[
    {
        "id": 215874,
        "series_id": 26,
        "series_slug": "histsyn-rashkb-journal-engine",
        "series_title": "RASHKB Journal 皇家亞洲學會香港分會學刊",
        "series_use_hku_proxy": false,
        "document_key": "RAS-2002",
        "page_number": 173,
        "title": "RAS-2002",
        "content_text": "Table 1: Major public documents relating to the Devil's Peak Redoubt and Gough Battery\n\nPublic Records Office (PRO), Hong Kong Special Administrative Region Government\n\nDevil's Peak Redoubt\n\nA set of 1:120 sketches signed by Colonel L. Robertson, Chief Engineer of the South China Command entitled\n\n\"Devil's Peak: Copy of the Original Design prepared by Lt. A. F. Day and coloured by him to show progress up to 1.7.1913,\"\n\nand\n\n\"Devil's Peak Redoubt as constructed\" showing progress up to 1.7.1914.\n\n(Hong Kong PRO control reference 441(1 & 2))\n\nGough Battery\n\n\"Hong Kong, Survey of Devils Peak Shewing Prord Site for Batteries &C', drawn to a scale of 1:1200 the sites of three batteries dated \"13.5.99,\" \"surveyed by Lieut Bagnalt Wild R E in Dec: 98.\"\n\n(Hong Kong PRO control no. MM-0478)\n\n\"Devil's Peak - Hong Kong - Survey of Sites for Batteries\" showing a 1:2400 diagram of triangulation as well as 'Proposed Site for Battery for 9.2\"' and 'Proposed Site for Battery for 6\"' at a scale of 1:360 with a Public Record Office reference WO18/??182)\n\n(Hong Kong PRO control no. MM-0477)\n\nPage 106\n\n \n\nPage 106",
        "txt_file_path": "txt/dfo323lmgvd/RAS-2002.txt",
        "external_url": "https://digitalrepository.lib.hku.hk/catalog/mp4901278",
        "rank": 0
    },
    {
        "id": 215885,
        "series_id": 26,
        "series_slug": "histsyn-rashkb-journal-engine",
        "series_title": "RASHKB Journal 皇家亞洲學會香港分會學刊",
        "series_use_hku_proxy": false,
        "document_key": "RAS-2002",
        "page_number": 184,
        "title": "RAS-2002",
        "content_text": "117\n\n(HK) Ltd; Jacobs Associations, USA and Environmental Management Ltd., 2000b). Preliminary Feasibility Study on Tunnel Alignment Option of Tseung Kwan O: Western Coast Road Final Report Volume 2- Drawings December 2000 Agreement No. NTE1/2000. Hong Kong.\n\nMeinhardt (C&S) Ltd (in association with Montgomery Watson (HK) Ltd; Jacobs Associations, USA and Environmental Management Ltd., 2001). Preliminary Feasibility Study on Tunnel Alignment Option of Tseung Kwan O: Western Coast Road Final Report Volume 3- Executive Summary March 2001 Agreement No. NTE1/2000. Hong Kong.\n\nOve Arup & Partners Hong Kong Limited (1999). Reprovisioning Working Paper December 1999 in Study on Minimization of the Impacts of Western Coast Road on Lei Yue Mun Village (commissioned by the Territory Development Department) Hong Kong.\n\nProvisional Kwun Tong District Board (1998). Environmental Improvement Committee Paper No. 40/98. Hong Kong, Kwun Tong District Office. (Chinese documents)\n\nTerritory Development Department (2002). Drawing No.: TKZ0314 dated 7 May 2002 in Further Development of Tseung Kwan O - Feasibility Study Appendix III. Hong Kong, NT East Development Office.\n\nPublic records available at the Public Records Office, Tsui Ping Road, Kwun Tong, Hong Kong\n\n(a) On military sites\n\nPlan of Proposed Site for New Barracks: Devil's Peak. CO129/305.\n\n\"Hong Kong, Survey of Devils Peak Shewing Proposed Site for Batteries &c. drawn to a scale of 1:1200 the sites of three batteries dated “13.5.99”, “surveyed by Lieut Bagnall Wild R E in Dec: 98.” (Hong Kong PRO control no. MM-0478)\n\n'Devil's Peak - Hong Kong - Survey of Sites for Batteries' (Hong",
        "txt_file_path": "txt/dfo323lmgvd/RAS-2002.txt",
        "external_url": "https://digitalrepository.lib.hku.hk/catalog/mp4901278",
        "rank": 0
    }
]