1976-1977 — Page 129

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Hong Kong Comprehensive Transport Study

9.86

The main report and the report-in-brief were

published in December 1976.

1976 Population By-Census

9.87

The coding of transportation data obtained in the 1976 Population By-Census was completed. Work continued on the processing of the collected data to study 1976 travel characteristics and to re-calibrate part of the CTS transport

models.

Transport Planning Studies

9.88

The following studies were completed by the transport planning team:

(a) An assessment of passenger ridership on a

hypothetical Kowloon-Canton Railway extension between Sha Tin and Kwai Chung.

(b) An assessment of the capacity requirements and project staging of the western approaches to the Airport Tunnel Road.

(c) A forecast of traffic flow on alternative connections between Route 5 (Sha Tin Tsuen Wan link) and Tsuen Wan By-pass.

(d) An assessment of the changes in boarding and alighting passenger volumes at Kowloon-Canton Railway stations resulting from the deletion of the Kowloon Tong Railway Station.

(e) A study of the effect of rise of fares of Hong Kong Tramways and China Motor Bus.

(f) An assessment of the origin and destination of train passengers using the Mariner Railway Station and the likely changes in boarding and alighting passenger volumes at other stations resulting from the deletion of Mariner Station.

(g) An assignment of daily and peak hour traffic flows in 1991 in the Kowloon Bay Area as a result of the proposed development of the former RAF Kai Tak Area and the property development over the Kowloon Bay T.R. Depot.

119

Page 119

Page 119

Edit History

2026-05-12 08:58:32 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Hong Kong Comprehensive Transport Study 9.86 The main report and the report-in-brief were published in December 1976. 1976 Population By-Census 9.87 The coding of transportation data obtained in the 1976 Population By-Census was completed. Work continued on the processing of the collected data to study 1976 travel characteristics and to re-calibrate part of the CTS transport models. Transport Planning Studies 9.88 The following studies were completed by the transport planning team: (a) An assessment of passenger ridership on a hypothetical Kowloon-Canton Railway extension between Sha Tin and Kwai Chung. (b) An assessment of the capacity requirements and project staging of the western approaches to the Airport Tunnel Road. (c) A forecast of traffic flow on alternative connections between Route 5 (Sha Tin Tsuen Wan link) and Tsuen Wan By-pass. (d) An assessment of the changes in boarding and alighting passenger volumes at Kowloon-Canton Railway stations resulting from the deletion of the Kowloon Tong Railway Station. (e) A study of the effect of rise of fares of Hong Kong Tramways and China Motor Bus. (f) An assessment of the origin and destination of train passengers using the Mariner Railway Station and the likely changes in boarding and alighting passenger volumes at other stations resulting from the deletion of Mariner Station. (g) An assignment of daily and peak hour traffic flows in 1991 in the Kowloon Bay Area as a result of the proposed development of the former RAF Kai Tak Area and the property development over the Kowloon Bay T.R. Depot. 119 Page 119 Page 119
Baseline (Original)
Hong Kong Comprehensive Transport Study 9.86 The main report and the report-in-brief were published in December 1976. 1976 Population By-Census 9.87 The coding of transportation data obtained in the 1976 Population By-Census was completed. Work continued on the processing of the collected data to study 1976 travel characteristics and to re-calibrate part of the CTS transport models. Transport Planning Studies 9.88 The following studies were completed by the transport planning team: (a) An assessment of passenger ridership on a hypothetical Kowloon-Canton Railway extension between Sha Tin and Kwai Chung. (b) (c) (a) (e) (f) (g) An assessment of the capacity requirements and project staging of the western approaches to the Airport Tunnel Road. A forecast of traffic flow on alternative connections between Route 5 (Sha Tịn Tsuen Wan link) and Tsuen Wan By-pass. - An assessment of the changes in boarding and alighting passenger volumes at Kowloon- Canton Railway stations resulting from the deletion of the Kowloon Tong Railway Station. A study of the effect of rise of fares of Hong Kong Tramways and China Motor Bus. An assessment of the origin and destination of train passengers using the Mariner Railway Station and the likely changes in boarding and alighting passenger volumes at other stations resulting from the deletion of Mariner Station. An assignment of daily and peak hour traffic flows in 1991 in the Kowloon Bay Area as a result of the proposed development of the former RAF Kai Tak Area and the property development over the Kowloon Bay .T.R. Depot. 119
2026-05-12 08:58:32 · Baseline
View content

Hong Kong Comprehensive Transport Study

9.86

The main report and the report-in-brief were

published in December 1976.

1976 Population By-Census

9.87

The coding of transportation data obtained in the 1976 Population By-Census was completed. Work continued on the processing of the collected data to study 1976 travel characteristics and to re-calibrate part of the CTS transport

models.

Transport Planning Studies

9.88

The following studies were completed by the transport planning team:

(a) An assessment of passenger ridership on a

hypothetical Kowloon-Canton Railway extension between Sha Tin and Kwai Chung.

(b)

(c)

(a)

(e)

(f)

(g)

An assessment of the capacity requirements and project staging of the western approaches to the Airport Tunnel Road.

A forecast of traffic flow on alternative connections between Route 5 (Sha Tịn Tsuen Wan link) and Tsuen Wan By-pass.

-

An assessment of the changes in boarding and alighting passenger volumes at Kowloon- Canton Railway stations resulting from the deletion of the Kowloon Tong Railway Station.

A study of the effect of rise of fares of Hong Kong Tramways and China Motor Bus.

An assessment of the origin and destination of train passengers using the Mariner Railway Station and the likely changes in boarding and alighting passenger volumes at other stations resulting from the deletion of Mariner Station.

An assignment of daily and peak hour traffic flows in 1991 in the Kowloon Bay Area as a result of the proposed development of the former RAF Kai Tak Area and the property development over the Kowloon Bay .T.R. Depot.