10.33 A recommendation was made on the means of providing filtered water supplies to proposed development in the high level areas of Ngau Chi Wan, Hammer Hill, Shun Lee Tsuen, Sau Mau Ping and Lam Tin. A similar study on the provision of sea water flushing supplies was nearly completed.
10.34 A study of the future water supply requirements for all the high level areas on the Island was completed.
10.35 A recommendation for meeting the increase in demand in the Sheung Shui and Tai Po districts, comprising the installation of additional pumping and treatment plant and the construction of a new service reservoir and pipelines, was made.
10.36 A study of the necessary workshop and depot facilities to meet future requirements was put in hand and recommendations on the reprovisioning of the existing inadequate facilities were being finalized.
10.37 An investigation into the economic utilization of several undeveloped minor water catchment areas continued.
10.38 An investigation into the causes of silting and pollution of Jordan Valley and Ma Lau Tong Flushing Reservoirs was put in hand.
10.39 A re-appraisal of the growth of demand over the western parts of the New Territories including Tsuen Wan, Kwai Chung, Castle Peak New Town Stage 1A and 1B and Yuen Long was carried out and recommendations for additional installations at Tsuen Wan and Kwai Chung were made.
10.40 The growth of flushing water demand in the Central, Western and mid-level districts on the Island was investigated and proposals for improvements were substantially completed.
MECHANICAL DIVISION
Chief Engineer:
R. J. JOHNSON, C.Eng., M.I.Mech.E., M.I.W.E.
C. LI, A.F.R.Ae.S., M.I.Mech.E. (Acting)
General
10.41 The Division is responsible for the operation and maintenance of waterworks mechanical plant and equipment and for the design,
141
10.33 A recommendation was made on the means of providing filtered water supplies to proposed development in the high level areas of Ngau Chi Wan, Hammer Hill, Shun Lee Tsuen, Sau Mau Ping and Lam Tin. A similar study on the provision of sea water flushing supplies was nearly completed.
10.34 A study of the future water supply requirements for all the high level areas on the Island was completed.
10.35 A recommendation for meeting the increase in demand in the Sheung Shui and Tai Po districts, comprising the installation of additional pumping and treatment plant and the construction of a new service reservoir and pipelines, was made.
10.36 A study of the necessary workshop and depot facilities to meet future requirements was put in hand and recommendations on the reprovisioning of the existing inadequate facilities were being finalized.
10.37 An investigation into the economic utilization of several undeveloped minor water catchment areas continued.
10.38 An investigation into the causes of silting and pollution of Jordan Valley and Ma Lau Tong Flushing Reservoirs was put in hand.
10.39 A re-appraisal of the growth of demand over the western parts of the New Territories including Tsuen Wan, Kwai Chung, Castle Peak New Town Stage 1A and 1B and Yuen Long was carried out and recommendations for additional installations at Tsuen Wan and Kwai Chung were made.
10.40 The growth of flushing water demand in the Central, Western and mid-level districts on the Island was investigated and proposals for improvements were substantially completed.
MECHANICAL DIVISION
Chief Engineer:
R. J. JOHNSON, C.Eng., M.I.Mech.E., M.I.W.E.
C. LI, A.F.R.Ae.S., M.I.Mech.E. (Acting)
General
10.41 The Division is responsible for the operation and maintenance of waterworks mechanical plant and equipment and for the design,