APPENDIX Y

Contd.

Estimated

Project

Improvement of Luk Keng Road Minimal Improvements $ 490,000 Tsuen Wan By-pass, Stage I (Kwai Chung Road to Texaco Road) 66,700,000 Tsuen Wan By-pass Site Investigation and Resumption, Stage I 7,000,000 Kwai Chung Industrial Areas 27, 28 and 29 (part) - Drainage and Roads 8,200,000 Flyover Linking Kwai Chung Area 11 and 10 17,400,000 Lai Chi Kok Terrace Road 4,420,000 Kwai Chung Development Areas 10G, 10H and 37B, Roads and Drainage and Link Road 18,450,000 Footbridge over Castle Peak Road at Chung On Street, Tsuen Wan 810,000 Kwai Chung Development, Access Road to Kwai Chung Incinerator 4,100,000 Second Lion Rock Tunnel, Stage II, Roads and Ancillary Works 33,000,000 Lion Rock Tunnel Road North Portal to Siu Lek Yuen - Road Completion of Second Carriageway 6,000,000 Desilting Kwai Chung Main Culvert 500,000 Repair to drainage slope at Road D5, Tuen Mun New Town (near River Channel) 240,000 Repair to damaged cutting slope and landslip at Tsing Yi Island, opposite China Light & Power Station 600,000 Construction of Urn Burial Terraces Wo Hop Shek Cemetery - 8th Contract 627,000 Resurfacing Castle Peak Road from M.S. 16 c/9 to M.S. 18 134,000 Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57, Tsing Yi Island 150,000 423

Edit History

2026-05-12 08:12:43 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
APPENDIX Y Contd. Estimated Project Improvement of Luk Keng Road Minimal Improvements $ 490,000 Tsuen Wan By-pass, Stage I (Kwai Chung Road to Texaco Road) 66,700,000 Tsuen Wan By-pass Site Investigation and Resumption, Stage I 7,000,000 Kwai Chung Industrial Areas 27, 28 and 29 (part) - Drainage and Roads 8,200,000 Flyover Linking Kwai Chung Area 11 and 10 17,400,000 Lai Chi Kok Terrace Road 4,420,000 Kwai Chung Development Areas 10G, 10H and 37B, Roads and Drainage and Link Road 18,450,000 Footbridge over Castle Peak Road at Chung On Street, Tsuen Wan 810,000 Kwai Chung Development, Access Road to Kwai Chung Incinerator 4,100,000 Second Lion Rock Tunnel, Stage II, Roads and Ancillary Works 33,000,000 Lion Rock Tunnel Road North Portal to Siu Lek Yuen - Road Completion of Second Carriageway 6,000,000 Desilting Kwai Chung Main Culvert 500,000 Repair to drainage slope at Road D5, Tuen Mun New Town (near River Channel) 240,000 Repair to damaged cutting slope and landslip at Tsing Yi Island, opposite China Light & Power Station 600,000 Construction of Urn Burial Terraces Wo Hop Shek Cemetery - 8th Contract 627,000 Resurfacing Castle Peak Road from M.S. 16 c/9 to M.S. 18 134,000 Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57, Tsing Yi Island 150,000 423
Baseline (Original)
APPENDIX Y Contd. Estimated Project Improvement of Luk Keng Road Minimal Improvements Tsuen Wan By-pass, Stage I (Kwai Chung Road to Cost $ 490,000 Texaco Road) 66,700,000 Tsuen Wan By-pass Site Investigation and Resumption, Stage I 7,000,000 Kwai Chung Industrial Areas 27, 28 and 29 (part) - Drainage and Roads 8,200,000 Flyover Linking Kwai Chung Area 11 and 10 17,400,000 Lai Chi Kok Terrace Road 4,420,000 Kwai Chung Development Areas 10G, 10H and 37B, Roads and Drainage and Link Road 18,450,000 Footbridge over Castle Peak Road at Chung On Street, Tsuen Wan 810,000 Kwai Chung Development, Access Road to Kwai Chung Incinerator 4,100,000 Second Lion Rock Tunnel, Stage II, Roads and Ancillary Works 33,000,000 Lion Rock Tunnel Road North Portal to Siu Lek Yuen - Road Completion of Second Carriageway 6,000,000 Desilting Kwai Chung Main Culvert 500,000 Repair to drainage slope at Road D5, Tuen Mun New Town (near River Channel) 240,000 Repair to damaged cutting slope and landslip at “sing Yi Island, opposite China Light & Power Station 600,000 Construction of Urn Burial Terraces Cemetery - 8th Contract Resurfacing Castle Peak Road from M.S. 16 c/9 to M.S. 18 Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57, Tsing Yi Island h Wo Hop Shek 627,000 134,000 150,000 423
2026-05-12 08:12:43 · Baseline
View content

APPENDIX Y

Contd.

Estimated

Project

Improvement of Luk Keng Road Minimal Improvements

Tsuen Wan By-pass, Stage I (Kwai Chung Road to

Cost

$

490,000

Texaco Road)

66,700,000

Tsuen Wan By-pass

Site Investigation and Resumption,

Stage I

7,000,000

Kwai Chung Industrial Areas 27, 28 and 29 (part) -

Drainage and Roads

8,200,000

Flyover Linking Kwai Chung Area 11 and 10

17,400,000

Lai Chi Kok Terrace Road

4,420,000

Kwai Chung Development Areas 10G, 10H and 37B,

Roads and Drainage and Link Road

18,450,000

Footbridge over Castle Peak Road at Chung On Street,

Tsuen Wan

810,000

Kwai Chung Development, Access Road to Kwai Chung

Incinerator

4,100,000

Second Lion Rock Tunnel, Stage II, Roads and

Ancillary Works

33,000,000

Lion Rock Tunnel Road

North Portal to Siu Lek Yuen

-

Road Completion of Second Carriageway

6,000,000

Desilting Kwai Chung Main Culvert

500,000

Repair to drainage slope at Road D5, Tuen Mun New Town

(near River Channel)

240,000

Repair to damaged cutting slope and landslip at “sing Yi

Island, opposite China Light & Power Station

600,000

Construction of Urn Burial Terraces

Cemetery - 8th Contract

Resurfacing Castle Peak Road from M.S. 16 c/9 to

M.S. 18

Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57,

Tsing Yi Island

h

Wo Hop Shek

627,000

134,000

150,000