APPENDIX CC
Cont'd.
(8) Routine Electrical Works
1975-76 1976-77 Items of work carried out in Workshops 1,249 1,092 Plant inspections and tests 9,000 9,600 Major plant overhauls 36 45 479 508 Random faults rectified(9) Trunk and Distribution Mains
The following fresh and salt water trunk and distribution mains were laid :-
Fresh Water (m) Salt Water (m) Steel 500 mm and over 3 187 Steel 100 mm to 450 mm 8441 Cast Iron 100 mm to 450 mm Asbestos Cement 100 mm to 500 mm 1 130 272 Galvanized Iron 80 mm to 150 mm 73 306 26 860 15 212 15 912 67 Galvanized Iron 20 mm to 50 mm 63 843 P.V.C. 50 mm to 150 mm 4330 7868(10) Routine Instrumentation Works
1975-76 1976-77 Inspections and tests 5,072 6,411 Random faults rectified 694 669(11) Chemical Treatment
Principal chemicals used in treatment :
1975-76 1976-77 Tonnes Average dose (mg/1) Tonnes Average dose (mg/1) Fresh Water Alum 3 871 10.3 3 889 9.5 Hydrated lime 3 997 10.7 4404 10.7 244APFENDIX CC
-
Cont'd.
(8) Routine Electrical Works
11
"
1975-76
1976-77
Items of work carried out in Workshops
1,249
1,092
Plant inspections and tests
9,000
9,600
Major plant overhauls
36
45
479
508
Random faults rectified
(9) Trunk and Distribution Mains
The following fresh and salt water trunk and distribution mains were laid :-
Fresh Water (m)
Salt Water
(m)
Steel 500 mm and over
Steel 100 mm to 450 mm
8441
3 187
Cast Iron 100 mm to 450 mm
Asbestos Cement 100 mm to 500 mm
Galvanized Iron 80 mm to 150 mm
1 130
272
73
306
26 860
15 212
15 912
67
Galvanized Iron 20 mm to 50 mm
63 843
P.V.C. 50 mm to 150 mm
4330
7868
(10) Routine Instrumentation Works
1975-76
1976-77
Inspections and tests
5,072
6,411
Random faults rectified
694
669
(11) Chemical Treatment
Principal chemicals used in treatment :
1975-76
1976-77
Tonnes
Average dose (mg/1)
Tonnes
Average dose (mg/1)
Fresh Water
Alum
3 871
10.3
3 889
9.5
Hydrated lime
3 997
10.7
4404
10.7
244