SHANGHAI

679

hangpoo Regulation" with plans and estimates for a period of ten years involving a al outlay of six million Taels, which was approved by all concerned but could not be rted owing to lack of funds. A practical scheme for the carrying out of Mr. von Heiden- am's project was ultimately evolved by the Shanghai Chamber of Commerce. This As based on the levying of 3 per cent. Conservancy tax on all Customs duties and 14 r mille of value on duty-free imported or exported goods, the administration to be rried on by a Board consisting of the Shanghai Commissioner for Foreign Affairs, Je Commissioner of Customs and the Harbour Master. After lengthy negotiations ring 1911 and 1912, this scheme, with some minor amendments, was approved by the overnment in April, 1912. The scheme was put into operation on May 15th, 1912, cording to Mr. von Heidenstam's project. A new parallel jetty on the eastern side the former Outer Bar, training-works in the Upper River, and the dredging of time 7,000,000 cubic yards, mostly at convexes and in the Astræa Channel, have been ecuted. The former Outer and Inner Bars, where only 16 and 14 feet of water were ailable in 1907, have thus been eliminated, and the shallowest reach in the whole ver is now over 24 feet deep over a width of 600 feet in the narrowest places. In 15 and 1916 the narrow reach at the Chinese City at Nantao was widened by dred- ng, and a new bund, which is later to be lined with pontoons and godowns, was created r the Chinese City. Towards the end of 1916 the Board acquired the first in- allation of its own dredging plant, consisting of one powerful bucket dredger, one mping plant for pumping dredged material from the barges into reclaimings ashore, nd several sets of tugs and barges to form the necessary transport fleet. A second imilar unit was acquired in 1923, and two large grab-dredgers and a small bucket- bredger have been added. Many riparian reclamations have been, and are being, exe- eted by the Board for frontagers. Detailed hydrographic observations of the river are Lade continuously and an investigation of the Yangtsze estuary has been carried out. the income of the Board through the new tax amounted to some 944,000 taels during 23, and the work is now proceeding satisfactorily. At the end of 1921, Mr. von eidenstam's project, started in 1912, had been practically completed, at a cost of about ve million Taels, as against the estimate of six millions. The second ten-year work rogramme mentioned below was then adopted and includes an effort by dredging to sptain still greater depths in the navigable channel.

Mr. von Heidenstam and two eminent consulting hydraulic engineers, at home a report entitled "The Future Development of the Shanghai Harbour," dated April, -b18, and addressed to the Board, strongly urged an investigation of the possibilities developing Shanghai as a first-class port for deep-draught steamers. The onsultative Board and the various Chambers of Commerce gave their whole-hearted upport to the proposal of these engineers, and a full and complete investigation of the echnical factors of further developing Shanghai as a first-class port was carried out y the Board during 1919-1921. The programme included the investigation of all ossible solutions and the submission of the results to an International Committee of Harbour Experts. Several reports on physical and engineering data were issued by he Conservancy Board, including a statistical survey ("The Port of Shanghai ") and any valuable reports on the hydrology of the Yangtsze estuary and Hangchow Bay, s well as a series of maps of the approaches to the Port. Several schemes for the evelopment of the harbour were also drawn up and presented to the conference of the Harbour Experts.

The Committee, which met at Shanghai in October, 1921, arrived at a definite con- lusion and submitted a report to the Whangpoo Conservancy Board containing their Edinal recommendation for the future development of the Shanghai Harbour both with egard to navigational accommodation and terminal facilities. They advised that She approaches to Shanghai through the South Channel of the Yangtsze should be deepened by dredging so as to accommodate within a few years ships with a draft of 3 feet. Furthermore, they recommended that public quays and moorings should be rovided with a commercial dock on the left bank of the Whangpoo as near Shanghai is practicable, and mail steamer accommodation near the mouth of the river, also on the left bank. The Committee recommended the expansion of the present Board into Harbour Board with more extended powers in order to carry out the proposed works and to administrate the port as a whole. The recommendations of the Committee, with some amendments, were forwarded in 1922 to the authorities concerned, with the qpproval of all the Foreign Chambers of Commerce and Councils.

While the development on a large scale of Shanghai Harbour is still the subject of discussion between the Foreign Ministers in Peking and the Chinese Government, a temporary work-programme for the further improvement of the Whangpoo was made

23

Page 735Page 736

Share This Page