1971-1972 — Page 131

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Committee

Standing Conference on Road Use

Tsuen Wan/Kwai Chung Management Committee

Keep Hong Kong Clean Campaign Committee

Building Construction and Civil Engineering Metrication Sub-Committee

Representative(s)

Government Highway Engineer, Traffic and Transport

Government Highway Engineer, Works

Government Highway Engineer, Works

Government Highway Engineer, Works

HIGHWAYS DIVISIONS

Chief Engineers:

Hong Kong Island: WONG Mang-ki, B.Sc.(Eng.), C.Eng., M.I.C.E.

Kowloon: C. N. FONG, B.Sc.(Eng.), C.Eng., M.I.C.E.

New Territories: B. H. NEWMAN, B.Sc.(Eng.), C.Eng., F.I.C.E., M.A.S.C.E. (Acting)

A. D. S. MACDONALD, B.Sc.(Eng.), C.Eng., M.I.C.E. (Acting)

C. W. H. DALLAS, C.Eng., M.I.C.E.

TSANG Nai-lok, B.Sc.(Eng.), C.Eng., M.I.C.E. (Acting)

General

9.06 These three divisions, regionally located on Hong Kong Island, in Kowloon and in the New Territories are responsible for the design, construction and maintenance of the roads and associated sewerage and drainage systems.

9.07 The total number of major projects completed in the year numbered 47 with an aggregate value of $46 million and those in hand numbered 76 with an aggregate value of $233 million. Details and progress on some of these projects are described in paragraph 9.14 to 9.26.

Maintenance

9.08 With the rapid growth in car ownership, a substantial part of the Divisions' effort had to be devoted to the maintenance and improvement of the existing road network. Altogether 22.8 miles of road were resurfaced and 5.6 miles reconstructed. About $1.25 million was spent in repairing road damage and clearance of landslips caused by typhoons and rainstorms.

Page 115

Edit History

2026-05-12 03:18:22 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Committee Standing Conference on Road Use Tsuen Wan/Kwai Chung Management Committee Keep Hong Kong Clean Campaign Committee Building Construction and Civil Engineering Metrication Sub-Committee Representative(s) Government Highway Engineer, Traffic and Transport Government Highway Engineer, Works Government Highway Engineer, Works Government Highway Engineer, Works HIGHWAYS DIVISIONS Chief Engineers: Hong Kong Island: WONG Mang-ki, B.Sc.(Eng.), C.Eng., M.I.C.E. Kowloon: C. N. FONG, B.Sc.(Eng.), C.Eng., M.I.C.E. New Territories: B. H. NEWMAN, B.Sc.(Eng.), C.Eng., F.I.C.E., M.A.S.C.E. (Acting) A. D. S. MACDONALD, B.Sc.(Eng.), C.Eng., M.I.C.E. (Acting) C. W. H. DALLAS, C.Eng., M.I.C.E. TSANG Nai-lok, B.Sc.(Eng.), C.Eng., M.I.C.E. (Acting) General 9.06 These three divisions, regionally located on Hong Kong Island, in Kowloon and in the New Territories are responsible for the design, construction and maintenance of the roads and associated sewerage and drainage systems. 9.07 The total number of major projects completed in the year numbered 47 with an aggregate value of $46 million and those in hand numbered 76 with an aggregate value of $233 million. Details and progress on some of these projects are described in paragraph 9.14 to 9.26. Maintenance 9.08 With the rapid growth in car ownership, a substantial part of the Divisions' effort had to be devoted to the maintenance and improvement of the existing road network. Altogether 22.8 miles of road were resurfaced and 5.6 miles reconstructed. About $1.25 million was spent in repairing road damage and clearance of landslips caused by typhoons and rainstorms. Page 115
Baseline (Original)
Committee Standing Conference on Road Use Tsuen Wan/Kwai Chung Management Committee Keep Hong Kong Clean Campaign Committee Building Construction and Civil Engineering Metrication Sub-Committee Representative(s) Government Highway Engineer, Traffic and Transport Government Highway Engineer, Works Government Highway Engineer, Works Government Highway Engineer, Works HIGHWAYS DIVISIONS Chief Engineers: Hong Kong Island: WONG Mang-ki, B.Sc. (Eng.), C.Eng., M.I.C.E. Kowloon: New Territories: A. D. S. MACDONALD, B.Sc. (Eng.), C.Eng., M.I.C.E. (Acting) C. N. FONG, B.Sc. (Eng.), C.Eng., M.I.C.E. B. H. NEWMAN, B.Sc. (Eng.), C.Eng., F.I.C.E., M.A.S.C.E. (Acting) C. W. H. DALLAS, C.Eng., M.I.C.E. TSANG Nai-lok, B.Sc. (Eng.), C.Eng., M.I.C.E. (Acting) General 9.06 These three divisions, regionally located on Hong Kong Island, in Kowloon and in the New Territories are responsible for the design, construction and maintenance of the roads and associated sewerage and drainage systems. 9.07 The total number of major projects completed in the year numbered 47 with an aggregate value of $46 million and those in hand numbered 76 with an aggregate value of $233 million. Details and pro- gress on some of these projects are described in paragraph 9.14 to 9.26. Maintenance 9.08 With the rapid growth in car ownership, a substantial part of the Divisions' effort had to be devoted to the maintenance and im- provement of the existing road network. Altogether 22.8 miles of road were resurfaced and 5.6 miles reconstructed. About $1.25 million was spent in repairing road damage and clearance of landslips caused by typhoons and rainstorms. 115
2026-05-12 03:18:22 · Baseline
View content

Committee

Standing Conference on Road Use

Tsuen Wan/Kwai Chung Management

Committee

Keep Hong Kong Clean Campaign

Committee

Building Construction and Civil

Engineering Metrication Sub-Committee

Representative(s)

Government Highway Engineer,

Traffic and Transport

Government Highway Engineer,

Works

Government Highway Engineer,

Works

Government Highway Engineer,

Works

HIGHWAYS DIVISIONS

Chief Engineers:

Hong Kong Island: WONG Mang-ki, B.Sc. (Eng.), C.Eng., M.I.C.E.

Kowloon:

New Territories:

A. D. S. MACDONALD, B.Sc. (Eng.), C.Eng., M.I.C.E.

(Acting)

C. N. FONG, B.Sc. (Eng.), C.Eng., M.I.C.E.

B. H. NEWMAN, B.Sc. (Eng.), C.Eng., F.I.C.E., M.A.S.C.E.

(Acting)

C. W. H. DALLAS, C.Eng., M.I.C.E.

TSANG Nai-lok, B.Sc. (Eng.), C.Eng., M.I.C.E. (Acting)

General

9.06 These three divisions, regionally located on Hong Kong Island, in Kowloon and in the New Territories are responsible for the design, construction and maintenance of the roads and associated sewerage and drainage systems.

9.07 The total number of major projects completed in the year numbered 47 with an aggregate value of $46 million and those in hand numbered 76 with an aggregate value of $233 million. Details and pro- gress on some of these projects are described in paragraph 9.14 to 9.26.

Maintenance

9.08 With the rapid growth in car ownership, a substantial part of the Divisions' effort had to be devoted to the maintenance and im- provement of the existing road network. Altogether 22.8 miles of road were resurfaced and 5.6 miles reconstructed. About $1.25 million was spent in repairing road damage and clearance of landslips caused by typhoons and rainstorms.