repair operations including repair standards, manpower utilization and machinery, work evaluation, utilization standardization of working procedures and maintenance of equipment records. It is intended that eventually the work of this Section will be extended to Plant Operation.

8.13 The Workshops Section has two main Workshops located at Caroline Hill, Hong Kong and Sung Wong Toi Road, Kowloon, and a Sub-Workshop at Fan Gardens in the New Territories. The Main Workshops are further divided into Mechanical, Electrical and Air-Conditioning Sub-Sections. Both main Workshops continue to be extremely short of space as commitments continue to grow at about 8% per annum compounded. The two Maintenance and Repair Depots included in the Public Works Programme with a view to easing congestion are nearing completion, whilst a workshop extension has been proposed for Caroline Hill. The Senior Engineer (Workshops) is also responsible for the Parking Meter Section.

8.14 The Vehicle Design and Procurement Section is responsible for the preparation of vehicle and mobile plant specifications including specialized plant and vehicles, the design of non-standard vehicle bodies, co-ordination of the Government's annual vehicle requirements, contracts for vehicle bodywork construction, bodywork repair and repainting, construction of refuse handcarts and bulk containers together with the supervision of such contracts. Certain very specialized design work is also being undertaken on behalf of the Commissioner of Police. This Section is also responsible for the Transport Pool within the Government Fleet.

8.15 The Plant Operation Section operates and maintains major plants and is divided into six groups, namely, Incineration Plants and Abattoirs, major Air-Conditioning Plants and the Engineering Services of Hospitals, Kai Tak Airport, Lion Rock Tunnel and the City Hall. The majority of the plants are required to provide a 24-hour year-round service.

8.16 The Military Works Section, headed by a serving Officer of the Royal Engineers seconded to this Sub-department, is responsible for the operation and minor maintenance of non-combat electrical and mechanical equipment in Royal Naval, Army and Royal Air Force installations, barracks and some 3,500 services married quarters in the Colony. This involves the operation of Cold Stores, Boilers,

Page 97

Edit History

2026-05-12 03:15:25 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
repair operations including repair standards, manpower utilization and machinery, work evaluation, utilization standardization of working procedures and maintenance of equipment records. It is intended that eventually the work of this Section will be extended to Plant Operation. 8.13 The Workshops Section has two main Workshops located at Caroline Hill, Hong Kong and Sung Wong Toi Road, Kowloon, and a Sub-Workshop at Fan Gardens in the New Territories. The Main Workshops are further divided into Mechanical, Electrical and Air-Conditioning Sub-Sections. Both main Workshops continue to be extremely short of space as commitments continue to grow at about 8% per annum compounded. The two Maintenance and Repair Depots included in the Public Works Programme with a view to easing congestion are nearing completion, whilst a workshop extension has been proposed for Caroline Hill. The Senior Engineer (Workshops) is also responsible for the Parking Meter Section. 8.14 The Vehicle Design and Procurement Section is responsible for the preparation of vehicle and mobile plant specifications including specialized plant and vehicles, the design of non-standard vehicle bodies, co-ordination of the Government's annual vehicle requirements, contracts for vehicle bodywork construction, bodywork repair and repainting, construction of refuse handcarts and bulk containers together with the supervision of such contracts. Certain very specialized design work is also being undertaken on behalf of the Commissioner of Police. This Section is also responsible for the Transport Pool within the Government Fleet. 8.15 The Plant Operation Section operates and maintains major plants and is divided into six groups, namely, Incineration Plants and Abattoirs, major Air-Conditioning Plants and the Engineering Services of Hospitals, Kai Tak Airport, Lion Rock Tunnel and the City Hall. The majority of the plants are required to provide a 24-hour year-round service. 8.16 The Military Works Section, headed by a serving Officer of the Royal Engineers seconded to this Sub-department, is responsible for the operation and minor maintenance of non-combat electrical and mechanical equipment in Royal Naval, Army and Royal Air Force installations, barracks and some 3,500 services married quarters in the Colony. This involves the operation of Cold Stores, Boilers, Page 97
Baseline (Original)
repair operations including repair standards, manpower utilization and and machinery, work evaluation, utilization standardization of working procedures and maintenance of equipment records. It is intended that eventually the work of this Section will be extended to Plant Operation. 8.13 The Workshops Section has two main Workshops located at Caroline Hill, Hong Kong and Sung Wong Toi Road, Kowloon, and a Sub-Workshops at Fan Gardens in the New Territories. The Main Workshops are further divided into Mechanical, Electrical and Air- Conditioning Sub-Sections. Both main Workshops continue to be extremely short of space as commitments continue to grow at about 8% per annum compounded. The two Maintenance and Repair Depots included in the Public Works Programme with a view to easing conges- tion are nearing completion, whilst a workshop extension has been proposed for Caroline Hill. The Senior Engineer (Workshops) is also responsible for the Parking Meter Section. 8.14 The Vehicle Design and Procurement Section is responsible for the preparation of vehicle and mobile plant specifications including specialized plant and vehicles, the design of non-standard vehicle bodies, co-ordination of the Government's annual vehicle requirements, contracts for vehicle bodywork construction, bodywork repair and repainting, construction of refuse handcarts and bulk containers together with the supervision of such contracts. Certain very specialized design work is also being undertaken on behalf of the Commissioner of Police. This Section is also responsible for the Transport Pool within the Government Fleet. 8.15 The Plant Operation Section operates and maintains major plants and is divided into six groups, namely, Incineration Plants and Abattoirs, major Air-Conditioning Plants and the Engineering Services. of Hospitals, Kai Tak Airport, Lion Rock Tunnel and the City Hall. The majority of the plants are required to provide a 24-hour year- round service. 8.16 The Military Works Section, headed by a serving Officer of the Royal Engineers seconded to this Sub-department, is responsible for the operation and minor maintenance of non-combat electrical and mechanical equipment in Royal Naval, Army and Royal Air Force installations, barracks and some 3,500 services married quarters in the Colony. This involves the operation of Cold Stores, Boilers, 97
2026-05-12 03:15:25 · Baseline
View content

repair operations including repair standards, manpower utilization and and machinery, work evaluation, utilization standardization of working procedures and maintenance of equipment records. It is intended that eventually the work of this Section will be extended to Plant Operation.

8.13 The Workshops Section has two main Workshops located at Caroline Hill, Hong Kong and Sung Wong Toi Road, Kowloon, and a Sub-Workshops at Fan Gardens in the New Territories. The Main Workshops are further divided into Mechanical, Electrical and Air- Conditioning Sub-Sections. Both main Workshops continue to be extremely short of space as commitments continue to grow at about 8% per annum compounded. The two Maintenance and Repair Depots included in the Public Works Programme with a view to easing conges- tion are nearing completion, whilst a workshop extension has been proposed for Caroline Hill. The Senior Engineer (Workshops) is also responsible for the Parking Meter Section.

8.14 The Vehicle Design and Procurement Section is responsible for the preparation of vehicle and mobile plant specifications including specialized plant and vehicles, the design of non-standard vehicle bodies, co-ordination of the Government's annual vehicle requirements, contracts for vehicle bodywork construction, bodywork repair and repainting, construction of refuse handcarts and bulk containers together with the supervision of such contracts. Certain very specialized design work is also being undertaken on behalf of the Commissioner of Police. This Section is also responsible for the Transport Pool within the Government Fleet.

8.15 The Plant Operation Section operates and maintains major plants and is divided into six groups, namely, Incineration Plants and Abattoirs, major Air-Conditioning Plants and the Engineering Services. of Hospitals, Kai Tak Airport, Lion Rock Tunnel and the City Hall. The majority of the plants are required to provide a 24-hour year- round service.

8.16 The Military Works Section, headed by a serving Officer of the Royal Engineers seconded to this Sub-department, is responsible for the operation and minor maintenance of non-combat electrical and mechanical equipment in Royal Naval, Army and Royal Air Force installations, barracks and some 3,500 services married quarters in the Colony. This involves the operation of Cold Stores, Boilers,

97