Major pump overhauls
Other repairs or works
Contracts let
(8) Routine Electrical Works
APPENDIX CC
Contd.
1974-75 1975-76 Items of work carried out in Workshops 796 1 249 Plant inspections and tests 33 225 9 000 Major plant overhauls 37 36 Major pump overhauls 321 479 Random faults rectified 71 125 718 1 155 8 16(9) Trunk and Distribution Mains
The following fresh and salt water trunk and distribution mains were laid:-
1974-75 (ft.) 1975-76 (ft.) Steel 22 in. dia. and over Fresh Water 16 323 Salt Water 1 379 Steel 4 in. to 18 in. dia. 3 838 516 Cast Iron 4 in. to 18 in. dia. 4 815 1 652 Asbestos Cement 4 in. to 21 in. dia. 89 782 43 162 Galvanized Iron 3 in. to 6 in. dia. 35 852 Galvanized Iron 1 in. to 2 in. dia. 67 743 348 P.V.C. 2 in. to 6 in. dia. 3 070 23 267(10) Routine Instrumentation Works
1974-75 1975-76 Inspections and tests 29 601 5 072 Random faults rectified 509 694233
Major pump overhauls
Other repairs or works
Contracts let
(8) Routine Electrical Works
APPENDIX CC
Contd.
1974-75
1975-76
71
125
718
1 155
8
16
Items of work carried out in Workshops
796
1 249
Plant inspections and tests
33 225
9.000
Major plant overhauls
37
36
321
479
Random faults rectified
(9) Trunk and Distribution Mains
The following fresh and salt water trunk and distribution mains were laid:-
Steel 22 in. dia. and over
Fresh Water (ft.) 16 323
Salt Water
ft.) 1 379
Steel 4 in. to 18 in. dia.
3 838
516
Cast Iron 4 in. to 18 in. dia.
4 815
1 652
Asbestos Cement 4 in. to 21 in. dia.
89 782
43 162
Galvanized Iron 3 in. to 6 in. dia.
35 852
Galvanized Iren in. to 2 in. dia.
67 743
348
P..C. 2 in. to 6 in. dia.
3 070
23267
10) Routine Instrumentation Works
Inspections and tests
Random faults rectified
1974-75
1975-76
29 601
5 072
509
694
233