This cost, apportioned over the whole of the building areas, aggregating about 565,250 square feet, formed to the north and south of the New Jubilee Road, is equivalent to $2.88 per square foot.

Reprovisioning on the reclamation; Cattle Depôt Disinfecting Station, Opium Refinery, &c.

Cattle Depôt

Poultry Market, Disinfecting Station, &c. Opium Refinery.

By the re-provisioning recommended, the present Cattle Depôt site at Kennedy Town, shewn edged and coloured indigo blue on Drawing No. 6 and the site of the Disinfecting Station below Caine. Road (near No. 8 Police Station) valued at $1,155,000.00 and $200,000.00 res- pectively, will become available for dis- posal

The new areas of land formed and not required for re-provisioning are valued at $ 1,505,000.00 to the north and $643,000.00 to the south of New Jubilee Road

.$1,355,000.00

$ 1,626,000.00

3,210,000.00

545,000.00 135,000.00

$ 5,516,000.00

2,148,000.00

$ 3,503,000.00

Estimated Amount recoverable by disposal of land

Resultant Cost to Goveroment by carrying out this scheme... $ 2,013,000.00

HUNG HOM BAY.

Drawings Nos. 3, 4 and 11.

Description of Scheme.

In April, 1923, Messrs. Butterfield and Swire made application for additional berth- ing accommodation to the extent of 1,200 feet to the north of Messrs. Alfred Holt & Co.'s present wharfage. The south-west portion of the Scheme shewn coloured light pink and cross-hatched in darker pink on Drawings Nos. 3 and 4 will allow for extending, by 80 feet, the present berthage, making Holt's East Wharf 550 feet in length. Extending in a northerly direction, a length of 1,300 feet of additional wharfage, having a depth of 34 feet of water alongside at L.W.O.S.T., may be constructed and for the purpose of erecting "transit warehouses" contiguous with the wharfage, sufficient area of land can be provided by reclamation.

With regard to the principal portion of the scheme shewn coloured pink and yellow, it is proposed to reclaim areas adjoining the railway reclamation and to project from the new reclamation three jetties in an easterly direction. These jetties together with a quay wall protecting the northern area of new reclamation form a ship basin 1,200 feet long and 400 feet wide, having berthage 2,400 feet in length with a depth of 34 feet (or if required 36 feet) of water alongside at L.W.O.S.T. and two junk basins 160 feet wide, having berthage of about 4,240 feet in length, with a depth of 12 feet of water alongside. The Southern area of the new reclamation will be protected by a quay wall 1,200 feet in length with a depth of 34 feet of water, in continuation of which Jetty No. 1 having the same depth of water on its south side and 12 feet on its north side extends for a distance of 1,250 feet. The continuation of this jetty in a north-easterly direction provides on its south-east side 900 feet of berthage and on its north-west side