1950-1951 — Page 31

Public Works Department Annual Report 工務司署年報 All AI Reviewed

A Barber-Greene spreader was used to lay the bituminous carpet on a concrete foundation. Laying and vibrating an 8-inch concrete base course outside Edinburgh House.

RAISING THE LEVEL OF QUEEN'S ROAD CENTRAL between Pedder and Ice House Streets. A maze of old cables and service pipes was re-laid during this operation.

A section of Queen's Road East is one of the many roads that have been recently re-laid with a vibrated concrete carriageway.

A new type of nightsoil-bucket carrier with an all-metal body designed and built by the mechanical section of the Public Works Department.

25-cwt. van bodies of all-metal construction are being built locally to suit individual requirements of Government departments.

Page 31

Page 32

Edit History

2026-05-11 19:04:44 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
A Barber-Greene spreader was used to lay the bituminous carpet on a concrete foundation. Laying and vibrating an 8-inch concrete base course outside Edinburgh House. RAISING THE LEVEL OF QUEEN'S ROAD CENTRAL between Pedder and Ice House Streets. A maze of old cables and service pipes was re-laid during this operation. A section of Queen's Road East is one of the many roads that have been recently re-laid with a vibrated concrete carriageway. A new type of nightsoil-bucket carrier with an all-metal body designed and built by the mechanical section of the Public Works Department. 25-cwt. van bodies of all-metal construction are being built locally to suit individual requirements of Government departments. Page 31 Page 32
Baseline (Original)
A Barber-Greene spreader was used to lay the bituminous carpet on a concrete foundation. Laying and vibrating an 8-inch concrete base course Edinburgh House. outside Page ge 31 RAISING THE LEVEL OF QUEEN'S ROAD CENTRAL between Pedder and Ice House Streets. A maze of old cables and service pipes was re- laid during this operation. A section of Queen's Road East is one of the many roads that have been recently re-laid with a vibrated concrete carriageway. - A new type of nightsoil-bucket carrier with an all-metal body designed and built by the mechanical section of the Public Works Department. 25-cwt. van bodies of all-metal construction are being built locally to suit individual requirements of Government departments. Page
2026-05-11 19:04:44 · Baseline
View content

A Barber-Greene spreader was

used to lay the bituminous carpet on a concrete foundation.

Laying and vibrating an 8-inch

concrete

base course

Edinburgh House.

outside

Page

ge 31

RAISING THE LEVEL

OF

QUEEN'S ROAD CENTRAL

between Pedder and Ice House Streets.

A maze of old cables and service pipes was re- laid during this operation.

A section of Queen's Road East is one of the many roads that have been recently re-laid with a vibrated concrete carriageway.

-

A new type of nightsoil-bucket carrier with an all-metal body designed and built by the mechanical section of the Public Works Department.

25-cwt. van bodies of all-metal

construction are being built locally to suit individual requirements of Government departments.

Page

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.