APPENDIX Y
Contd.
Estimated
Project
Improvement of Luk Keng Road Minimal Improvements $ 490,000 Tsuen Wan By-pass, Stage I (Kwai Chung Road to Texaco Road) 66,700,000 Tsuen Wan By-pass Site Investigation and Resumption, Stage I 7,000,000 Kwai Chung Industrial Areas 27, 28 and 29 (part) - Drainage and Roads 8,200,000 Flyover Linking Kwai Chung Area 11 and 10 17,400,000 Lai Chi Kok Terrace Road 4,420,000 Kwai Chung Development Areas 10G, 10H and 37B, Roads and Drainage and Link Road 18,450,000 Footbridge over Castle Peak Road at Chung On Street, Tsuen Wan 810,000 Kwai Chung Development, Access Road to Kwai Chung Incinerator 4,100,000 Second Lion Rock Tunnel, Stage II, Roads and Ancillary Works 33,000,000 Lion Rock Tunnel Road North Portal to Siu Lek Yuen - Road Completion of Second Carriageway 6,000,000 Desilting Kwai Chung Main Culvert 500,000 Repair to drainage slope at Road D5, Tuen Mun New Town (near River Channel) 240,000 Repair to damaged cutting slope and landslip at Tsing Yi Island, opposite China Light & Power Station 600,000 Construction of Urn Burial Terraces Wo Hop Shek Cemetery - 8th Contract 627,000 Resurfacing Castle Peak Road from M.S. 16 c/9 to M.S. 18 134,000 Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57, Tsing Yi Island 150,000 423APPENDIX Y
Contd.
Estimated
Project
Improvement of Luk Keng Road Minimal Improvements
Tsuen Wan By-pass, Stage I (Kwai Chung Road to
Cost
$
490,000
Texaco Road)
66,700,000
Tsuen Wan By-pass
Site Investigation and Resumption,
Stage I
7,000,000
Kwai Chung Industrial Areas 27, 28 and 29 (part) -
Drainage and Roads
8,200,000
Flyover Linking Kwai Chung Area 11 and 10
17,400,000
Lai Chi Kok Terrace Road
4,420,000
Kwai Chung Development Areas 10G, 10H and 37B,
Roads and Drainage and Link Road
18,450,000
Footbridge over Castle Peak Road at Chung On Street,
Tsuen Wan
810,000
Kwai Chung Development, Access Road to Kwai Chung
Incinerator
4,100,000
Second Lion Rock Tunnel, Stage II, Roads and
Ancillary Works
33,000,000
Lion Rock Tunnel Road
North Portal to Siu Lek Yuen
-
Road Completion of Second Carriageway
6,000,000
Desilting Kwai Chung Main Culvert
500,000
Repair to drainage slope at Road D5, Tuen Mun New Town
(near River Channel)
240,000
Repair to damaged cutting slope and landslip at “sing Yi
Island, opposite China Light & Power Station
600,000
Construction of Urn Burial Terraces
Cemetery - 8th Contract
Resurfacing Castle Peak Road from M.S. 16 c/9 to
M.S. 18
Diversion of Stormwater Drains for Lot No. T.Y.T.L. 57,
Tsing Yi Island
h
Wo Hop Shek
627,000
134,000
150,000
423