Item No.
17A
APPENDIX L
ARCHITECTURAL OFFICE
BUILDING PROJECTS ESTIMATED TO COST MORE THAN $50,000.00 ON WHICH CONSTRUCTION OR SITE FORMATION WAS IN PROGRESS AT THE END OF 1974/75
Project Title Kai Tak Terminal Building Modifications Top Priority Works: (a) - Passenger Pier and Apron Dock in Stand No. 5. (b) Airside Waiting Accommodation. (c) Building Services Unit. (a) Temporary Ramp to Departure Level, Eastern half of Podium/Vehicular Deck and Provision of Access from Podium to Prince Edward Road. (e) Eastwards Extension of the Main Block of the Terminal Building at Basement, Arrival and Departure Levels. (f) Improvements to Fire Services Installations in existing Building. (g) Installation of Baggage Handling Systems in the extended Terminal Building at both Arrival and Departure Levels. (h) Provision of Communications System between the check-in Counters and the Load Control Offices. (i) 96 No. Check-in Counters in Passenger Terminal Areas and Baggage Weighing Scales by each Counter. Estimated Building Cost $133,129,000 20A Installation of Secondary Surveillance Radar on Mount Parker. $1,197,000 56E Kwai Chung Technical Institute. $13,196,000 57E Technical Institute, Kwun Tong. $15,742,000 62E Alterations and Improvements at Old Northcote Training College - Phase II. $136,000 28F Mount Davis Ambulance Depot. $3,528,000 63F Improvement of Hot Water Facilities at Fire and Ambulance Stations. $360,000168
Item No.
17A
APPENDIX L
ARCHITECTURAL OFFICE
BUILDING PROJECTS ESTIMATED TO COST MORE THAN $50,000.00 ON WHICH CONSTRUCTION OR SITE FORMATION WAS IN PROGRESS AT THE END OF 1974/75
Project Title
Kai Tak Terminal Building Modifications Top Priority Works:
(a)
-
Passenger Pier and Apron Dock in Stand No. 5. (b) Airside Waiting Accommodation.
(c) Building Services Unit.
(a)
Temporary Ramp to Departure Level, Eastern half of Podium/Vehicular Deck and Provision of Access from Podium to Prince Edward Road. (e) Eastwards Extension of the Main Block of
the Terminal Building at Basement, Arrival and Departure Levels.
(f) Improvements to Fire Services Installations
in existing Building.
(g) Installation of Baggage Handling Systems in the extended Terminal Building at both Arrival and Departure Levels.
(h) Provision of Communications System between the check-in Counters and the Load Control Offices.
(i) 96 No. Check-in Counters in Passenger
Terminal Areas and Baggage Weighing Scales by each Counter.
Estimated Building Cost $ 133,129,000
20A
Installation of Secondary Surveillance Radar on Mount Parker.
1,197,000
56E
Kwai Chung Technical Institute.
13,196,000
57E
Technical Institute, Kwun Tong.
15,742,000
62E
Alterations and Improvements at Old Northcote
136,000
Training College
•
Phase II.
28F
Mount Davis Ambulance Depot.
3,528,000
63F
Improvement of Hot Water Facilities at Fire and Ambulance Stations.
360,000
168