FOR THE YEAR 1924.

PUBLIC WORKS.

[Class VI]}

88

Original Revised Estimate. Estimate.

Approved Revised Estimated Estimated

Expenditure Expenditure 1924.

Estimated Expenditure.

1923.

1923.

PUBLIC WORKS,—Continued.

C-PUBLIC WORKS, EXTRA-

ORDINARY,-Contd.

Brought forward,

COMMUNICATIONS,—Contd.

Roads :-Continued.

(g.) Access Road from Tsün-wan to the proposed Water Works at Shing Mun Valley,

(h.) Waterloo Road extension (100

feet wide) Section between Kowloon Boundary to foot of hills S.E. of tunnel (estimate for 50 foot width), (i) Fanling to Sha-tau-kok Road, (j) General Works, ....

DRAINAGE.

Training Nullabs :—

(a.) One side wall and invert of nullah on Eastern side of the Kaulungtong Development Scheme,

(b.) Kaulungtong Development Area, connection of stream North of this area to main nullah,

(c.) Shamshuipo, extension of existing Nanchang Street Nullah to Taipo Road,

(d.) General Works,

25 Miscellaneous Drainage Works :—

(a.) Main sewer from Fuk Tsun Heung in a North-easterly direction to Taipo Road,

10,000 168,000

GOOD

+

5,558,600

10,000

10,000

100,000

5,000

5,000

K

160,000

30,000

30,000

30,000

70,000

50,000

10,000

50,000

60,000

50,000

30,000

10,000

20,000

5,000

5,000

5,000

25,000

25,000

(6.) Storm

water drains from Nan Chang Street Nullah in the direc- tion of Kaulungtong Village,.......... (e.) Kaulungtong Development Scheme,

Sewers,

15,000

15,000

100,000

25,000

(d) Kaulungtong Development Scheme portion of Storm Water drains,

200,000

50,000

(e.) General Works,

10,000

15,000

20,000

MISCELLANEOUS.

16 Further Reclamation at Shamshuipo,

730,000

200,000

80,000

150,000

27 Kaulungtoug Development Scheme :--

(a.) Resumption,

64,000

34,000

10,000

(6.) Excavation and filling,

280,000

160,000

110,000

100,000

28 Construction of Water-boat Dock at Lai

Chi Kok,..

410,000

100,000

80,000

100,000

129 Refuse Dump,-Cheung Sha Wan,

15,000

5,000

1,000

Furniture for Government Offices and Quarters,

3,500

4,500

3,500

Chinese Cemeteries,-Laying out new areas,

1

2,000

2,000

2,000

132 Kowloon Bay East Reclamation, forma- tion of Junk building and repairing yards,

175,000

10,000

4,000

50,000

383 Opening up of Quarry, Castle Peak, 184 Miscellaneous Works,

PUBLIC HEALTH AND BUILDINGS ORDINANCE, 1903.

10,000

20,000

5,000

15,000

17,000

15,000

POS

135 Compensation and Resumptions,

20,000

56,000

20,000

WATER WORKS.

186 Extension of Kowloon Catch water,..

190,000

100,000

70,000

120,000

137 Shing Mun Valley Scheme,

20,000

10,000

100,000

Shek Lai Pui, Reservoir and Contingent

Works,

260,000

50,000

30,000

200,000

189 Fauling Water Works Scheme,

30,000

40,300

7,500

7,500

7,000

Total Public Works, Extraordinary,......

.$ 6,997,100