diversity, ranging from incinerator plant and quarry installations to traffic lights, emergency generators and submersible pumps. To cope with installation and maintenance responsibilities of such magnitude, as well as the design of new installations, the Division is divided into the following Sections:
New Projects Installation
Maintenance
Kai Tak Airport E. & M. Services (Maintenance and operation)
City Hall (Maintenance and operation)
New Projects Section
6.06. This Section is responsible for the design, preparation of specifications and working drawings and the construction, either by contract or direct labour, of electrical installations for major civil engineering projects. Design work was completed for the Lai Chi Kok incinerator plant, including a 2,500 K.W. turbo-alternator; new workshops for the Kowloon-Canton Railway at Sha Tin; covered slipways and piers at the Government Dockyard, Yau Ma Tei; and a washing shed, running shed and locomotive turntable for the Kowloon-Canton Railway at Hung Hom Reclamation. Orders were placed for a complete system of lighting for Lion Rock road tunnel and for the supply of toll collection, tunnel control, traffic counting and other specialized equipment required for the operation of the tunnel.
Installation Section
6.07. Using direct labour, this Section undertakes new installations and carries out the re-wiring or modernising of existing installations. Work was completed on the Kennedy Town Incinerator Plant and Kowloon East sewage screening plant and steady progress made on the piers at the Government Dockyard, ventilation houses at Lion Rock Tunnel, running and washing sheds for the Kowloon-Canton Railway at Hung Hom, quarry plant at the Diamond Hill and Mount Butler Quarries and Kai Tak Seawater Pumphouse.
6.08. Traffic signal installations and other traffic aids continued to form a large proportion of the work of this Section. Traffic signal control systems were installed and commissioned at 48 new locations, while 315 other illuminated traffic aids were installed or re-located.
68
Page 68
diversity, ranging from incinerator plant and quarry installations to traffic lights, emergency generators and submersible pumps. To cope with installation and maintenance responsibilities of such magnitude, as well as the design of new installations, the Division is divided into the following Sections:
New Projects Installation
Maintenance
Kai Tak Airport E. & M. Services (Maintenance and operation) City Hall (Maintenance and operation)
New Projects Section
6.06. This Section is responsible for the design, preparation of specifications and working drawings and the construction, either by contract or direct labour, of electrical installations for major civil engineering projects. Design work was completed for the Lai Chi Kok incinerator plant, including a 2,500 K.W. turbo-alternator; new work- shops for the Kowloon-Canton Railway at Sha Tin; covered slipways and piers at the Government Dockyard, Yau Ma Tei; and a washing shed, running shed and locomotive turntable for the Kowloon-Canton Railway at Hung Hom Reclamation. Orders were placed for a complete system of lighting for Lion Rock road tunnel and for the supply of toll collection, tunnel control, traffic counting and other specialized equip- ment required for the operation of the tunnel.
Installation Section
6.07. Using direct labour, this Section undertakes new installations and carries out the re-wiring or modernising of existing installations. Work was completed on the Kennedy Town Incinerator Plant and Kowloon East sewage screening plant and steady progress made on the piers at the Government Dockyard, ventilation houses at Lion Rock Tunnel, running and washing sheds for the Kowloon-Canton Railway at Hung Hom, quarry plant at the Diamond Hill and Mount Butler Quarries and Kai Tak Seawater Pumphouse.
6.08. Traffic signal installations and other traffic aids continued to form a large proportion of the work of this Section. Traffic signal control systems were installed and commissioned at 48 new locations, while 315 other illuminated traffic aids were installed or re-located.
68