
36,718.84 120,045.23
8,750,000.00
2,555,702.78
2,555,702.78
626,765.59*
636,765.59
36,718.84 120,045.23
250,000.00
3,686,414.49 87,546.92
2,385,000.00 102,453.08
350,000.00
300,000.00
10,443,529.66
1,800,000.00
250,000.00 150,000.00
878,585.51
90,000.00 140,000.00
10,000,00 10,000.00
1,930,000.00 1,850,417.49
5. TYTAM TUK CATCHWATERS
4,500,000.00
720,000.00
554,768.73
470,248.83
78,000.00
1,345,231.27
190,000.00
1,582.51
2,600,000.00
59,751.17
6. AIRPORT:—
(a) Aerodrome
20,485.92*
20,485,02
(b) Airport and Seaplane Slipway
860,000.00
166,495,86
(e) Wireless Telegraph Station
95,000.00
975,485.92
26,513.65
542,200.00 68,486.35
151,304.14
7. REDEMPTION OF 31% INSCRIBED STOCK
8. PUBLIC WORKS (UNALLOCATED)
3,864,942.97
10,338.67
3,864,942.97
10,338.67
TOTAL.
Expenditure charged to 31% Dollar Loan (First Issue)....
Expenditure temporarily charged or to be charged to
Surplus Balances pending Second Issue of Bonds..
25,000,000.00 14,077,067.30
13,860,000.00 13,860,000.00
4,771,370.70 5,012,637.82 1,118,924.18
20,000.00
11,140,000.00
217,067.30
4,771,370.70 5,012,637.82 1,118,921.18
20,000.00
* Transferred from appendex VI(a).