appliances and 3,038 parking meter casings and plates were also painted. Minor items included repairs to 542 refuse hand-carts and litter bins belonging to the U.S.D., the repair of 191 bicycles, 2,049 upholstery repairs and 11,388 jobs in the welding, blacksmiths and tinsmiths Shops.

Air-Conditioning and Refrigeration Sections

8.15. These Shops test and examine new refrigerators, room coolers, ventilation equipment, deep freezers, water coolers and other specialist equipment, in addition to their routine maintenance and complete overhaul. Not all room coolers are directly maintained by these Shops; some are maintained under contract. During the year, 2,094 new units were tested and 471 installed. 2,700 units were completely overhauled while preventive maintenance was carried out on 28,586 items and 3,722 fault calls attended to. 1,369 other miscellaneous tasks were also carried out.

Electrical Maintenance Sections

8.16. These Sections cover both workshop overhaul and site maintenance of electrical equipment which range through electric clocks, heaters and other domestic appliance, goods and passenger lifts, aerial masts, obstruction lights and beacons to large horse power motors and switchgear. A total of 38,166 fault calls were attended to during the year.

Electrical Installation Sections

8.17. The engineering of traffic lights and their control systems, together with other traffic aids is the responsibility of these Sections. Traffic lights were installed or modified at 43 road junctions during the year and there are now 198 road junctions equipped with traffic lights and 1,999 other electrical traffic aids are in operation. In addition to Traffic Light engineering, these Sections carried out the wiring of new, and the re-wiring of existing, electrical installations. Such work included the electrical distribution for the bitumen coating plant at the Mount Butler Quarry, conveyor emergency stop system, perimeter lighting and additions to the crushing plant lighting at Diamond Hill Quarry, perimeter lights for the C.E.O. Radio Network Repeater Station at Tate's Cairn, main supply, general power, lighting circuits and perimeter lighting for the 1969 Agricultural Show at Sek Kong, bus shelter lighting systems, navigation and jetty lights at Stonecutters Island and the electrical connections for emergency generators.

Page 91

Edit History

2026-05-12 01:48:20 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
appliances and 3,038 parking meter casings and plates were also painted. Minor items included repairs to 542 refuse hand-carts and litter bins belonging to the U.S.D., the repair of 191 bicycles, 2,049 upholstery repairs and 11,388 jobs in the welding, blacksmiths and tinsmiths Shops. Air-Conditioning and Refrigeration Sections 8.15. These Shops test and examine new refrigerators, room coolers, ventilation equipment, deep freezers, water coolers and other specialist equipment, in addition to their routine maintenance and complete overhaul. Not all room coolers are directly maintained by these Shops; some are maintained under contract. During the year, 2,094 new units were tested and 471 installed. 2,700 units were completely overhauled while preventive maintenance was carried out on 28,586 items and 3,722 fault calls attended to. 1,369 other miscellaneous tasks were also carried out. Electrical Maintenance Sections 8.16. These Sections cover both workshop overhaul and site maintenance of electrical equipment which range through electric clocks, heaters and other domestic appliance, goods and passenger lifts, aerial masts, obstruction lights and beacons to large horse power motors and switchgear. A total of 38,166 fault calls were attended to during the year. Electrical Installation Sections 8.17. The engineering of traffic lights and their control systems, together with other traffic aids is the responsibility of these Sections. Traffic lights were installed or modified at 43 road junctions during the year and there are now 198 road junctions equipped with traffic lights and 1,999 other electrical traffic aids are in operation. In addition to Traffic Light engineering, these Sections carried out the wiring of new, and the re-wiring of existing, electrical installations. Such work included the electrical distribution for the bitumen coating plant at the Mount Butler Quarry, conveyor emergency stop system, perimeter lighting and additions to the crushing plant lighting at Diamond Hill Quarry, perimeter lights for the C.E.O. Radio Network Repeater Station at Tate's Cairn, main supply, general power, lighting circuits and perimeter lighting for the 1969 Agricultural Show at Sek Kong, bus shelter lighting systems, navigation and jetty lights at Stonecutters Island and the electrical connections for emergency generators. Page 91
Baseline (Original)
appliances and 3,038 parking meter casings and plates were also painted. Minor items included repairs to 542 refuse hand-carts and litter bins belonging to the U.S.D., the repair of 191 bicycles, 2,049 upholstery repairs and 11,388 jobs in the welding, blacksmiths and tinsmiths Shops. Air-Conditioning and Refrigeration Sections 8.15. These Shops test and examine new refrigerators, room coolers, ventilation equipment, deep freezers, water coolers and other specialist equipment, in addition to their routine maintenance and complete overhaul. Not all room coolers are directly maintained by these Shops; some are maintained under contract. During the year, 2,094 new units were tested and 471 installed. 2,700 units were completely overhauled while preventive maintenance was carried out on 28,586 items and 3,722 fault calls attended to. 1,369 other miscellaneous tasks were also carried out. Electrical Maintenance Sections 8.16. These Sections cover both workshop overhaul and site main- tenance of electrical equipment which range through electric clocks, heaters and other domestic appliance, goods and passenger lifts, aerial masts, obstruction lights and beacons to large horse power motors and switchgear. A total of 38,166 fault calls were attended to during the year. Electrical Installation Sections 8.17. The engineering of traffic lights and their control systems, together with other traffic aids is the responsibility of these Sections. Traffic lights were installed or modified at 43 road junctions during the year and there are now 198 road junctions equipped with traffic lights and 1,999 other electrical traffic aids are in operation. In addition to Traffic Light engineering, these Sections carried out the wiring of new, and the re-wiring of existing, electrical installations. Such work included the electrical distribution for the bitumen coating plant at the Mount Butler Quarry, conveyor emergency stop system, perimeter lighting and additions to the crushing plant lighting at Diamond Hill Quarry, perimeter lights for the C.E.O. Radio Network Repeater Station at Tate's Cairn, main supply, general power, lighting circuits and perimeter lighting for the 1969 Agricultural Show at Sek Kong, bus shelter lighting systems, navigation and jetty lights at Stonecutters Island and the electrical connections for emergency generators. 91
2026-05-12 01:48:20 · Baseline
View content

appliances and 3,038 parking meter casings and plates were also painted. Minor items included repairs to 542 refuse hand-carts and litter bins belonging to the U.S.D., the repair of 191 bicycles, 2,049 upholstery repairs and 11,388 jobs in the welding, blacksmiths and tinsmiths Shops.

Air-Conditioning and Refrigeration Sections

8.15. These Shops test and examine new refrigerators, room coolers, ventilation equipment, deep freezers, water coolers and other specialist equipment, in addition to their routine maintenance and complete overhaul. Not all room coolers are directly maintained by these Shops; some are maintained under contract. During the year, 2,094 new units were tested and 471 installed. 2,700 units were completely overhauled while preventive maintenance was carried out on 28,586 items and 3,722 fault calls attended to. 1,369 other miscellaneous tasks were also carried out.

Electrical Maintenance Sections

8.16. These Sections cover both workshop overhaul and site main- tenance of electrical equipment which range through electric clocks, heaters and other domestic appliance, goods and passenger lifts, aerial masts, obstruction lights and beacons to large horse power motors and switchgear. A total of 38,166 fault calls were attended to during the year.

Electrical Installation Sections

8.17. The engineering of traffic lights and their control systems, together with other traffic aids is the responsibility of these Sections. Traffic lights were installed or modified at 43 road junctions during the year and there are now 198 road junctions equipped with traffic lights and 1,999 other electrical traffic aids are in operation. In addition to Traffic Light engineering, these Sections carried out the wiring of new, and the re-wiring of existing, electrical installations. Such work included the electrical distribution for the bitumen coating plant at the Mount Butler Quarry, conveyor emergency stop system, perimeter lighting and additions to the crushing plant lighting at Diamond Hill Quarry, perimeter lights for the C.E.O. Radio Network Repeater Station at Tate's Cairn, main supply, general power, lighting circuits and perimeter lighting for the 1969 Agricultural Show at Sek Kong, bus shelter lighting systems, navigation and jetty lights at Stonecutters Island and the electrical connections for emergency generators.