Shekou
• Tuen Mun
Tung Chung
Yuen Long
Lok Ma
• Chau
Shenzhen
Lo Wu
Sheung Shui
NORTHERN LINK
Tai Po
Tsuen Wan
PORT RAIL LINE OPTIONS
HONG KONG SECTION OF HONG KONG-SHENZHEN AIRPORT RAIL LINK
Tsing Yi
New Territories
Sha Tin
Transport 235
Legend
Existing Railway
Rail Project under Construction
Rail Project under Planning or Review
HONG KONG SECTION OF THE GUANGZHOU-SHENZHEN- HONG KONG EXPRESS RAIL LINK
Ma On Shan
SHATIN TO CENTRAL LINK
KWUN TONG LINE EXTENSION
KOWLOON SOUTHERN LINK
Kowloon
Tseung Kwan O
WEST ISLAND LINE
LOHAS PARK STATION
Lantau Island
SOUTH ISLAND LINE (WEST)
Hong Kong Island
SOUTH ISLAND LINE (EAST)
NORTH HONG KONG ISLAND LINE
The Kwun Tong Line Extension will extend the existing Kwun Tong Line from Yau Ma Tei to Whampoa with one intermediate station at Ho Man Tin. The Government has asked the MTRCL to proceed with planning and to draw up a preliminary engineering design to enable construction to commence in 2010 and for completion by 2015.
The South Island Line (East) will be a medium capacity railway link running from Admiralty to South Horizons with three intermediate stations at Ocean Park, Wong Chuk Hang and Lei Tung Estate. The MTRCL has drawn up a preliminary engineering design and is proceeding with further planning to enable construction to commence in 2011 and for completion by 2015.
The Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link will provide an additional link from a new terminus at West Kowloon to the boundary at Huanggang for connection with the Mainland section. Trains will be able to run through a 26-kilometre-long tunnel at a maximum speed of 200 kilometres per hour. Upon completion, the journey time between Guangzhou and Hong Kong will be reduced from 100 minutes to about 50 minutes. The Government
No comments yet.
Private notes are available after approval.