Sessional_Paper_1938 — Page 99

Sessional Papers 議政定例兩局文件 All

95

Appendix IV.

WASTE DETECTION.

Estimated capital outlay necessary to equip Hong Kong and Kowloon for

systematic waste detection work :

Alterations to distribution systems

Provision of meters

Alterations to private house services

$120,000

120,000

60,000

$300,000

Annual operating expenses are estimated as follows:-

1 European Inspector, including housing, travelling, transport and

pension @ say £500 per annum

$ 8,000

10 Asiatic Inspectors, including housing, travelling, transport and

pension @ say $1,000 each.

10,000

Fitters and coolies

7,000

Maintenance of meters and equipment

5,000

Road openings and reinstatement

10,000

Estimated ultimate saving in consumption-say 71%.

On present maximum consumption say 2 M.G.P.D.

Estimated capital outlay represented by 2 M.G.P.D. $3,500,000.

Loan Charges on $3,500,000.

Interest and Sinking Fund-71%.

Deduct.

74% on $300,000

Annual charges-salaries and maintenance

Estimated ultimate saving p.a.

$ 40,000

$ 262,500

$22,500

40,000

62,500

200,000

NOTE.

An effective waste detection system will take a few years to perfect and during that period the average annual saving would be very considerably less than $200,000.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.