to the So Uk Housing Estate and the Li Cheng Uk, Shek Kip Mei and Tai Hang Tung Resettlement Estates. Excavation for the 2-million gallon service reservoir at Piper's Hill and the 3-million gallon service reservoir at Tai Wo Ping began, and 2,000 feet of 12-inch diameter supply main was laid.

(2) Wong Tai Sin

A pumping station inside Kai Tak Airport will supply two service reservoirs at Lo Fu Ngam and Wong Tai Sin, which will in turn distribute the flushing water to the resettlement estates in these areas. The piling of the pump house went to tender, excavation work began on the 2-million gallon service reservoir at Lo Fu Ngam, tenders were called for the 5-million gallon service reservoir at Wong Tai Sin and 1,000 feet of 18-inch diameter delivery pipes were laid.

(3) Jordan Valley

Work began on a 90-foot high concrete gravity dam in the Jordan Valley to impound 54 million gallons of water to supply the Jordan Valley Resettlement Estate with flushing water. In the rainy season supplies will come from the stream courses to be supplemented in the dry season by sea water pumped from a pump house at Ngau Tau Kok.

(4) Kwun Tong

Similar arrangements will be made for the supply of flushing water for the Kwun Tong Resettlement Estate, and the construction of the dam went to contract. 2,500 feet of 18-inch diameter pipeline, part of the delivery main from the pump house site to the dam, was laid.

(5) North Point

Two service reservoirs will supply the flushing needs of the existing development in the North Point area and future high level development off Tin Hau Temple Road. The formation of an access road enabled a contract to be let for the construction of the high level 2-million gallon service reservoir.

(6) Chai Wan

A scheme was started at Chai Wan to serve the resettlement estate and adjoining areas. Site formation for a 1-million gallon service reservoir was completed and pumping plant has been ordered. Half of the rising main from the pump house sited on Chai Wan Reclamation has been laid.

56

Edit History

2026-05-11 20:46:43 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
to the So Uk Housing Estate and the Li Cheng Uk, Shek Kip Mei and Tai Hang Tung Resettlement Estates. Excavation for the 2-million gallon service reservoir at Piper's Hill and the 3-million gallon service reservoir at Tai Wo Ping began, and 2,000 feet of 12-inch diameter supply main was laid. (2) Wong Tai Sin A pumping station inside Kai Tak Airport will supply two service reservoirs at Lo Fu Ngam and Wong Tai Sin, which will in turn distribute the flushing water to the resettlement estates in these areas. The piling of the pump house went to tender, excavation work began on the 2-million gallon service reservoir at Lo Fu Ngam, tenders were called for the 5-million gallon service reservoir at Wong Tai Sin and 1,000 feet of 18-inch diameter delivery pipes were laid. (3) Jordan Valley Work began on a 90-foot high concrete gravity dam in the Jordan Valley to impound 54 million gallons of water to supply the Jordan Valley Resettlement Estate with flushing water. In the rainy season supplies will come from the stream courses to be supplemented in the dry season by sea water pumped from a pump house at Ngau Tau Kok. (4) Kwun Tong Similar arrangements will be made for the supply of flushing water for the Kwun Tong Resettlement Estate, and the construction of the dam went to contract. 2,500 feet of 18-inch diameter pipeline, part of the delivery main from the pump house site to the dam, was laid. (5) North Point Two service reservoirs will supply the flushing needs of the existing development in the North Point area and future high level development off Tin Hau Temple Road. The formation of an access road enabled a contract to be let for the construction of the high level 2-million gallon service reservoir. (6) Chai Wan A scheme was started at Chai Wan to serve the resettlement estate and adjoining areas. Site formation for a 1-million gallon service reservoir was completed and pumping plant has been ordered. Half of the rising main from the pump house sited on Chai Wan Reclamation has been laid. 56
Baseline (Original)
to the So Uk Housing Estate and the Li Cheng Uk, Shek Kip Mei and Tai Hang Tung Resettlement Estates. Excavation for the 2-million gallon service reservoir at Piper's Hill and the 3-million gallon service reservoir at Tai Wo Ping began, and 2,000 feet of 12-inch diameter supply main was laid. (2) Wong Tai Sin A pumping station inside Kai Tak Airport will supply two service reservoirs at Lo Fu Ngam and Wong Tai Sin, which will in turn distribute the flushing water to the resettlement estates in these areas. The piling of the pump house went to tender, excavation work began on the 2-million gallon service reservoir at Lo Fu Ngam, tenders were called for the 5-million gallon service reservoir at Wong Tai Sin and 1,000 feet of 18-inch diameter delivery pipes were laid. (3) Jordan Valley Work began on a 90-foot high concrete gravity dam in the Jordan Valley to impound 54 million gallons of water to supply the Jordan Valley Resettlement Estate with flushing water. In the rainy season supplies will come from the stream courses to be supplemented in the dry season by sea water pumped from a pump house at Ngau Tau Kok. (4) Kwun Tong Similar arrangements will be made for the supply of flushing water for the Kwun Tong Resettlement Estate, and the construc- tion of the dam went to contract. 2,500 feet of 18-inch diameter pipeline, part of the delivery main from the pump house site to the dam, was laid. (5) North Point Two service reservoirs will supply the flushing needs of the existing development in the North Point area and future high level development off Tin Hau Temple Road. The formation of an access road enabled a contract to be let for the construction of the high level 2-million gallon service reservoir. (6) Chai Wan A scheme was started at Chai Wan to serve the resettlement estate and adjoining areas. Site formation for a 1-million gallon service reservoir was completed and pumping plant has been ordered. Half of the rising main from the pump house sited on Chai Wan Reclamation has been laid. 56
2026-05-11 20:46:43 · Baseline
View content

to the So Uk Housing Estate and the Li Cheng Uk, Shek Kip Mei and Tai Hang Tung Resettlement Estates. Excavation for the 2-million gallon service reservoir at Piper's Hill and the 3-million gallon service reservoir at Tai Wo Ping began, and 2,000 feet of 12-inch diameter supply main was laid.

(2) Wong Tai Sin

A pumping station inside Kai Tak Airport will supply two service reservoirs at Lo Fu Ngam and Wong Tai Sin, which will in turn distribute the flushing water to the resettlement estates in these areas. The piling of the pump house went to tender, excavation work began on the 2-million gallon service reservoir at Lo Fu Ngam, tenders were called for the 5-million gallon service reservoir at Wong Tai Sin and 1,000 feet of 18-inch diameter delivery pipes were laid.

(3) Jordan Valley

Work began on a 90-foot high concrete gravity dam in the Jordan Valley to impound 54 million gallons of water to supply the Jordan Valley Resettlement Estate with flushing water. In the rainy season supplies will come from the stream courses to be supplemented in the dry season by sea water pumped from a pump house at Ngau Tau Kok.

(4) Kwun Tong

Similar arrangements will be made for the supply of flushing water for the Kwun Tong Resettlement Estate, and the construc- tion of the dam went to contract. 2,500 feet of 18-inch diameter pipeline, part of the delivery main from the pump house site to the dam, was laid.

(5) North Point

Two service reservoirs will supply the flushing needs of the existing development in the North Point area and future high level development off Tin Hau Temple Road. The formation of an access road enabled a contract to be let for the construction of the high level 2-million gallon service reservoir.

(6) Chai Wan

A scheme was started at Chai Wan to serve the resettlement estate and adjoining areas. Site formation for a 1-million gallon service reservoir was completed and pumping plant has been ordered. Half of the rising main from the pump house sited on Chai Wan Reclamation has been laid.