Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir.
(para 8.67).
Page
Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir.
(para
8.67).
Page
No comments yet.
Private notes are available after approval.