Sessional_Paper_1898 — Page 135

Sessional Papers 議政定例兩局文件 All

ESTIMATE SPECIFICA-

TION.

HONGKONG PUBLIC WORKS DEPARTMENT,—Continued.

ITEMS OF ESTIMATE.

QUANTITY.

RATE. AMOUNT. TOTAL.

131

Brought forward,

$9,115.00

No. 2 STOREKEEPER'S HOUSE.

C.

C.

Excavation for foundations,

Do. Do.

in flooring of verandah,. in surfacing,

Do.

Cement concrete in foundations,

Granite masonry, dressed beds and joints,

Brickwork in lime mortar,.

Do. in cement mortar,

Tiled roofing complete,

24.50 cubes. 12.25

.74

18.13

30.00

367.50

""

1.25

32.00

40.00

21

13.75 squares.

11.00

151.25

7

cubes.

65,00

455.00

moulded,

2.50

80.00

200.00

""

60

23.00

1,380.00

5

28.00

140.00

""

14

squares.

20.00

280.00

Superficial feet of glazed windows,

120

.42

50.40

*

Do.

Do.

Roof trusses complete,

do. with jalousies,

135

.80

108.00

"

of braced and ledged doors,

300

.50

150.00

5.

2

20.00

40.00

*

Planked flooring complete, Allow for staircase,

8.50

35.00

297.50

+9

30.00

Plastering,

Painting 3 coats,

Tarring 2 coats,

Black-varnishing 2 coats,

Do. mantle piece,. Stoneware pipes 9" diameter,

Do.

6"

Manholes complete, Traps complete, Steel joists,..

Verandah railings,

Cast iron eaves gutters,.

Down pipes including heads, etc., Ceiling,

Oiling woodworks,

25.00

Ma

25 feet.

1.20

30.00

do.

100

1.00

100.00

""

I

15.00

15.00

>

2

4.00

8.00

"

0.50 tons.

200.00

100.00

1.25 squares.

50.00

62.50

100

feet.

.24

24.00

150

.40

60.00

"

6,50 squares.

12.00

78.00

20.50

4.00

82.00

>>

8.50

2.00

17.00

وو

22

3.30

72.60

21

1.40

29.40

??

4

2.00

8.00

}"

White-washing 3 coats,..

No. 3 SHEDS AND WORKSHOP.

Excavation in foundations,

Cement concrete in foundations,

Do. Do.

in surfacing,

channels,

Brickwork in lime mortar,

Do. in cement mortar,

Granite masonry, moulded, Tiled roofing complete,

37,25

.30

11.17

Contingencies 10 %,

4,430.45 443.55

$ 4,874,00

11.25 cubes.

.74

8.33

3

"

33.50 squares.

30.00 11.00

90.00

368.50

900

feet.

.17

157.50

10

cubes.

23.00

230,00

2

28.00

56.00

29

1.50

80.00

120.00

"

32.50 squares.

25.00

812.50

Roof trusses complete,

25

12.00

300.00

"}

Lead gutters,

250

feet.

.30

75.00

Cast iron eaves gutters,.

225

.24

54.00

"

Down pipes including heads, etc.,

150

.40

60.00

Tarring 2 coats,

47

squares.

1.40

65.80

Black-varnishing 2 coats,

8.50

2.00

7.00

White-washing 3 coats,..

103

.30

30.90

55

Contingencies 10 %,

2,435.58 243.47

No. 4 YARD.

$ 2,679.00

This Estimate provides for the construction of a Public Works Department Store at Wanchai, and a Storekeeper's residence with connected Offices, also for covered sheds and a workshop, in accordance with detailed plans and specifications.

Excavation, Cement concrete in surfacing, Allow for drainage,

52

17.50 cubes.

.74 squares. 11.00

12.95

572.00

800.00

Contingencies 10%,

1,384.95 138.05

TOTAL,

Hongkong, 5th January, 1898.

$ 1,523.00

18,191.00

R. D. ORMSBY, Director of Public Works.

Page 135Page 136