CAB7-4 — Page 297

National Archives 英國國家檔案館 All

Page 297

Page 297

269

DEFENCE OF SINGAPORE.

(Table No. 1.)-SEA Defences. (Military).

NEW HARBour.

Batteries.

Armament.

Cost of Works.

Cost of Armament.

Total Cost.

No. of Royal Artillery.

Remarks.

£

£

£

Western entrance-

Mount Siloso Berlayer, or Passir

Panjang Blakang Mati South

Eastern entrance-

Blakang Mati East. Tanjong Paggar, or

Dock Wall

Total

5 10-in., 2 64-pr...

8,000

17,925

25,925

120

6 64-pr. at station.

3 10-in., 3 64-pr...

15,000

10,795

25,795

100

3 7-in.

20,000

20,000

50

7-in. guns

5 10-in.,

64-pr...

8,000

17,925

25,925

100

3 10-in., 1 64-pr...

40,000

10,795

50,795

68

2 64-pr. for land defence; one of these

at station.

from Tanjong Katong.

This is only very approximately esti- mated. More information is required as to ground for foundation.

16 10-in., 3 7-in.,

7 64-pr.

91,000

57,440

118,440

438

2. If Dock Wall bat- tery is not approved, then remodelling of Mount Palmer*

4 10-in., 2 64-pr...

3,000

11,200

Only the cost of 3 10-in. guns is esti

mated for, as the other will not aid in defence of new harbour, but fire over the "roads" anchorage.

* Making total: 17 10-in. M.L.R. guns, 3 7-in. M.L.R. guns, and 8 64-pr. M.L.R.

Cost of works if Dock Wall battery is built

armament

""

£

£

91,000 if not 51,000 57,440 57,440

148,440

111,440

14,200

68

¡Batteries.

ANCHORAGE IN SINGAPORE ROADS AND TOWN NORTH OF RIVER.

Armament.

Cost of Works.

Cost of Armament.

Total Cost.

No. of Royal Artillery.

£

£

3 10-in...

40,000

11,200

* £

51,200

6 10-in...

100,000

20,910

120,910

..

3 10-in., 4 20-pr...

12,000

11,255

23,255

12 10-in., 4 20-pr..| 152,000

43,365

195,365

68

100 100

268

1. Tanjong Paggar, or

Dock Wall Central Fort

Tanjong Katong

Total *

2. If Dock Wall bat-

2 10-in...

tery is not con- structed, Mount

Palmer

3,585

3,585

17

Remarks.

The estimates for Central Fort and Dock Wall battery are very approxi- mate; it is impossible to frame any reliable estimate till borings have been made of the ground. The summe are placed at higher figures than are considered sufficient on the spot, but it has been thought best to leave a wide margin.

Only 1 10-in. gun estimated for; the others are comprised in estimate for New Harbour, as also are the works.

* Total: 12 10-in. guns, M.L.R., 4 20-pr. for land side of Tanjong Katong.

Cost of works if Dock Wall battery is built

[1103]

armament

Total

*

..

£

£

152,000 if not 112,000

43,365

39,780

195,365

151,780

(In addition to works required for defence of New Harbour.)

Page 297

3 Z

Page 297

151

Appendix No. 4.

SINGAPORE.

MAJA

Page 297

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.