## FIRE BRIGADE BUILDINGS
### Fire Stations at Ma Tau Chung, Yuen Long and Tsuen Wan
57. Construction of these three standard fire stations was completed. Each provides three bays for appliances and a fourth for watchroom, offices and stores, with barrack accommodation on the first floor for 36 firemen and 6 ambulance workers and married quarters for three officers on the second floor. A hose tower and workshop is included in the station yard.
### Fire Stations at Cheung Chau, San Hui and Peng Chau
58. The first two of these smaller stations for outlying districts were under construction, while working drawings are in preparation for the third, which includes in the same building a small post office and scavenging store. These small fire stations include an appliance room, watchroom and quarters.
59. Sketch plans for additional quarters at Sheung Shui Fire Station in the New Territories have been prepared.
## POST OFFICE BUILDINGS
### Sheung Shui Post Office
60. Piling was completed and construction started on this post office which provides a public hall, sorting room, post office boxes and offices, etc. on the ground floor with a three-roomed flat and some barrack accommodation above.
61. Drawings are in progress for the provision of post office facilities in rented accommodation at Mong Kok and Kowloon City.
## RESETTLEMENT BUILDINGS
### Shek Kip Mei III
62. The last three blocks of the contract were completed in June.
### Shek Kip Mei IV
63. Site formation and piling work started for a further two blocks and a hawker market.
### Lo Fu Ngam (Stage 1)
64. The last two blocks of this contract approached completion. The scheme had been delayed by the amount of rock encountered in site formation and foundation work.
Page 12
FIRE BRIGADE BUILDINGS
Fire Stations at Ma Tau Chung, Yuen Long and Tsuen Wan
57. Construction of these three standard fire stations was completed. Each provides three bays for appliances and a fourth for watchroom, offices and stores, with barrack accommodation on the first floor for 36 firemen and 6 ambulance workers and married quarters for three officers on the second floor. A hose tower and workshop is included in the station yard.
Fire Stations at Cheung Chau, San Hui and Peng Chau
58. The first two of these smaller stations for outlying districts were under construction, while working drawings are in preparation for the third, which includes in the same building a small post office and scavenging store. These small fire stations include an appliance room, watchroom and quarters.
59. Sketch plans for additional quarters at Sheung Shui Fire Station in the New Territories have been prepared.
Sheung Shui Post Office
POST OFFICE BUILDINGS
60. Piling was completed and construction started on this post office which provides a public hall, sorting room, post office boxes and offices, etc. on the ground floor with a three-roomed flat and some barrack accommodation above.
61. Drawings are in progress for the provision of post office facilities in rented accommodation at Mong Kok and Kowloon City.
Shek Kip Mei III
RESETTLEMENT BUILDINGS
62. The last three blocks of the contract were completed in June.
Shek Kip Mei IV
63. Site formation and piling work started for a further two blocks and a hawker market.
Lo Fu Ngam (Stage 1)
64. The last two blocks of this contract approached completion. The scheme had been delayed by the amount of rock encountered in site formation and foundation work.
12