1962-1963 — Page 61

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Cheung Sha Wan Reclamation

8.05. The construction of a new sand depot was nearing completion. This will replace the existing one at Hung Hom which will soon be surrounded by the new reclamation work and hence cut off from access by sea.

8.06. Several plans for the construction of boat building and repairing yards on the new reclamation were examined.

Reclamation off Jordan Road

8.07. The seawall and reclamation including a pumphouse commenced in 1961, were nearly completed. This work will eventually allow for an increase in area for the Jordan Road ferry services concourse. As an interim measure it has been decided to construct another temporary vehicular ferry landing point on the new reclamation. This will allow a total of three vehicular ferries to operate from Jordan Road.

To Kwa Wan Reclamation

8.08. A start was made in September on the construction of 1,440 feet of seawall and 330 feet of pitched slope to reclaim approximately 17 acres of land. To Kwa Wan Island was included within the area.

Ma Tau Kok Reclamation

8.09. To provide an area for a sewage screening plant, a short length of seawall was constructed near to the outfall of the Sung Wong Toi Road culvert.

Silver Mine Bay Reclamation

8.10. Work on stage II of the scheme was commenced to the north of the previously completed stage I, comprising half an acre of reclamation and 500 feet of seawall with various landing facilities. Dredging for the seawall foundation was completed and dumping of rubble and casting concrete blocks was in hand.

Chai Wan Reclamation

8.11. A total of 875,000 cubic yards of spoil was dumped at the Chai Wan Reclamation during the year, forming 24.4 acres of the total future area planned of 171.1 acres.

Aberdeen

8.12. Work commenced in July on the western breakwater and seawall at Aberdeen, being the initial part of the Aberdeen development

43

Edit History

2026-05-11 22:25:07 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Cheung Sha Wan Reclamation 8.05. The construction of a new sand depot was nearing completion. This will replace the existing one at Hung Hom which will soon be surrounded by the new reclamation work and hence cut off from access by sea. 8.06. Several plans for the construction of boat building and repairing yards on the new reclamation were examined. Reclamation off Jordan Road 8.07. The seawall and reclamation including a pumphouse commenced in 1961, were nearly completed. This work will eventually allow for an increase in area for the Jordan Road ferry services concourse. As an interim measure it has been decided to construct another temporary vehicular ferry landing point on the new reclamation. This will allow a total of three vehicular ferries to operate from Jordan Road. To Kwa Wan Reclamation 8.08. A start was made in September on the construction of 1,440 feet of seawall and 330 feet of pitched slope to reclaim approximately 17 acres of land. To Kwa Wan Island was included within the area. Ma Tau Kok Reclamation 8.09. To provide an area for a sewage screening plant, a short length of seawall was constructed near to the outfall of the Sung Wong Toi Road culvert. Silver Mine Bay Reclamation 8.10. Work on stage II of the scheme was commenced to the north of the previously completed stage I, comprising half an acre of reclamation and 500 feet of seawall with various landing facilities. Dredging for the seawall foundation was completed and dumping of rubble and casting concrete blocks was in hand. Chai Wan Reclamation 8.11. A total of 875,000 cubic yards of spoil was dumped at the Chai Wan Reclamation during the year, forming 24.4 acres of the total future area planned of 171.1 acres. Aberdeen 8.12. Work commenced in July on the western breakwater and seawall at Aberdeen, being the initial part of the Aberdeen development 43
Baseline (Original)
Cheung Sha Wan Reclamation 8.05. The construction of a new sand depot was nearing completion. This will replace the existing one at Hung Hom which will soon be surrounded by the new reclamation work and hence cut off from access by sea. 8.06. Several plans for the construction of boat building and repairing yards on the new reclamation were examined. Reclamation off Jordan Road 8.07. The seawall and reclamation including a pumphouse com- menced in 1961, were nearly completed. This work will eventually allow for an increase in area for the Jordan Road ferry services con- course. As an interim measure it has been decided to construct another temporary vehicular ferry landing point on the new reclamation. This will allow a total of three vehicular ferries to operate from Jordan Road. To Kwa Wan Reclamation 8.08. A start was made in September on the construction of 1,440 feet of seawall and 330 feet of pitched slope to reclaim approximately 17 acres of land. To Kwa Wan Island was included within the area. Ma Tau Kok Reclamation 8.09. To provide an area for a sewage screening plant, a short length of seawall was constructed near to the outfall of the Sung Wong Toi Road culvert. Silver Mine Bay Reclamation 8.10. Work on stage II of the scheme was commenced to the north of the previously completed stage I, comprising half an acre of reclama- tion and 500 feet of seawall with various landing facilities. Dredging for the seawall foundation was completed and dumping of rubble and casting concrete blocks was in hand. Chai Wan Reclamation 8.11. A total of 875,000 cubic yards of spoil was dumped at the Chai Wan Reclamation during the year, forming 24.4 acres of the total future area planned of 171.1 acres. Aberdeen 8.12. Work commenced in July on the western breakwater and seawall at Aberdeen, being the initial part of the Aberdeen development 43
2026-05-11 22:25:07 · Baseline
View content

Cheung Sha Wan Reclamation

8.05. The construction of a new sand depot was nearing completion. This will replace the existing one at Hung Hom which will soon be surrounded by the new reclamation work and hence cut off from access by sea.

8.06. Several plans for the construction of boat building and repairing yards on the new reclamation were examined.

Reclamation off Jordan Road

8.07. The seawall and reclamation including a pumphouse com- menced in 1961, were nearly completed. This work will eventually allow for an increase in area for the Jordan Road ferry services con- course. As an interim measure it has been decided to construct another temporary vehicular ferry landing point on the new reclamation. This will allow a total of three vehicular ferries to operate from Jordan Road.

To Kwa Wan Reclamation

8.08. A start was made in September on the construction of 1,440 feet of seawall and 330 feet of pitched slope to reclaim approximately 17 acres of land. To Kwa Wan Island was included within the area.

Ma Tau Kok Reclamation

8.09. To provide an area for a sewage screening plant, a short length of seawall was constructed near to the outfall of the Sung Wong Toi Road culvert.

Silver Mine Bay Reclamation

8.10. Work on stage II of the scheme was commenced to the north of the previously completed stage I, comprising half an acre of reclama- tion and 500 feet of seawall with various landing facilities. Dredging for the seawall foundation was completed and dumping of rubble and casting concrete blocks was in hand.

Chai Wan Reclamation

8.11. A total of 875,000 cubic yards of spoil was dumped at the Chai Wan Reclamation during the year, forming 24.4 acres of the total future area planned of 171.1 acres.

Aberdeen

8.12. Work commenced in July on the western breakwater and seawall at Aberdeen, being the initial part of the Aberdeen development