board at Substation 'D' to afford a 200-KW 3-phase 4-wire supply to the Freight Building extension being built by the Architectural Office was also provided. Finally a modification of the Apron Area floodlights by fitting 1,500-watt Quartz Iodine lamps to improve the illumination at the outer-stand area was also satisfactorily carried out.

Sewage Plant

6.34. The electrical lighting and power systems were completed at Kowloon South Sewage Screening Plant (Tsim Sha Tsui) and Kai Tak Sewage Pumping Stations No. 1 and No. 2. The power installation includes the connection and commissioning of 13 motors having a total of 230 H.P. and associated switchgear and starter equipment.

City Hall

6.35. This Section again provided maintenance and operation services of the electrical installations at the City Hall including providing staff to operate stage lighting equipment and cinema projection in the Theatre and Concert Hall. Close co-operation was maintained with the City Hall Manager and his staff. At the end of the financial year, apart from the general routine maintenance and overhaul duties, the staff completed 958 stage lighting operations for stage shows and rehearsals and 507 cinema and slide projections.

6.36. Other works of considerable diversity completed included security lighting installations, motorized machine tools at various government schools, typhoon signals, printing machines for the Printing Department, subway lighting and navigation beacons.

(B) Mechanical Section

6.37. The work of the Mechanical Section continued on very much the same lines as in previous years and the increased commitments occasioned by the usual annual increases in motor vehicles, plant and mechanical equipment were successfully absorbed. A summary of the various categories of equipment under E. & M. maintenance is given in Appendix L and the total number of jobs handled by the mechanical workshops during the year was 72,151, which is an increase of 7.3% over the previous year.

Vehicles

6.38. The number of motor vehicles in Government service increased by 7% during the year to a total of 1,998 at 31st March, 1965. The serv-

68

Page

Edit History

2026-05-11 23:18:19 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
board at Substation 'D' to afford a 200-KW 3-phase 4-wire supply to the Freight Building extension being built by the Architectural Office was also provided. Finally a modification of the Apron Area floodlights by fitting 1,500-watt Quartz Iodine lamps to improve the illumination at the outer-stand area was also satisfactorily carried out. Sewage Plant 6.34. The electrical lighting and power systems were completed at Kowloon South Sewage Screening Plant (Tsim Sha Tsui) and Kai Tak Sewage Pumping Stations No. 1 and No. 2. The power installation includes the connection and commissioning of 13 motors having a total of 230 H.P. and associated switchgear and starter equipment. City Hall 6.35. This Section again provided maintenance and operation services of the electrical installations at the City Hall including providing staff to operate stage lighting equipment and cinema projection in the Theatre and Concert Hall. Close co-operation was maintained with the City Hall Manager and his staff. At the end of the financial year, apart from the general routine maintenance and overhaul duties, the staff completed 958 stage lighting operations for stage shows and rehearsals and 507 cinema and slide projections. 6.36. Other works of considerable diversity completed included security lighting installations, motorized machine tools at various government schools, typhoon signals, printing machines for the Printing Department, subway lighting and navigation beacons. (B) Mechanical Section 6.37. The work of the Mechanical Section continued on very much the same lines as in previous years and the increased commitments occasioned by the usual annual increases in motor vehicles, plant and mechanical equipment were successfully absorbed. A summary of the various categories of equipment under E. & M. maintenance is given in Appendix L and the total number of jobs handled by the mechanical workshops during the year was 72,151, which is an increase of 7.3% over the previous year. Vehicles 6.38. The number of motor vehicles in Government service increased by 7% during the year to a total of 1,998 at 31st March, 1965. The serv- 68 Page
Baseline (Original)
board at Substation 'D' to afford a 200-KW 3-phase 4-wire supply to the Freight Building extension being built by the Architectural Office was also provided. Finally a modification of the Apron Area floodlights by fitting 1,500-watt Quartz Iodine lamps to improve the illumination at the outer-stand area was also satisfactorily carried out. Sewage Plant 6.34. The electrical lighting and power systems were completed at Kowloon South Sewage Screening Plant (Tsim Sha Tsui) and Kai Tak Sewage Pumping Stations No. 1 and No. 2. The power installation includes the connection and commissioning of 13 motors having a total of 230 H.P. and associated switchgear and starter equipment. City Hall 6.35. This Section again provided maintenance and operation services of the electrical installations at the City Hall including providing staff to operate stage lighting equipment and cinema projection in the Theatre and Concert Hall. Close co-operation was maintained with the City Hall Manager and his staff. At the end of the financial year, apart from the general routine maintenance and overhaul duties, the staff completed 958 stage lighting operations for stage shows and rehearsals and 507 cinema and slide projections. 6.36. Other works of considerable diversity completed included security lighting installations, motorized machine tools at various govern- ment schools, typhoon signals, printing machines for the Printing Depart- ment, subway lighting and navigation beacons. (B) Mechanical Section 6.37. The work of the Mechanical Section continued on very much the same lines as in previous years and the increased commitments occasioned by the usual annual increases in motor vehicles, plant and mechanical equipment were successfully absorbed. A summary of the various categories of equipment under E. & M. maintenance is given in Appendix L and the total number of jobs handled by the mechanical workshops during the year was 72,151, which is an increase of 73% over the previous year. Vehicles. 6.38. The number of motor vehicles in Government service increased by 7% during the year to a total of 1,998 at 31st March, 1965. The serv- 68 Page
2026-05-11 23:18:19 · Baseline
View content

board at Substation 'D' to afford a 200-KW 3-phase 4-wire supply to the Freight Building extension being built by the Architectural Office was also provided. Finally a modification of the Apron Area floodlights by fitting 1,500-watt Quartz Iodine lamps to improve the illumination at the outer-stand area was also satisfactorily carried out.

Sewage Plant

6.34. The electrical lighting and power systems were completed at Kowloon South Sewage Screening Plant (Tsim Sha Tsui) and Kai Tak Sewage Pumping Stations No. 1 and No. 2. The power installation includes the connection and commissioning of 13 motors having a total of 230 H.P. and associated switchgear and starter equipment.

City Hall

6.35. This Section again provided maintenance and operation services of the electrical installations at the City Hall including providing staff to operate stage lighting equipment and cinema projection in the Theatre and Concert Hall. Close co-operation was maintained with the City Hall Manager and his staff. At the end of the financial year, apart from the general routine maintenance and overhaul duties, the staff completed 958 stage lighting operations for stage shows and rehearsals and 507 cinema and slide projections.

6.36. Other works of considerable diversity completed included security lighting installations, motorized machine tools at various govern- ment schools, typhoon signals, printing machines for the Printing Depart- ment, subway lighting and navigation beacons.

(B) Mechanical Section

6.37. The work of the Mechanical Section continued on very much the same lines as in previous years and the increased commitments occasioned by the usual annual increases in motor vehicles, plant and mechanical equipment were successfully absorbed. A summary of the various categories of equipment under E. & M. maintenance is given in Appendix L and the total number of jobs handled by the mechanical workshops during the year was 72,151, which is an increase of 73% over the previous year.

Vehicles.

6.38. The number of motor vehicles in Government service increased by 7% during the year to a total of 1,998 at 31st March, 1965. The serv-

68

Page