APPENDIX S
CIVIL ENGINEERING OFFICE
GENERAL STATISTICS
Hong Kong Kowloon
New Territories
Total
(A) Hong Kong Kowloon New Territories Total Length of Roadworks Carried Out (Miles) New roads completed 2.35 0.63 5.07 8.05 Existing roads reconstructed 1.29 3.36 1.50 6.15 Existing roads resurfaced 9.50 6.16 31.30 46.96 (B) Drainage Works Carried Out New drains laid (ft.) 40,741 15,400 17,212 73,353 Defective drains replaced (ft.) ** 11,296 4,756 16,243 Connections provided (no.) 344 416 224 984 Chokes cleared (no.) 8,740 7,749 1,030 17,519 Sand cleared from culverts (cu. yd.) 14,504 47,299 27,787 89,590 (C) Road Opening Permits Issued to Utilities and Service departments 2,534 2,934 533 6,001 Government departments 632 463 177 1,272 (D) Work Carried Out in New Resettlement and Low Cost Housing Estates Length of roads constructed (miles) 1.08 0.89 0.23 2.20 Length of drains laid (miles) 1.29 1.22 1.80 4.31 (E) Production in Government Quarries· Total Crushed Stone (Tons) 1964-65 67,979 33,579 146,837 1965-66 84,650 64,855 154,536 1966-67 86,291 78,858 137,260 1967-68 69,886 50,969 58,671 1968-69 25,092 47,816 112,671 Bitumen Coated Materials (Tons) 1964-65 65,708 29,633 95,341 1965-66 81,050 40,361 121,411 1966-67 86,845 29,947 116,792 1967-68 68,774 30,623 99,397 1968-69 67,633 32,624 100,257 (F) Materials Testing Laboratory Physical tests on soil and building materials carried out during the year totalled 60,390 Tests for compressive strength of concrete cubes... 38,652 Tests on physical properties of cement 1,184 Aggregate gradings and other tests 1,023 Tests on steel and other metals 12,449 Tests on bitumen and bituminous products 289 Soil tests 5,379 Pipe tests 581 Miscellaneous tests 833.143
APPENDIX S
CIVIL ENGINEERING OFFICE
GENERAL STATISTICS
Hong Kong Kowloon
New Territories
Total
(A)
Length of Roadworks Carried Out (Miles)
New roads completed
2.35
0.63
5.07
8.05
P
Existing roads reconstructed
Existing roads resurfaced
(B) Drainage Works Carried Out
New drains laid (ft.)
1.29
3.36
1.50
6.15
9.50
6.16
31.30
46.96
40,741
15,400
17,212
73,353
Defective drains replaced (ft.)
**
11,296
4,756
191
16,243
Connections provided (no.)
344
416
224
984
Chokes cleared (no.)
8,740
7,749
1,030
17,519
Sand cleared from culverts (cu. yd.)
14,504
47,299
27,787
89,590
(C) Road Opening Permits Issued to
Utilities and Service departments
2,534
2,934
533
6,001
Government departments
632
463
177
1,272
(D)
Work Carried Out in New Resettlement and Low Cost Housing Estates Length of roads constructed (miles) Length of drains laid (miles)
1.08
0.89
0.23
2.20
1.29
1.22
1.80
4.31
(E) Production in Government Quarries·
Total Crushed Stone (Tons)
1964-65 1965-66 1966-67
1967-68 · 1968-69
Mainland Island
67,979 84,650 86,291
33,579
64,855
78,858 69,886 50,969
25,092
47,816
Total
Mainland Island
:
146,837 154,536 137,260 58,671 112,671
Bitumen Coated Materials (Tons)
1964-65 · 1965-66 1966-67 1967-68 1968-69
65,708 81,050 86,845 68,774 67,633 29,633 40,361 29,947 30,623 32,624
Total
*
95,341 121,411 116,792 99,397 100,257
(F) Materials Testing Laboratory
Physical tests on soil and building materials carried out during the year totalled
60,390 and comprised the following:
Tests for compressive strength of concrete cubes... Tests on physical properties of cement
38,652
1,184
Aggregate gradings and other tests
1,023
Tests on steel and other metals
++
Tests on bitumen and bituminous products
Soil tests
Pipe tests
Miscellaneous tests
12,449
289
5,379
581
833
.143