Q 44
241. Supply Main to Kowloon Tsai Service Reservoir:--This work was referred to in paragraph 217 of last year's report.
Due to shortage of staff it was only possible to carry out preliminary designs and investigations.
Expenditure
Expenditure to 31st Dec., 1938
$1,854.95
$1,854.95
242. Distribution, Island:-
Mains laid Size of Main Length (feet) Locality Remarks 8" Cast iron 8" 1,161 Belchers Street (Westwards from Queen's Road). Replacing old 5′′ & 4′′ mains. 8" 450 Near Old Kennedy Town Tank. Realignment owing to tank being abandoned. 8" 22 Des Voeux Road (Westwards from Wing Lok Street). Replacing old 7′′ main. 8" 80 Wing Lok Street (West end). Replacing old 5′′ main. 6" 6" 496 Connaught Road (Eastwards from Queen Street). Replacing old 4" main. 6" 286 Hennessy Road (East of Arsenal Street). 6" 236 Arsenal Street (North of Hennessy Road). New street alignment at Arsenal Street. 4" 4" 658 Approach Road to Kennedy Town Isolation Hospital. Replacing old 3" main. 4" 433 Mosque Junction. 3" 3" 153 Replacing old 3′′ main. 3" 1,389 New road off King's Road near I.L. 4955. To supply new lots. Tai Hang Road, Yik Kwan and Fuk Kwan Avenues. To new balance Tank (838 feet wrought iron and 551 feet cast iron).A 30,000 gallon steel balance tank was erected near Tai Hang Road above Fuk Kwan Avenue.
A 28,000 gallon steel balance tank was erected above the sisters' quarters at Kennedy Town Isolation Hospital to replace the old Kennedy Town service reservoir.
Alterations to the Mount Davis tunnel gauge basin were made and the 12′′ valve was replaced by an 18′′ valve.
Expenditure
Expenditure to 31st Dec., 1938
$17,878.64
$19,247.25
Page ...
Q 44
241. Supply Main to Kowloon Tsai Service Reservoir:--This work was referred to in paragraph 217 of last year's report.
Due to shortage of staff it was only possible to carry out preliminary designs and investigations.
Expenditure
Expenditure to 31st Dec., 1938
242. Distribution, Island:-
$1,854.95
$1,854.95
Mains laid
Size of
Length
Locality
Remarks
laid
Main
(feet)
8" Cast 1,161
iron
Belchers Street (Westwards from Replacing old 5′′ & 4′′
Queen's Road).
mains.
8"
450
Near Old Kennedy Town Tank.
Realignment owing to tank
being abandoned.
8"
دو
8"
22
80
Des Voeux Road (Westwards from Replacing old 7′′ main.
Wing Lok Street).
65
Wing Lok Street (West end).
Replacing old 5′′ main.
6"
"}
496
6"
286
6"
236
4′′
4"
4"
658
,,
Connaught Road (Eastwards from Replacing old 4" main.
Queen Street).
Hennessy Road (East of Arsenal
Street).
Arsenal Street (North of Hennessy
Road).
New street alignment at
Arsenal Street.
Approach Road to Kennedy Town Replacing old 3" main.
Isolation Hospital.
433
J
Mosque Junction.
153
3"
1,389
Replacing old 3′′ main.
New road off King's Road near To supply new lots.
I.L. 4955.
Tai Hang Road, Yik Kwan and To new balance Tank (838
Fuk Kwan Avenues.
feet wrought iron and 551 feet cast iron).
•
A 30,000 gallon steel balance tank was erected near Tai Hang Road above Fuk Kwan Avenue.
A 28,000 gallon steel balance tank was erected above the sisters' quarters at Kennedy Town Isolation Hospital to replace the old Kennedy Town service reservoir.
Alterations to the Mount Davis tunnel gauge basin were made and the 12′′ valve was replaced by an 18′′ valve.
Expenditure
Expenditure to 31st Dec., 1938
$17,878.64
$19,247.25