1975-1976 — Page 68

Public Works Department Annual Report 工務司署年報 All AI Reviewed

AIRPORT LIAISON SECTION

1 MAINTAINS LIAISON BETWEEN CIVIL AVIATION DEPARTMENT AND ALL OFFICES OF THE PWD ON AIRPORT WORKS.

CONSULTANTS MANAGEMENT DIVISION

I PROVIDES SUPPORTING SERVICE AND CO-ORDINATION OF ALL ACTIVITIES OF CONSULTING ENGINEERS EMPLOYED ON CIVIL ENGINEERING PROJECTS

TECHNICAL TRAINING UNIT

I PROVIDES TRAINING FOR BOTH NEW RECRUITS AND SERVING SITE-SUPERVISION STAFF

2 CO-ORDINATES TRAINING OF CIVIL ENGINEERING GRADUATES.

1

QUARRIES SECTION

THE ADMINISTRATION AND OPERATION OF GOVERNMENT QUARRIES FOR THE PRODUCTION OF CRUSHED STONE AND BITUMEN-COATED MATERIALS AND THE ADMINISTRATION OF LONG-TERM PRIVATE QUARRIES ON CONTRACT

2 PWD LABORATORIES CARRY OUT TESTS AND ISSUE REPORTS ON A WIDE RANGE OF MATERIALS FOR PWD AND FOR PRIVATE ORGANISATIONS

DRAINAGE WORKS DIVISION

1 PLANS, DESIGNS, INVESTIGATES AND CONSTRUCTS SEWERAGE, SEWAGE DISPOSAL AND STORMWATER DRAINAGE THROUGHOUT THE COLONY

2 OPERATES SEWAGE DISPOSAL WORKS THROUGHOUT THE COLONY

DEVELOPMENT & AIRPORT DIVISION

1 PREPARES FEASIBILITY REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR KOWLOON.

2 DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS IN KOWLOON.

3 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS IN KOWLOON AND THE NEW TERRITORIES

4 INVESTIGATES AND CARRIES OUT CONTROLLED REFUSE TIPPING PROJECTS THROUGHOUT THE COLONY.

5 PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF CIVIL ENGINEERING WORKS IN CONNECTION WITH AIRPORT DEVELOPMENT AND MAINTENANCE

CIVIL ENGINEERING OFFICE

GENERAL OPERATION AND ORGANISATION CHART

GENERAL

1 DESIGNS, CONSTRUCTS AND MAINTAINS PUBLIC SEWERAGE DRAINAGE SYSTEMS, SEWAGE AND REFUSE DISPOSAL WORKS AND PUBLIC MARINE WORKS.

2 INVESTIGATES THE ENGINEERING FEASIBILITY OF PLANNED DEVELOPMENT AND CARRIES OUT POLLUTION STUDIES THROUGHOUT THE COLONY.

3 PLANS AND IMPLEMENTS MOST OF THE SITE FORMATION WORKS REQUIRED FOR THE DEVELOPMENT OF THE COLONY EXCEPT NEW TOWNS.

PORT WORKS DIVISION

1 DESIGNS, CONSTRUCTS AND MAINTAINS ALL PUBLIC PIERS, SEAWALLS AND BREAKWATERS

2 MAINTAINS OR INCREASES AS REQUIRED THE DEPTH OF THE HARBOUR

3 CHECKS PLANS OF PRIVATE MARINE WORKS

4 ARRANGES FOR THE APPROVAL OF PUBLIC AND PRIVATE MARINE WORKS

5 PREPARES FEASIBILITY REPORTS ON AND CARRIES OUT MAJOR DEVELOPMENT SCHEMES FOR HONG KONG ISLAND.

6 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS ON HONG KONG ISLAND.

56

RAILWAY DIVISION

1 PLANS, DESIGNS AND CONSTRUCTS THE NEW KOWLOON CANTON RAILWAY TERMINUS AT HUNG HOM AND WIDENING EXISTING TRACKS FROM HUNG HOM TO THE NEW TERRITORIES

Page 68

Page 68

Edit History

2026-05-12 07:15:41 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
AIRPORT LIAISON SECTION 1 MAINTAINS LIAISON BETWEEN CIVIL AVIATION DEPARTMENT AND ALL OFFICES OF THE PWD ON AIRPORT WORKS. CONSULTANTS MANAGEMENT DIVISION I PROVIDES SUPPORTING SERVICE AND CO-ORDINATION OF ALL ACTIVITIES OF CONSULTING ENGINEERS EMPLOYED ON CIVIL ENGINEERING PROJECTS TECHNICAL TRAINING UNIT I PROVIDES TRAINING FOR BOTH NEW RECRUITS AND SERVING SITE-SUPERVISION STAFF 2 CO-ORDINATES TRAINING OF CIVIL ENGINEERING GRADUATES. 1 QUARRIES SECTION THE ADMINISTRATION AND OPERATION OF GOVERNMENT QUARRIES FOR THE PRODUCTION OF CRUSHED STONE AND BITUMEN-COATED MATERIALS AND THE ADMINISTRATION OF LONG-TERM PRIVATE QUARRIES ON CONTRACT 2 PWD LABORATORIES CARRY OUT TESTS AND ISSUE REPORTS ON A WIDE RANGE OF MATERIALS FOR PWD AND FOR PRIVATE ORGANISATIONS DRAINAGE WORKS DIVISION 1 PLANS, DESIGNS, INVESTIGATES AND CONSTRUCTS SEWERAGE, SEWAGE DISPOSAL AND STORMWATER DRAINAGE THROUGHOUT THE COLONY 2 OPERATES SEWAGE DISPOSAL WORKS THROUGHOUT THE COLONY DEVELOPMENT & AIRPORT DIVISION 1 PREPARES FEASIBILITY REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR KOWLOON. 2 DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS IN KOWLOON. 3 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS IN KOWLOON AND THE NEW TERRITORIES 4 INVESTIGATES AND CARRIES OUT CONTROLLED REFUSE TIPPING PROJECTS THROUGHOUT THE COLONY. 5 PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF CIVIL ENGINEERING WORKS IN CONNECTION WITH AIRPORT DEVELOPMENT AND MAINTENANCE CIVIL ENGINEERING OFFICE GENERAL OPERATION AND ORGANISATION CHART GENERAL 1 DESIGNS, CONSTRUCTS AND MAINTAINS PUBLIC SEWERAGE DRAINAGE SYSTEMS, SEWAGE AND REFUSE DISPOSAL WORKS AND PUBLIC MARINE WORKS. 2 INVESTIGATES THE ENGINEERING FEASIBILITY OF PLANNED DEVELOPMENT AND CARRIES OUT POLLUTION STUDIES THROUGHOUT THE COLONY. 3 PLANS AND IMPLEMENTS MOST OF THE SITE FORMATION WORKS REQUIRED FOR THE DEVELOPMENT OF THE COLONY EXCEPT NEW TOWNS. PORT WORKS DIVISION 1 DESIGNS, CONSTRUCTS AND MAINTAINS ALL PUBLIC PIERS, SEAWALLS AND BREAKWATERS 2 MAINTAINS OR INCREASES AS REQUIRED THE DEPTH OF THE HARBOUR 3 CHECKS PLANS OF PRIVATE MARINE WORKS 4 ARRANGES FOR THE APPROVAL OF PUBLIC AND PRIVATE MARINE WORKS 5 PREPARES FEASIBILITY REPORTS ON AND CARRIES OUT MAJOR DEVELOPMENT SCHEMES FOR HONG KONG ISLAND. 6 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS ON HONG KONG ISLAND. 56 RAILWAY DIVISION 1 PLANS, DESIGNS AND CONSTRUCTS THE NEW KOWLOON CANTON RAILWAY TERMINUS AT HUNG HOM AND WIDENING EXISTING TRACKS FROM HUNG HOM TO THE NEW TERRITORIES Page 68 Page 68
Baseline (Original)
AIRPORT_LIAISON SECTION 1 MAINTAINS LIAISON BETWEEN CIVIL AVIATION DEPARTMENT AND ALL OFFICES OF THE PWD ON AIRPORT WORKS. CONSULTANTS MANAGEMENT DIVISION I PROVIDES SUPPORTING SERVICE AND CO-ORDINATION OF ALL ACTIVITIES OF CONSULTING ENGINEERS EMPLOYED ON CIVIL ENGINEERING PROJECTS TECHNICAL TRAINING UNIT I PROVIDES TRAINING FOR BOTH NEW RECRUITS AND SERVING SITE-SUPERVISION STAFF 2 CO-ORDINATES TRAINING OF CIVIL ENGINEERING GRADUATES. 1 QUARRIES SECTION THE ADMINISTRATION AND OPERATION OF GOVERNMENT QUARRIES FOR THE PRODUCTION OF CRUSHED STONE AND BITUMEN-COATED MATERIALS AND THE ADMINISTRATION OF LONG-TERM PRIVATE QUARRIES ON CONTRACT 2 PWD LABORATORIES CARRY OUT TESTS AND ISSUE REPORTS ON A WIDE RANGE OF MATERIALS FOR PWD AND FOR PRIVATE ORGANISATIONS DRAINAGE WORKS_DIVISION 1 PLANS, DESIGNS, INVESTIGATES AND CONSTRUCTS SEWERAGE, SEWAGE DISPOSAL AND STORMWATER DRAINAGE THROUGHOUT THE COLONY 2 OPERATES SEWAGE DISPOSAL WORKS THROUGHOUT THE COLONY DEVELOPMENT & AIRPORT DIVISION 1 PREPARES FEASIBILITY, REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR KOWLOON. 2 DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS IN KOWLOON. 3 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS IN KOWLOON AND THE NEW TERRITORIES 4. INVESTIGATES AND CARRIES OUT CONTROLLED REFUSE TIPPING PROJECTS THROUGHOUT THE COLONY. 5 PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF CIVIL ENGINEERING WORKS IN CONNECTION WITH AIRPORT DEVELOPMENT AND MAINTENANCE CIVIL ENGINEERING OFFICE GENERAL OPERATION AND ORGANISATION CHART GENERAL 1 DESIGNS, CONSTRUCTS AND MAINTAINS PUBLIC SEWERAGE DRAINAGE SYSTEMS, SEWAGE AND REFUSE DISPOSAL WORKS AND PUBLIC MARINE WORKS. 2. INVESTIGATES THE ENGINEERING FEASIBILITY OF PLANNED DEVELOPMENT AND CARRIES OUT POLLUTION STUDIES THROUGHOUT THE COLONY. 3 PLANS AND IMPLEMENTS MOST OF THE SITE FORMATION WORKS REQUIRED FOR THE DEVELOPMENT OF THE COLONY EXCEPT NEW TOWNS. PORT WORKS_DIVISION ! DESIGNS, CONSTRUCTS AND MAINTAINS ALL PUBLIC PIERS. SEAWALLS AND BREAKWATERS 2 MAINTAINS OR INCREASES AS REQUIRED THE DEPTH OF THE HARBOUR 3 CHECKS PLANS OF PRIVATE MARINE WORKS 4 ARRANGES FOR THE APPROVAL OF PUBLIC AND PRIVATE MARINE WORKS 5 PREPARES FEASIBILITY REPORTS ON AND CARRIES OUT MAJOR DEVELOPMENT SCHEMES FOR HONG KONG ISLAND. 6 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS ON HONG KONG ISLAND. 56 RAILWAY_DIVISION 1 PLANS, DESIGNS AND CONSTRUCTS THE NEW KOWLOON CANTON RAILWAY TERMINUS AT HUNG HOM AND WIDENING EXISTING TRACKS FROM HUNG HOW TO THE NEW TERRITORIES age 68 age 68 Page
2026-05-12 07:15:41 · Baseline
View content

AIRPORT_LIAISON SECTION

1 MAINTAINS LIAISON BETWEEN CIVIL AVIATION DEPARTMENT AND ALL OFFICES OF THE PWD ON AIRPORT WORKS.

CONSULTANTS MANAGEMENT DIVISION

I PROVIDES SUPPORTING SERVICE AND CO-ORDINATION OF ALL ACTIVITIES OF CONSULTING ENGINEERS EMPLOYED ON CIVIL ENGINEERING PROJECTS

TECHNICAL TRAINING UNIT

I PROVIDES TRAINING FOR BOTH NEW RECRUITS AND SERVING SITE-SUPERVISION STAFF

2 CO-ORDINATES TRAINING OF CIVIL ENGINEERING GRADUATES.

1

QUARRIES SECTION

THE ADMINISTRATION AND OPERATION OF GOVERNMENT QUARRIES FOR THE PRODUCTION OF CRUSHED STONE AND BITUMEN-COATED MATERIALS AND THE ADMINISTRATION OF LONG-TERM PRIVATE QUARRIES ON CONTRACT

2 PWD LABORATORIES CARRY OUT TESTS AND ISSUE REPORTS ON A WIDE RANGE OF MATERIALS FOR PWD AND FOR PRIVATE ORGANISATIONS

DRAINAGE WORKS_DIVISION

1 PLANS, DESIGNS, INVESTIGATES AND CONSTRUCTS SEWERAGE, SEWAGE DISPOSAL AND STORMWATER DRAINAGE THROUGHOUT THE COLONY

2 OPERATES SEWAGE DISPOSAL WORKS THROUGHOUT

THE COLONY

DEVELOPMENT & AIRPORT DIVISION

1 PREPARES FEASIBILITY, REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR KOWLOON.

2 DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS IN KOWLOON.

3 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS IN KOWLOON AND THE NEW TERRITORIES

4. INVESTIGATES AND CARRIES OUT CONTROLLED REFUSE TIPPING PROJECTS THROUGHOUT THE COLONY.

5 PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF CIVIL ENGINEERING WORKS IN CONNECTION WITH AIRPORT DEVELOPMENT AND MAINTENANCE

CIVIL ENGINEERING OFFICE

GENERAL OPERATION AND

ORGANISATION CHART

GENERAL

1 DESIGNS, CONSTRUCTS AND MAINTAINS PUBLIC SEWERAGE DRAINAGE SYSTEMS, SEWAGE AND REFUSE DISPOSAL WORKS AND PUBLIC MARINE WORKS.

2. INVESTIGATES THE ENGINEERING FEASIBILITY OF PLANNED DEVELOPMENT AND CARRIES OUT POLLUTION STUDIES THROUGHOUT THE COLONY.

3 PLANS AND IMPLEMENTS MOST OF THE SITE FORMATION WORKS REQUIRED FOR THE DEVELOPMENT OF THE COLONY EXCEPT NEW TOWNS.

PORT WORKS_DIVISION

! DESIGNS, CONSTRUCTS AND MAINTAINS ALL PUBLIC PIERS. SEAWALLS AND BREAKWATERS

2 MAINTAINS OR INCREASES AS REQUIRED THE DEPTH OF THE HARBOUR

3 CHECKS PLANS OF PRIVATE MARINE WORKS

4 ARRANGES FOR THE APPROVAL OF PUBLIC AND PRIVATE MARINE WORKS

5 PREPARES FEASIBILITY REPORTS ON AND CARRIES OUT MAJOR DEVELOPMENT SCHEMES FOR HONG KONG ISLAND.

6 SUPERVISES PUBLIC DUMPING ON RECLAMATIONS ON HONG KONG ISLAND.

56

RAILWAY_DIVISION

1 PLANS, DESIGNS AND CONSTRUCTS THE NEW KOWLOON CANTON RAILWAY TERMINUS AT HUNG HOM AND WIDENING EXISTING TRACKS FROM HUNG HOW TO THE NEW TERRITORIES