1971-1972 — Page 197

Public Works Department Annual Report 工務司署年報 All AI Reviewed

APPENDIX P

CIVIL ENGINEERING OFFICE

CIVIL ENGINEERING PROJECTS ON WHICH CONSTRUCTION CONTINUED OR COMMENCED DURING 1971–72

Project Approximate Cost $ Port Works Wan Chai Reclamation, Stage I 24,500,000 Sandy Bay Reclamation, Stage II ... Incinerator Plant, Hong Kong Island 5,700,000 Supply and Installation of Plant for Cutting up Poultry Crates—Kennedy Town ... ... 21,470,000 Light Beacon at Ngan Chau 150,000 Tong Mi Road Extension and Reclamation, Stage I 70,000 Tong Mi Road Extension and Reclamation, Stage II 5,220,000 Incinerator and Composting Plant, Kowloon ... Second Incinerator in Kowloon 21,120,000 ... 28,730,000 ... 33,500,000 ... 850,000 ... 1,860,000 ... 6,350,000 ... 15,000,000 ... 90,000 ... 550,000 ... ... ... 20,000 Feasibility Study of a Proposed Container Terminal at Kwai Chung ... Container Terminal at Kwai Chung, Clearance of Borrow Areas ... Container Terminal at Kwai Chung, Access Roads ... Container Terminal at Kwai Chung, Dredging of Approaches ... Provision of Light Beacons at Rambler Channel Typhoon Shelter ... Dolphin at Old Cattle Pier, Kennedy Town ... Refuse Disposal by Controlled Tipping (Hong Kong), Investigation ... Development and Airport Works Resiting the Railway Terminus, Preliminary Works 2,519,000 Kowloon Canton Railway-Hung Hom Development, Stage II 18,800,000 Kowloon Canton Railway-Hung Hom Development, Stage III, Phase I ... ... 24,000,000 Kowloon Bay Development Drainage Works-Stage I 5,260,000 Aircraft Long-Term Parking Areas, Kai Tak Airport 3,200,000 ... ... ... 176

Edit History

2026-05-12 03:32:57 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
APPENDIX P CIVIL ENGINEERING OFFICE CIVIL ENGINEERING PROJECTS ON WHICH CONSTRUCTION CONTINUED OR COMMENCED DURING 1971–72 Project Approximate Cost $ Port Works Wan Chai Reclamation, Stage I 24,500,000 Sandy Bay Reclamation, Stage II ... Incinerator Plant, Hong Kong Island 5,700,000 Supply and Installation of Plant for Cutting up Poultry Crates—Kennedy Town ... ... 21,470,000 Light Beacon at Ngan Chau 150,000 Tong Mi Road Extension and Reclamation, Stage I 70,000 Tong Mi Road Extension and Reclamation, Stage II 5,220,000 Incinerator and Composting Plant, Kowloon ... Second Incinerator in Kowloon 21,120,000 ... 28,730,000 ... 33,500,000 ... 850,000 ... 1,860,000 ... 6,350,000 ... 15,000,000 ... 90,000 ... 550,000 ... ... ... 20,000 Feasibility Study of a Proposed Container Terminal at Kwai Chung ... Container Terminal at Kwai Chung, Clearance of Borrow Areas ... Container Terminal at Kwai Chung, Access Roads ... Container Terminal at Kwai Chung, Dredging of Approaches ... Provision of Light Beacons at Rambler Channel Typhoon Shelter ... Dolphin at Old Cattle Pier, Kennedy Town ... Refuse Disposal by Controlled Tipping (Hong Kong), Investigation ... Development and Airport Works Resiting the Railway Terminus, Preliminary Works 2,519,000 Kowloon Canton Railway-Hung Hom Development, Stage II 18,800,000 Kowloon Canton Railway-Hung Hom Development, Stage III, Phase I ... ... 24,000,000 Kowloon Bay Development Drainage Works-Stage I 5,260,000 Aircraft Long-Term Parking Areas, Kai Tak Airport 3,200,000 ... ... ... 176
Baseline (Original)
APPENDIX P CIVIL ENGINEERING OFFICE CIVIL ENGINEERING PROJECTS ON WHICH CONSTRUCTION CONTINUED OR COMMENCED DURING 1971–72 Project Approximate Cost $ Port Works Wan Chai Reclamation, Stage I Sandy Bay Reclamation, Stage II Incinerator Plant, Hong Kong Island : Supply and Installation of Plant for Cutting up Poultry Crates— Kennedy Town ... Light Beacon at Ngan Chau Tong Mi Road Extension and Reclamation, Stage I Tong Mi Road Extension and Reclamation, Stage II Incinerator and Composting Plant, Kowloon Second Incinerator in Kowloon ... ... 24,500,000 ... ... 5,700,000 ... ... + 21,470,000 150,000 ... 70,000 5,220,000 ... ... 21,120,000 28,730,000 33,500,000 ... 850,000 ... 1,860,000 6,350,000 15,000,000 90,000 ... 550,000 ... ... 20,000 ... Feasibility Study of a Proposed Container Terminal at Kwai Chung... Container Terminal at Kwai Chung, Clearance of Borrow Areas Container Terminal at Kwai Chung, Access Roads Container Terminal at Kwai Chung, Dredging of Approaches Provision of Light Beacons at Rambler Channel Typhoon Shelter Dolphin at Old Cattle Pier, Kennedy Town Refuse Disposal by Controlled Tipping (Hong Kong), Investigation... Development and Airport Works Resiting the Railway Terminus, Preliminary Works ... 2,519,000 Kowloon Canton Railway-Hung Hom Development, Stage II Kowloon Canton Railway-Hung Hom Development, Stage III, Phase I ... 18,800,000 .. ... 24,000,000 Kowloon Bay Development Drainage Works-Stage I Aircraft Long-Term Parking Areas, Kai Tak Airport ... ... 5,260,000 3,200,000 176
2026-05-12 03:32:57 · Baseline
View content

APPENDIX P

CIVIL ENGINEERING OFFICE

CIVIL ENGINEERING PROJECTS ON WHICH CONSTRUCTION CONTINUED OR COMMENCED DURING 1971–72

Project

Approximate Cost

$

Port Works

Wan Chai Reclamation, Stage I

Sandy Bay Reclamation, Stage II

Incinerator Plant, Hong Kong Island

:

Supply and Installation of Plant for Cutting up Poultry Crates—

Kennedy Town

...

Light Beacon at Ngan Chau

Tong Mi Road Extension and Reclamation, Stage I Tong Mi Road Extension and Reclamation, Stage II

Incinerator and Composting Plant, Kowloon

Second Incinerator in Kowloon ...

...

24,500,000

...

...

5,700,000

...

...

+

21,470,000

150,000

...

70,000

5,220,000

...

...

21,120,000

28,730,000

33,500,000

...

850,000

...

1,860,000

6,350,000

15,000,000

90,000

...

550,000

...

...

20,000

...

Feasibility Study of a Proposed Container Terminal at Kwai Chung... Container Terminal at Kwai Chung, Clearance of Borrow Areas

Container Terminal at Kwai Chung, Access Roads Container Terminal at Kwai Chung, Dredging of Approaches

Provision of Light Beacons at Rambler Channel Typhoon Shelter

Dolphin at Old Cattle Pier, Kennedy Town

Refuse Disposal by Controlled Tipping (Hong Kong), Investigation...

Development and Airport Works

Resiting the Railway Terminus, Preliminary Works ...

2,519,000

Kowloon Canton Railway-Hung Hom Development, Stage II

Kowloon Canton Railway-Hung Hom Development, Stage III,

Phase I

...

18,800,000

..

...

24,000,000

Kowloon Bay Development Drainage Works-Stage I

Aircraft Long-Term Parking Areas, Kai Tak Airport

...

...

5,260,000

3,200,000

176

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.