8.45 The Kennedy Town Abattoir plant continued to operate smoothly throughout the year and the annual overhaul of all equipment was carried out on a 'one-line-at-a-time' basis during the first quarter. An extension of the By-Product Plant is in the design stage and is being handled by the Design and Projects Division of this Office. During the year 367 mechanical and 287 electrical repairs were carried out in addition to routine maintenance.

8.46 The Cheung Sha Wan Abattoir also continued to operate smoothly throughout the year. Night slaughtering was commenced on 1st November and additional staff was approved to cope with this. With night slaughtering it has been possible for major maintenance to be carried out on a 'one-line-at-a-time' basis. During the year 570 mechanical and 537 electrical repairs were carried out in addition to routine maintenance.

8.47 Compost was not produced from the Lai Chi Kok Compost Plant and towards the end of the year it was decided that the Plant, due to lack of demand for the product, be shut down permanently with a view to its being disposed of.

Air-conditioning and Refrigeration Plants

8.48 These Sections maintain all air-conditioning plants including associated water pumps with chlorination equipment and refrigeration plants. At the end of the year 287 air-conditioning plants totalling 15,629.15 tons of refrigeration were in operation. This figure includes 62 plants which are the property of H.B.M. Department of the Environment and which are maintained by this office. In addition to plant operation, maintenance visits were paid to non-attended plant; these included 1,637 visits to minor air-conditioning plant, 212 visits to refrigeration plant, 1,124 visits to water pumps and 506 visits to chlorination equipment. In addition 266 fault calls were attended.

City Hall

8.49 The City Hall Electrical and Mechanical Services Section maintains all the electrical, mechanical and air-conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replacement of lamps of all types, installation of temporary wiring for flood and display lighting and operating the 700 TR air-conditioning plant as well as 21 zone cabinets. Operators were provided for the stage lighting of 1,082 performances and rehearsals, 328 cinema projections

112

Edit History

2026-05-12 04:32:02 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
8.45 The Kennedy Town Abattoir plant continued to operate smoothly throughout the year and the annual overhaul of all equipment was carried out on a 'one-line-at-a-time' basis during the first quarter. An extension of the By-Product Plant is in the design stage and is being handled by the Design and Projects Division of this Office. During the year 367 mechanical and 287 electrical repairs were carried out in addition to routine maintenance. 8.46 The Cheung Sha Wan Abattoir also continued to operate smoothly throughout the year. Night slaughtering was commenced on 1st November and additional staff was approved to cope with this. With night slaughtering it has been possible for major maintenance to be carried out on a 'one-line-at-a-time' basis. During the year 570 mechanical and 537 electrical repairs were carried out in addition to routine maintenance. 8.47 Compost was not produced from the Lai Chi Kok Compost Plant and towards the end of the year it was decided that the Plant, due to lack of demand for the product, be shut down permanently with a view to its being disposed of. Air-conditioning and Refrigeration Plants 8.48 These Sections maintain all air-conditioning plants including associated water pumps with chlorination equipment and refrigeration plants. At the end of the year 287 air-conditioning plants totalling 15,629.15 tons of refrigeration were in operation. This figure includes 62 plants which are the property of H.B.M. Department of the Environment and which are maintained by this office. In addition to plant operation, maintenance visits were paid to non-attended plant; these included 1,637 visits to minor air-conditioning plant, 212 visits to refrigeration plant, 1,124 visits to water pumps and 506 visits to chlorination equipment. In addition 266 fault calls were attended. City Hall 8.49 The City Hall Electrical and Mechanical Services Section maintains all the electrical, mechanical and air-conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replacement of lamps of all types, installation of temporary wiring for flood and display lighting and operating the 700 TR air-conditioning plant as well as 21 zone cabinets. Operators were provided for the stage lighting of 1,082 performances and rehearsals, 328 cinema projections 112
Baseline (Original)
8.45 The Kennedy Town Abattoir plant continued to operate smoothly throughout the year and the annual overhaul of all equip- ment was carried out on a 'one-line-at-a-time' basis during the first quarter. An extension of the By-Product Plant is in the design stage and is being handled by the Design and Projects Division of this Office. During the year 367 mechanical and 287 electrical repairs were carried out in addition to routine maintenance. 8.46 The Cheung Sha Wan Abattoir also continued to operate smoothly throughout the year. Night slaughtering was commenced on 1st November and additional staff was approved to cope with this. With night slaughtering it has been possible for major maintenance to be carried out on a 'one-line-at-a-time' basis. During the year 570 mechanical and 537 electrical repairs were carried out in addition to routine maintenance. 8.47 Compost was not produced from the Lai Chi Kok Compost Plant and towards the end of the year it was decided that the Plant, due to lack of demand for the product, be shut down permanently with a view to its being disposed of. Air-conditioning and Refrigeration Plants 8.48 These Sections maintain all air-conditioning plants including associated water pumps with chlorination equipment and refrigeration plants. At the end of the year 287 air-conditioning plants totalling 15,629.15 tons of refrigeration were in operation. This figure includes 62 plants which are the property of H.B.M. Department of the Environment and which are maintained by this office. In addition to plant operation, maintenance visits were paid to non-attended plant; these included 1,637 visits to minor air-conditioning plant, 212 visits to refrigeration plant, 1,124 visits to water pumps and 506 visits to chlorination equipment. In addition 266 fault calls were attended. City Hall 8.49 The City Hall Electrical and Mechanical Services Section main- tains all the electrical, mechanical and air-conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replace- ment of lamps of all types, installation of temporary wiring for flood and display lighting and operating the 700 TR air-conditioning plant as well as 21 zone cabinets. Operators were provided for the stage lighting of 1,082 performances and rehearsals, 328 cinema projections 112
2026-05-12 04:32:02 · Baseline
View content

8.45 The Kennedy Town Abattoir plant continued to operate smoothly throughout the year and the annual overhaul of all equip- ment was carried out on a 'one-line-at-a-time' basis during the first quarter. An extension of the By-Product Plant is in the design stage and is being handled by the Design and Projects Division of this Office. During the year 367 mechanical and 287 electrical repairs were carried out in addition to routine maintenance.

8.46 The Cheung Sha Wan Abattoir also continued to operate smoothly throughout the year. Night slaughtering was commenced on 1st November and additional staff was approved to cope with this. With night slaughtering it has been possible for major maintenance to be carried out on a 'one-line-at-a-time' basis. During the year 570 mechanical and 537 electrical repairs were carried out in addition to routine maintenance.

8.47 Compost was not produced from the Lai Chi Kok Compost Plant and towards the end of the year it was decided that the Plant, due to lack of demand for the product, be shut down permanently with a view to its being disposed of.

Air-conditioning and Refrigeration Plants

8.48 These Sections maintain all air-conditioning plants including associated water pumps with chlorination equipment and refrigeration plants. At the end of the year 287 air-conditioning plants totalling 15,629.15 tons of refrigeration were in operation. This figure includes 62 plants which are the property of H.B.M. Department of the Environment and which are maintained by this office. In addition to plant operation, maintenance visits were paid to non-attended plant; these included 1,637 visits to minor air-conditioning plant, 212 visits to refrigeration plant, 1,124 visits to water pumps and 506 visits to chlorination equipment. In addition 266 fault calls were attended.

City Hall

8.49 The City Hall Electrical and Mechanical Services Section main- tains all the electrical, mechanical and air-conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replace- ment of lamps of all types, installation of temporary wiring for flood and display lighting and operating the 700 TR air-conditioning plant as well as 21 zone cabinets. Operators were provided for the stage lighting of 1,082 performances and rehearsals, 328 cinema projections