RAS-1984 — Page 224

RASHKB Journal 皇家亞洲學會香港分會學刊 All AI Reviewed

7. Sluicegate through embankment (bund) on seaward end of kei wai. The kei wai is beyond the bund.

8. Gate closed by means of stout planks, with water escaping through gaps between them. The pegs protruding from the planks (one at each end) are used to raise and lower the planks with the help of two poles each having a hook at one end.

...

203

Edit History

2026-05-13 02:08:01 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
7. Sluicegate through embankment (bund) on seaward end of kei wai. The kei wai is beyond the bund. 8. Gate closed by means of stout planks, with water escaping through gaps between them. The pegs protruding from the planks (one at each end) are used to raise and lower the planks with the help of two poles each having a hook at one end. ... 203
Baseline (Original)
7. Sluicegate through embankment (bund) on seaward end of kei wai. The kei wai is beyond the bund. 8. Gate closed by means of stout planks, with water escaping through gaps between them. The pegs protruding from the planks (one at each end) are used to raise and lower the planks with the help of two poles each having a hook at one end. Į 203
2026-05-13 02:08:01 · Baseline
View content

7. Sluicegate through embankment (bund) on seaward end of kei wai. The kei wai is beyond the bund.

8. Gate closed by means of stout planks, with water escaping through gaps between them. The pegs protruding from the planks (one at each end) are used to raise and lower the planks with the help of two poles each having a hook at one end.

Į

203

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.