306. In regard to the work previously approved satisfactory progress was made on the following:

(a) The construction of Waterfall dam.

(b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan.

(c) The erection of a building to house a 20 million gallons per day filtration plant.

(d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok.

(e) The construction of a 12-million gallon service reservoir at Kau Wa Kang.

(f) The construction of a 5-million gallon service reservoir at Ma Tau Wei.

(g) The construction of a 5-million gallon service reservoir at Diamond Hill.

(h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes.

307. Additional separate contracts were let and satisfactory progress made on the following:

(a) The construction of low gap dams Nos. 2 and 3.

(b) The construction of the catchwater tunnel and settling basin.

(c) The laying of one of the 36 inch rising mains to the filters.

(d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill.

(e) The construction of a pumping station at Tsun Wan.

(f) The construction of a pumping station and balance tank at Kau Wa Kang.

Page 65
age 77

should be rewritten to

Page 65

306. In regard to the work previously approved satisfactory progress was made on the following:

(a) The construction of Waterfall dam.

(b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan.

(c) The erection of a building to house a 20 million gallons per day filtration plant.

(d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok.

(e) The construction of a 12-million gallon service reservoir at Kau Wa Kang.

(f) The construction of a 5-million gallon service reservoir at Ma Tau Wei.

(g) The construction of a 5-million gallon service reservoir at Diamond Hill.

(h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes.

307. Additional separate contracts were let and satisfactory progress made on the following:

(a) The construction of low gap dams Nos. 2 and 3.

(b) The construction of the catchwater tunnel and settling basin.

(c) The laying of one of the 36 inch rising mains to the filters.

(d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill.

(e) The construction of a pumping station at Tsun Wan.

(f) The construction of a pumping station and balance tank at Kau Wa Kang.

Page 77

Here is the rewritten response in HTML format as requested:

Page 65

306. In regard to the work previously approved satisfactory progress was made on the following:

(a) The construction of Waterfall dam.

(b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan.

(c) The erection of a building to house a 20 million gallons per day filtration plant.

(d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok.

(e) The construction of a 12-million gallon service reservoir at Kau Wa Kang.

(f) The construction of a 5-million gallon service reservoir at Ma Tau Wei.

(g) The construction of a 5-million gallon service reservoir at Diamond Hill.

(h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes.

307. Additional separate contracts were let and satisfactory progress made on the following:

(a) The construction of low gap dams Nos. 2 and 3.

(b) The construction of the catchwater tunnel and settling basin.

(c) The laying of one of the 36 inch rising mains to the filters.

(d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill.

(e) The construction of a pumping station at Tsun Wan.

(f) The construction of a pumping station and balance tank at Kau Wa Kang.

Page 77

Edit History

2026-05-11 20:16:56 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
306. In regard to the work previously approved satisfactory progress was made on the following: (a) The construction of Waterfall dam. (b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan. (c) The erection of a building to house a 20 million gallons per day filtration plant. (d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok. (e) The construction of a 12-million gallon service reservoir at Kau Wa Kang. (f) The construction of a 5-million gallon service reservoir at Ma Tau Wei. (g) The construction of a 5-million gallon service reservoir at Diamond Hill. (h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes. 307. Additional separate contracts were let and satisfactory progress made on the following: (a) The construction of low gap dams Nos. 2 and 3. (b) The construction of the catchwater tunnel and settling basin. (c) The laying of one of the 36 inch rising mains to the filters. (d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill. (e) The construction of a pumping station at Tsun Wan. (f) The construction of a pumping station and balance tank at Kau Wa Kang. Page 65 age 77 should be rewritten to Page 65 306. In regard to the work previously approved satisfactory progress was made on the following: (a) The construction of Waterfall dam. (b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan. (c) The erection of a building to house a 20 million gallons per day filtration plant. (d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok. (e) The construction of a 12-million gallon service reservoir at Kau Wa Kang. (f) The construction of a 5-million gallon service reservoir at Ma Tau Wei. (g) The construction of a 5-million gallon service reservoir at Diamond Hill. (h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes. 307. Additional separate contracts were let and satisfactory progress made on the following: (a) The construction of low gap dams Nos. 2 and 3. (b) The construction of the catchwater tunnel and settling basin. (c) The laying of one of the 36 inch rising mains to the filters. (d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill. (e) The construction of a pumping station at Tsun Wan. (f) The construction of a pumping station and balance tank at Kau Wa Kang. Page 77 Here is the rewritten response in HTML format as requested: Page 65 306. In regard to the work previously approved satisfactory progress was made on the following: (a) The construction of Waterfall dam. (b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan. (c) The erection of a building to house a 20 million gallons per day filtration plant. (d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok. (e) The construction of a 12-million gallon service reservoir at Kau Wa Kang. (f) The construction of a 5-million gallon service reservoir at Ma Tau Wei. (g) The construction of a 5-million gallon service reservoir at Diamond Hill. (h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes. 307. Additional separate contracts were let and satisfactory progress made on the following: (a) The construction of low gap dams Nos. 2 and 3. (b) The construction of the catchwater tunnel and settling basin. (c) The laying of one of the 36 inch rising mains to the filters. (d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill. (e) The construction of a pumping station at Tsun Wan. (f) The construction of a pumping station and balance tank at Kau Wa Kang. Page 77
Baseline (Original)
306. In regard to the work previously approved satisfactory progress was made on the following: (a) The construction of Waterfall dam. (b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan. (c) The erection of a building to house a 20 million gallons per day filtration plant. (d) Excavation for a 10-million gallon service reservoir near Lai Chi Kok. (e) The construction of a 12-million gallon service reservoir at Kau Wa Kang. (f) The construction of a 5-million gallon service reservoir at Ma Tau Wei. (g) The construction of a 5-million gallon service reservoir at Diamond Hill. (h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes. 307. Additional separate contracts were let and satisfactory progress made on the following: (a) The construction of low gap dams Nos. 2 and 3. (b) The construction of the catchwater tunnel and settling basin. (c) The laying of one of the 36 inch rising mains to the filters. (d) The laying of the trunk main between Lai Chi Kok Gap and Diamond Hill. (e) The construction of a pumping station at Tsun Wan. (f) The construction of a pumping station and balance tank at Kau Wa Kang. 65 age 77
2026-05-11 20:16:56 · Baseline
View content

306. In regard to the work previously approved satisfactory progress was made on the following:

(a) The construction of Waterfall dam.

(b) The construction of approximately 8,700 yards of tunnel generally 6 feet 9 inches in diameter between Tai Lam Chung and Tsun Wan.

(c) The erection of a building to house a 20 million gallons

per day filtration plant.

(d) Excavation for a 10-million gallon service reservoir

near Lai Chi Kok.

(e) The construction of a 12-million gallon service

reservoir at Kau Wa Kang.

(f) The construction of a 5-million gallon service reservoir

at Ma Tau Wei.

(g) The construction of a 5-million gallon service reservoir

at Diamond Hill.

(h) The laying of approximately 20,000 feet of 30 inch, 4,000 feet of 24 inch and 3,000 feet of 21 inch diameter steel pipes.

307. Additional separate contracts were let and satisfactory progress made on the following:

(a) The construction of low gap dams Nos. 2 and 3.

(b) The construction of the catchwater tunnel and settling

basin.

(c) The laying of one of the 36 inch rising mains to the

filters.

(d) The laying of the trunk main between Lai Chi Kok

Gap and Diamond Hill.

(e) The construction of a pumping station at Tsun Wan. (f) The construction of a pumping station and balance

tank at Kau Wa Kang.

65