·Draw-off tower
100280
41-
HONGKONG.
DIAGRAM OF LOW LEVEL DAM UNDER CONSTRUCTION AT TYTAM TUK SHEWING PROGRESS TO 30TH JUNE, 1916.
Laid before the Legislative Council by Command of His Excellency the Governor, August 3rd, 1916.
No. 16
10 1916
Total length of dam excluding tongue into hillside at ends 1195 feet
Overflow length overall 279 feet☀
Overflow face
Flood-water Channel
Ordnance Datum
Culverts for stream diversion
Ordnance Datum
W.CHATHAM
DIRECTOR OF PUBLIC WORKS
DOWN - STREAM ELEVATION OF COMPLETED DAM
--120 feet
-84 feet-
Son June 1916
Original
Surface
Ground
Ordnance Dałym
Concrete
Be
Masonry 30th
June 1916.
(Temporary Overflow
origin
Ground
surf
SECTION THROUGH CENTRE LINE OF DAM
SCALE | INCH 100 FEET
Excavation to 30TH June 1916 Shewn thus:- Concrete & Masonry »
}}
وو
"}
- 109/2 feet —
CROSS SECTION ON LINE A-B
SCALE I INCH=30 FEET