Water pumps for fresh water and other services were installed at five housing estates and at Stanley Prison and Happy Valley Sports Ground. Improvements to the chimneys at Kennedy Town Incineration Plant were completed and a system to prevent the fouling of the turbo-alternator condenser tubes at the Lai Chi Kok 'A' Incineration Plant was fitted. Hoists, manual and electric, were installed in the Western Management Centre and Waglan Lighthouse respectively. A steam boiler and underground fuel tank with associated pipework were installed at Stanley Prison.
Projects under Design and Construction
8.08
During the year 77 new projects were commenced and at the end of the year design and construction work was in progress on 131 projects; this number does not include 16 projects for which the initial design had not been completed by the end of the period under review. Major projects under construction included ventilation, lighting and traffic control systems for the second Lion Rock Tunnel, lifts, ramps and pier lighting services for Sham Shui Po new ferry pier and new lifts and ramps at the existing Cheung Chau ferry pier. At Hong Kong International Airport runway edge and end lighting cables were being installed together with improved high voltage system for the runway and apron areas and a new high voltage system for the Terminal Building Area, underground fuel tanks and fuel supply systems to various sub-stations, a new departure baggage handling system and subway lighting and pumps for the airport road. The installation of the arrival baggage handling system and Customs benches was awaiting the completion of builder's work.
8.09
Towards the end of the year tenders were invited from pre-qualified firms for the supply and installation of postal mechanisation equipment for the International Mail Centre. Firms experienced in the design and installation of a taxiway automatic route setting system for the International Airport were invited to apply for prequalification.
LEGISLATION
Lifts and Escalators (Safety) Ordinance
8.10
There are now 12,392 lifts and 298 escalators in use in Hong Kong. A total of 13,747 certificates in respect of examinations and tests of safety equipment was issued and 20 investigations made into lift accidents, unregistered lifts and complaints by the public.
Electricity Ordinance
8.11
The work undertaken in connection with this Ordinance, including proposals for its revision, has necessitated considerable investigation and the preparation of proposals. The work is continuing.
Peak Tramway Ordinance
8.12
Quarterly reports were received from the Peak Tramways Co. Ltd. certifying tests carried out on haulage equipment, track centre brake rail, stations, cars, signals and ropes. It was noted that both ropes were changed during 1976. Operation continues satisfactorily although the service was suspended for periods between 24th and 27th August 1976 due to severe tropical storm "Ellen" which caused a blockage of the track by a fallen tree.
Page 89
Water pumps for fresh water and other services were installed at five housing estates and at Stanley Prison and Happy Valley Sports Ground. Improvements to the chimneys at Kennedy Town Incineration Plant were completed and a system to prevent the fouling of the turbo-alternator condenser tubes at the Lai Chi Kok 'A' Incineration Plant was fitted. Hoists, manual and electric, were installed in the Western Management Centre and Waglan Lighthouse respectively. A steam boiler and underground fuel tank with associated pipework were installed at Stanley Prison.
Projects under Design and Construction
8.08
During the year 77 new projects were commenced and at the end of the year design and construction work was in progress on 131 projects; this number does not include 16 projects for which the initial design had not been completed by the end of the period under review. Major projects under construction included ventilation, lighting and traffic control systems for the second Lion Rock Tunnel, lifts, ramps and pier lighting services for Sham Shui Po new ferry pier and new lifts and ramps at the existing Cheung Chau ferry pier. At Hong Kong International Airport runway edge and end lighting cables were being installed together with improved high voltage system for the runway and apron areas and a new high voltage system for the Terminal Building Area, underground fuel tanks and fuel supply systems to various sub-stations, a new departure baggage handling system and subway lighting and pumps for the airport road. The installation of the arrival baggage handling system and Customs benches was awaiting the completion of builder's work.
8.09
Towards the end of the year tenders were invited from pre-qualified firms for the supply and installation of postal mechanisation equipment for the International Mail Centre. Firms experienced in the design and installation of a taxiway automatic route setting system for the International Airport were invited to apply for prequalification.
LEGISLATION
Lifts and Escalators (Safety) Ordinance
8.10
There are now 12,392 lifts and 298 escalators in use in Hong Kong. A total of 13,747 certificates in respect of examinations and tests of safety equipment was issued and 20 investigations made into lift accidents, unregistered lifts and complaints by the public.
Electricity Ordinance
8.11
The work undertaken in connection with this Ordinance, including proposals for its revision, has necessitated considerable investigation and the preparation of proposals. The work is continuing.
Peak Tramway Ordinance
8.12
Quarterly reports were received from the Peak Tramways Co. Ltd. certifying tests carried out on haulage equipment, track centre brake rail, stations, cars, signals and ropes. It was noted that both ropes were changed during 1976. Operation continues satisfactorily although the service was suspended for periods between 24th and 27th August 1976 due to severe tropical storm "Ellen" which caused a blockage of the track by a fallen tree.
Page 89Water pumps for fresh water and other services were installed at five housing estates and at Stanley Prison and Happy Valley Sports Ground. Improvements to the chimneys at Kennedy Town Incineration Plant were completed and a system to prevent the fouling of the turbo-alternator condenser tubes at the Lai Chi Kok 'A' Incineration Plant was fitted. Hoists, manual and electric, were installed in the Western Management Centre and Waglan Lighthouse respectively. A steam boiler and underground fuel tank with associated pipework were installed at Stanley Prison.
Projects under Design and Construction
8.08
During the year 77 new projects were commenced and at the end of the year design and construction work was in progress on 131 projects; this number does not include 16 projects for which the initial design had not been completed by the end of the period under review. Major projects under construction included ventilation, lighting and traffic control systems for the second Lion Rock Tunnel, lifts, ramps and pier lighting services for Sham Shui Po new ferry pier and new lifts and ramps at the existing Cheung Chau ferry pier. At Hong Kong International Airport runway edge and end lighting cables were being installed together with improved high voltage system for the runway and apron areas and a new high voltage system for the Terminal Building Area, underground fuel tanks and fuel supply systems to various sub-stations, a new departure baggage handling system and subway lighting and pumps for the airport road. The installation of the arrival baggage handling system and Customs benches was awaiting the completion of builder's work.
8.09
Towards the end of the year tenders were invited from pre-qualified firms for the supply and installation of postal mechanisation equipment for the International Mail Centre. Firms experienced in the design and install- ation of a taxiway automatic route setting system for the International Airport were invited to apply for prequalification.
LEGISLATION
Lifts and Escalators (Safety) Ordinance
8.10
There are now 12,392 lifts and 298 escalators in use in Hong Kong, A total of 13,747 certificates in respect of examinations and tests of safety equipment was issued and 20 investigations made into lift accidents, unregis- tered lifts and complaints by the public.
Electricity Ordinance
8.11
The work undertaken in connection with this Ordinance, including proposals for its revision, has necessitated considerable investigation and
The work is continuing. the preparation of proposals.
Peak Tramway Ordinance
8.12
Quarterly reports were received from the Peak Tramways Co. Ltd. certifying tests carried out on haulage equipment, track centre brake rail,
It was noted that both ropes were changed stations, cars, signals and ropes. during 1976. Operation continues satisfactorily although the service was suspended for periods between 24th and 27th August 1976 due to severe tropical storm "Ellen" which caused a blockage of the track by a fallen tree,
89