DIAGRAM OF LOW LEVEL DAM UNDER CONSTRUCTION AT TYTAM TUK SHEWING PROGRESS TO 30TH JUNE, 1915.

Laid before the Legislative Council by Command of His Excellency the Governor, September 9th, 1915.

No.

Total length of dam excluding tongue into hillside at ends 1195 feet Draw-off lower

Overflow length overall 279 feet →→

Ordnance Datum

Overflow face

Flood-water channel.

DOWN-STREAM ELEVATION OF COMPLETED DAM

Culverts for stream diversion.

W. CHATHAM

original

DIRECTOR OF PUBLIC WORKS

surface

Ground

SECTION THROUGH CENTRE LINE OF DAM

SCALE I INCH = 100 FEET

Excavation to 30th June 1915 shewn thus :- Concrete & masonry

-120ƒ

Progress to June 30th

1915

Ordnance balam

109% ft

CROSS SECTION ON LINE A-B → SCALE 1 INCH = 30 FEET ———