APPENDIX N

CIVIL ENGINEERING OFFICE

GENERAL STATISTICS

Hong Kong Kowloon

New Territories

Total

(A) Length of Road Works Carried Out (Miles)

Hong Kong Kowloon New Territories Total New Roads Completed 2.50 6 6 14.50 Existing Roads Reconstructed 1 2.50 2 5.50 Existing Roads Resurfaced 6.50 9 18 33.50

(B) Drainage Works Carried Out

Hong Kong Kowloon New Territories Total New Drains Laid (Feet) 27,257 105,087 74,900 207,244 Defective Drains Replaced (Feet) ... 14,422 4,804 19,246 Connections Provided (Nos.) 998 1,890 254 3,142 Chokes Clearance (Nos.) 9,550 ... ... 8,386 680 18,616 Sand cleared from Culverts (cu. yd.) 17,000 169,000 25,000 211,000

(C) Road Opening Permits Issued

Hong Kong Kowloon New Territories Total Utilities, service departments 1,857 2,528 202 4,587 Government Sub-departments 1,657 645 98 2,400

(D) Work carried out in New Resettlement and L.C.H. Estates

Hong Kong Kowloon New Territories Total Length of roads constructed (Miles) .90 5.05 .80 6.75 Length of drains laid (Miles) 1.30 11.00 2.70 15.00

(E) Production in Government Quarries

Mainland Island Total Total Crushed Stone (Ton) 1962-63 ... 98,074 ... 1963-64 95,698 67,979 84,650 103,297 87,357 1964-65 78,858 69,886 ... 201,371 183,055 146,837 1965-66 154,536 Bitumen Coated Materials (Ton) 1962-63 70,186 ... 85,277 65,708 36,130 1963-64 81,050 33,674 ... ... 29,633 40,361 1964-65 ... ... 106,316 118,951 95,341 1965-66 121,411

(F) Materials Testing Laboratory

Physical tests on soil and building materials carried out during the year totalled 48,026 and comprised the following:

  1. Concrete tests
  2. Cement tests
  3. Metal tests
  4. Aggregate tests
  5. Bitumen and Bituminous materials tests
  6. Soil tests
  7. Miscellaneous tests
27,499 435 1,718 ... 13,091 297 3,510 1,476 +1 100

Edit History

2026-05-11 23:46:21 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
APPENDIX N CIVIL ENGINEERING OFFICE GENERAL STATISTICS Hong Kong Kowloon New Territories Total (A) Length of Road Works Carried Out (Miles) Hong Kong Kowloon New Territories Total New Roads Completed 2.50 6 6 14.50 Existing Roads Reconstructed 1 2.50 2 5.50 Existing Roads Resurfaced 6.50 9 18 33.50 (B) Drainage Works Carried Out Hong Kong Kowloon New Territories Total New Drains Laid (Feet) 27,257 105,087 74,900 207,244 Defective Drains Replaced (Feet) ... 14,422 4,804 19,246 Connections Provided (Nos.) 998 1,890 254 3,142 Chokes Clearance (Nos.) 9,550 ... ... 8,386 680 18,616 Sand cleared from Culverts (cu. yd.) 17,000 169,000 25,000 211,000 (C) Road Opening Permits Issued Hong Kong Kowloon New Territories Total Utilities, service departments 1,857 2,528 202 4,587 Government Sub-departments 1,657 645 98 2,400 (D) Work carried out in New Resettlement and L.C.H. Estates Hong Kong Kowloon New Territories Total Length of roads constructed (Miles) .90 5.05 .80 6.75 Length of drains laid (Miles) 1.30 11.00 2.70 15.00 (E) Production in Government Quarries Mainland Island Total Total Crushed Stone (Ton) 1962-63 ... 98,074 ... 1963-64 95,698 67,979 84,650 103,297 87,357 1964-65 78,858 69,886 ... 201,371 183,055 146,837 1965-66 154,536 Bitumen Coated Materials (Ton) 1962-63 70,186 ... 85,277 65,708 36,130 1963-64 81,050 33,674 ... ... 29,633 40,361 1964-65 ... ... 106,316 118,951 95,341 1965-66 121,411 (F) Materials Testing Laboratory Physical tests on soil and building materials carried out during the year totalled 48,026 and comprised the following: Concrete tests Cement tests Metal tests Aggregate tests Bitumen and Bituminous materials tests Soil tests Miscellaneous tests 27,499 435 1,718 ... 13,091 297 3,510 1,476 +1 100
Baseline (Original)
APPENDIX N CIVIL ENGINEERING OFFICE GENERAL STATISTICS Hong Kong Kowloon New Territories Total (A) Length of Road Works Carried Out (Miles) New Roads Completed Existing Roads Reconstructed Existing Roads Resurfaced (B) Drainage Works Carried Out New Drains Laid (Feet) ... Defective Drains Replaced (Feet) Connections Provided (Nos.) 2.50 6 6 14.50 1 2.50 2 5.50 6.50 9 18 33.50 27,257 105,087 74,900 207,244 ... 14,422 4,804 20 19,246 998 1,890 254 3,142 Chokes Clearance (Nos.) ... 9,550 ... ... 8,386 680 18,616 Sand cleared from Culverts (cu. yd.) 17,000 169,000 25,000 211,000 (C) Road Opening Permits Issued Utilities, service departments 1,857 2,528 202 4,587 Government Sub-departments 1,657 645 98 2,400 (D) Work carried out in New Resettlement and L.C.H. Estates Length of roads constructed (Miles) .90 5.05 .80 6.75 Length of drains laid (Miles) 1.30 11.00 2.70 15.00 (E) Production in Government Quarries Total Crushed Stone (Ton) 1962-63 1963-64 1964-65 1965-66 Mainland Island Total ... ... 98,074 95,698 67,979 84,650 103,297 87,357 78,858 69,886 201,371 183,055 146,837 154,536 Bitumen Coated Materials (Ton) 1962-63 1963-64 1964-65 1965-66 70,186 85,277 65,708 81,050 ... 36,130 33,674 29,633 40,361 ... ... 106,316 118,951 95,341 121,411 Mainland Island ... Total (F) Materials Testing Laboratory Physical tests on soil and building materials carried out during the year totalled 48,026 and comprised the following: 1. Concrete tests ... ... 2. Cement tests ... ... 3. 4. Metal tests 5. Aggregate tests ... Bitumen and Bituminous materials tests 6. Soil tests... +1 7. Miscellaneous tests 100 27,499 435 1,718 ... 13,091 297 3,510 1,476
2026-05-11 23:46:21 · Baseline
View content

APPENDIX N

CIVIL ENGINEERING OFFICE

GENERAL STATISTICS

Hong Kong Kowloon

New Territories

Total

(A) Length of Road Works Carried Out (Miles)

New Roads Completed Existing Roads Reconstructed Existing Roads Resurfaced

(B) Drainage Works Carried Out

New Drains Laid (Feet)

...

Defective Drains Replaced (Feet) Connections Provided (Nos.)

2.50

6

6

14.50

1

2.50

2

5.50

6.50

9

18

33.50

27,257

105,087

74,900

207,244

...

14,422

4,804

20

19,246

998

1,890

254

3,142

Chokes Clearance (Nos.) ...

9,550

...

...

8,386

680 18,616

Sand cleared from Culverts (cu. yd.)

17,000 169,000

25,000

211,000

(C) Road Opening Permits Issued

Utilities, service departments

1,857 2,528

202

4,587

Government Sub-departments

1,657

645

98

2,400

(D) Work carried out in New Resettlement and L.C.H. Estates

Length of roads constructed (Miles)

.90

5.05

.80

6.75

Length of drains laid (Miles)

1.30

11.00

2.70

15.00

(E) Production in Government Quarries

Total Crushed Stone (Ton)

1962-63

1963-64

1964-65

1965-66

Mainland Island

Total

...

...

98,074

95,698

67,979

84,650

103,297

87,357

78,858

69,886

201,371

183,055

146,837

154,536

Bitumen Coated Materials (Ton)

1962-63

1963-64

1964-65

1965-66

70,186

85,277

65,708

81,050

...

36,130

33,674

29,633

40,361

...

...

106,316

118,951

95,341

121,411

Mainland Island

...

Total

(F) Materials Testing Laboratory

Physical tests on soil and building materials carried out during the year totalled 48,026 and comprised the following:

1.

Concrete tests

...

...

2.

Cement tests

...

...

3.

4.

Metal tests

5.

Aggregate tests ...

Bitumen and Bituminous materials tests

6.

Soil tests...

+1

7.

Miscellaneous tests

100

27,499

435

1,718

...

13,091

297 3,510 1,476