specification and further supervision of their installation. In addition to the completion of three such installations, work advanced on three others with a capacity of 879 tons, the largest units being in the Causeway Bay Magistracy (506 tons capacity) and in the North Kowloon Magistracy (308 tons capacity). Projects in the design stage included six items with a total capacity of 562 tons of refrigeration.
218. The quantity of new air-conditioning and refrigerating plant and equipment in use during the year, with comparative figures for the last three years, is as follows:
1958-59 1959-60 1960-61 Air-Conditioning Plants 61 totalling 1,100 tons of refrigeration 69 totalling 1,515 tons of refrigeration 82 totalling 2,597 tons of refrigeration Room Air Coolers 301 467 652 Refrigerators 1,714 1,883 2,230 Cold Stores & Mortuaries 12 16 21Eight major plants are under the control of a full-time operating staff who carried out all maintenance and repair work. All other plant and equipment is maintained and repaired by staff from the Workshops who paid 11,949 maintenance visits and answered 1,365 fault calls during the year.
219. In addition to 640 minor repairs and overhauls and 14 major ones, 15 minor air-conditioning units and 347 new refrigerators were installed. The transfer of the Air-Conditioning and Refrigeration Workshops into temporary accommodation in the old Naval Dockyard buildings from the old over-crowded Johnston Road site helped considerably, but the lack of a sub-workshop and a repair depot in Kowloon necessitated the transportation across the harbour for repair of all refrigerators and plant used in Kowloon.
ELECTRICAL SECTION
220. The Electrical Section carried out 29,484 orders compared with 18,442 in the previous year; the number of items of electrical plant, equipment and appliances maintained rose by 25 per cent to 37,506.
221. New items of equipment installed included 4 sets of fluoridation equipment at water filtration stations and the internal lighting and perimeter lights at four pumping stations. A considerable amount of additional work in connexion with the Airport lighting system included the installation of 8 Strobe beacons at the Lei Yue Mun Barracks, Cape Collinson and Green Island. Two 900 H.P. 6.6 K.V. pump motors,
specification and further supervision of their installation. In addition to the completion of three such installations, work advanced on three others with a capacity of 879 tons, the largest units being in the Cause- way Bay Magistracy (506 tons capacity) and in the North Kowloon Magistracy (308 tons capacity). Projects in the design stage included six items with a total capacity of 562 tons of refrigeration.
218. The quantity of new air-conditioning and refrigerating plant and equipment in use during the year, with comparative figures for the last three years, is as follows:
Air-Conditioning Plants
1958-59 61 totalling 1,100 tons of refrigeration
1959-60 69 totalling 1,515 tons of refrigeration
1960-61 82 totalling 2,597 tons of refrigeration
▸
Room Air Coolers
Refrigerators
Cold Stores & Mortuaries
301
1,714
12
467
1,883
16
652
2,230 ·
21
Eight major plants are under the control of a full time operating staff who carried out all maintenance and repair work. All other plant and equipment is maintained and repaired by staff from thte Workshops who paid 11,949 maintenance visits and answered 1,365 fault calls during the year.
219. In addition to 640 minor repairs and overhauls and 14 major ones, 15 minor air-conditioning units and 347 new refrigerators were installed. The transfer of the Air-Conditioning and Refrigeration Work- shops into temporary accommodation in the old Naval Dockyard buildings from the old over-crowded Johnston Road site helped con- siderably, but the lack of a sub-workshop and a repair depot in Kowloon necessitated the transportation across the harbour for repair of all re- frigerators and plant used in Kowloon.
ELECTRICAL SECTION
220. The Electrical Section carried out 29,484 orders compared with 18,442 in the previous year; the number of items of electrical plant, equipment and appliances maintained rose by 25 per cent to 37,506.
221. New items of equipment installed included 4 sets of fluorida- tion equipment at water filtration stations and the internal lighting and perimeter lights at four pumping stations. A considerable amount of additional work in connexion with the Airport lighting system included the installation of 8 Strobe beacons at the Lei Yue Mun Barracks, Cape Collinson and Green Island. Two 900 H.P. 6.6 K.V. pump motors,
45