1967-1968 — Page 114

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir.

(para 8.67).

Page

Edit History

2026-05-12 00:46:12 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir. (para 8.67). Page
Baseline (Original)
Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir. (para 8.67). Page
2026-05-12 00:46:12 · Baseline
View content

Jet disperser at Tai Po Tau. The water is collected bottom left and conveyed through a tunnel to Plover Cove Reservoir.

(para

8.67).

Page

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.