# APPENDIX S
CIVIL ENGINEERING OFFICE
GENERAL STATISTICS
New Territories Hong Kong Kowloon Total (A) Length of Road Works Carried Out (Miles) New Roads Completed 1.39 1.40 *** 7.30 Existing Roads Reconstructed 5.80 5.29 8.22 8.22 Existing Roads Resurfaced 6.68 0.80 26.60 26.60 13.87 7.49 42.12 42.12 (B) Drainage Works Carried Out New Drains Laid (Feet) 38,603 39,757 43,826 124,795 Defective Drains Replaced (Feet) 48,324 4,029 922 40 Connections Provided (Nos.) 37,768 40 759 43,826 Chokes Clearance (Nos.) 124,795 203 203 1,884 Sand cleared from Culverts (cu. yd.) 8,931 7,531 899 17,361 13,797 62,592 6,486 82,875 *** *** (C) Road Opening Permits Issued to: Utilities and Service Departments 2,213 1,128 2,262 4,955 Government Departments 2,226 938 2,262 516 196 (D) Work carried out in New Resettlement and Low Cost Housing Estates Length of roads constructed (Miles) 0.30 0.33 3.33 4.90 Length of drains laid (Miles) 1.73 2.36 6.37 6.37 14.60 14.60 Mainland Island Total (E) Production in Government Quarries Total Crushed Stone (Tons) 1963-64 95,698 87,357 183,055 1964-65 67,979 78,858 146,837 1965-66 84,650 69,886 154,536 1966-67 86,291 50,969 137,260 1967-68 33,579 25,092 58,671 Bitumen Coated Materials (Tons) 1963-64 85,277 33,674 118,951 1964-65 65,708 29,633 95,341 1965-66 81,050 40,361 121,411 1966-67 86,845 29,947 116,792 1967-68 68,774 30,623 99,397(F) Materials Testing Laboratory
Physical tests on soil and building materials carried out during the year totalled 38,582 and comprised the following:
Tests for compressive strength of concrete cubes... 21,675
Tests on physical properties of cement 970
Aggregate gradings and other tests 1,022
Tests on steel and other metals 9,411
Tests on bitumen and bituminous products 470
Soil test 3,865
Pipe test * 4
Miscellaneous tests 528
* 641
136
APPENDIX S
CIVIL ENGINEERING OFFICE
GENERAL STATISTICS
New
Hong Kong Kowloon
Territories
Total
(A) Length of Road Works Carried Out (Miles)
New Roads Completed Existing Roads Reconstructed Existing Roads Resurfaced
(B) Drainage Works Carried Out New Drains Laid (Feet) Defective Drains Replaced (Feet) Connections Provided (Nos.) Chokes Clearance (Nos.)
Sand cleared from Culverts (cu. yd.)
1.39
5.80
6.68
13.87
1.40
5.29
0.80
7.49
***
7.30
8.22
26.60
42.12
4
38,603
48,324
37,768
124,795
39,757
4,029
40
43,826
922
759
203
1,884
8,931
7,531
899
17,361
13,797
62,592
6,486
82,875
***
(C) Road Opening Permits Issued to:
Utilities and Service Departments
Government Departments
2,213
2,226
516
4,955
1,128
938
196
2,262
(D) Work carried out in New Resettlement and Low Cost Housing Estates
Length of roads constructed (Miles) Length of drains laid (Miles)
(E) Production in Government Quarries
0.30
1.73
0.33
2.36
4.90
6.37
3.33
14.60
Mainland Island
Total
Mainland Island
Total
Total Crushed Stone (Tons)
•
1963-64 1964-65 1965-66 1966-67 1967-68
95,698 67,979 84,650 86,291 33,579 87,357 78,858 69,886 50,969 25,092
183,055 146,837 154,536 137,260 58,671
Bitumen Coated Materials (Tons)
1963-64 1964-65 1965-66 1966-67 1967-68 85,277 65,708 81,050 86,845 68,774 33,674 29,633 40,361 29,947 30,623
118,951 95,341 121,411 116,792
99,397
•
(F) Materials Testing Laboratory
Physical tests on soil and building materials carried out during the year totalled 38,582 and comprised the following:
Tests for compressive strength of concrete cubes... Tests on physical properties of cement
21,675
970
Aggregate gradings and other tests
1,022
Tests on steel and other metals
9,411
*
Tests on bitumen and bituminous products
470
Soil test
3,865
Pipe test
Miscellaneous tests
528
* 4
641
136
No comments yet.