1938 — Page 24

Public Works Department Annual Report 工務司署年報 All AI Reviewed

22

Taipo Market; re-instating surface and tarpainting road between Taipo Shui Wai and Lam Tsuen Village Bridge; widening and surfacing for heavy traffic road between Taipo Market Bridge and Taipo Railway Tunnel; filling in catchwater, laying cement concrete flat channel and re-instating road edges, Taipo Road near Kowloon Reservoir.

The following are particulars of the areas laid-

Surface dressing (tarpaint)
Surface dressing (tartops)
New dry macadam surfacing
21" granolithic paving
New tarred macadam Square yards.
34,022
152
16,715
1,078
6,225

A traffic census taken on some of the main roads during a twelve-hour period (8.00 a.m. to 8.00 p.m.) gave the following results which are shown compared with the 1937 figures.

Points where Census was taken 1937 1938 Cars & Lorries
Motor and Cycles
Buses Cars & Lorries
Motor and Cycles
Buses Taipo Road at junction with Castle Peak Road. 223
156 291
209 Taipo Market 131
123 164
143 Fanling Cross Roads:- Sha Tau Kok Road 40
69 69
97 Sheung Shui Road 54
75 83
123 Fanling Road to Golf Club 107
97 155
148 Un Long:- To Sheung Shui side 73
181 129
252 To Castle Peak side 68
231 126
302 Castle Peak Road at Tsun Wan 226
220 369
386 Castle Peak Road at Prison 265
221 373
431

Expenditure $69,939.89

96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Repairs were carried out to submarine cable between Lantau and Cheung Chau.

Expenditure $4,353.47

97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition.

Expenditure $453.50

98. Street Lighting:-The total number of electric street lamps in use at the end of the year was 63, an increase of 31 over the previous year.

Expenditure $2,095.63

Edit History

2026-05-11 16:21:30 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
22 Taipo Market; re-instating surface and tarpainting road between Taipo Shui Wai and Lam Tsuen Village Bridge; widening and surfacing for heavy traffic road between Taipo Market Bridge and Taipo Railway Tunnel; filling in catchwater, laying cement concrete flat channel and re-instating road edges, Taipo Road near Kowloon Reservoir. The following are particulars of the areas laid- Surface dressing (tarpaint)Surface dressing (tartops)New dry macadam surfacing21" granolithic pavingNew tarred macadam Square yards.34,02215216,7151,0786,225 A traffic census taken on some of the main roads during a twelve-hour period (8.00 a.m. to 8.00 p.m.) gave the following results which are shown compared with the 1937 figures. Points where Census was taken 1937 1938 Cars & LorriesMotor and CyclesBuses Cars & LorriesMotor and CyclesBuses Taipo Road at junction with Castle Peak Road. 223156 291209 Taipo Market 131123 164143 Fanling Cross Roads:- Sha Tau Kok Road 4069 6997 Sheung Shui Road 5475 83123 Fanling Road to Golf Club 10797 155148 Un Long:- To Sheung Shui side 73181 129252 To Castle Peak side 68231 126302 Castle Peak Road at Tsun Wan 226220 369386 Castle Peak Road at Prison 265221 373431 Expenditure $69,939.89 96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Repairs were carried out to submarine cable between Lantau and Cheung Chau. Expenditure $4,353.47 97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Expenditure $453.50 98. Street Lighting:-The total number of electric street lamps in use at the end of the year was 63, an increase of 31 over the previous year. Expenditure $2,095.63
Baseline (Original)
22 Taipo Market; re-instating surface and tarpainting road between Taipo Shui Wai and Lam Tsuen Village Bridge; widening and surfacing for heavy traffic road between Taipo Market Bridge and Taipo Railway Tunnel; filling in catchwater, laying cement concrete flat channel and re-instating road edges, Taipo Road near Kowloon Reservoir. The following are particulars of the areas laid- Surface dressing (tarpaint) Surface dressing (tartops) New dry macadam surfacing 21" granolithic paving New tarred macadam Square yards. 34,022 152 16,715 1,078 6,225 A traffic census taken on some of the main roads during a twelve-hour period (8.00 a.m. to 8.00 p.m.) gave the following results which are shewn compared with the 1937 figures. 1937 1938 Points where Census was taken Cars & Lorries Cars & Lorries Motor and Motor and Cycles Buses Cycles Buses Taipo Road at junction with Castle Peak Road. 223 156 291 209 Taipo Market 131 123 164 143 Fanling Cross Roads:- Sha Tau Kok Road 40 69 69 97 Sheung Shui Road 54 75 83 123 Fanling Road to Golf Club 107 97 155 148 Un Long:- To Sheung Shui side 73 181 129 252 To Castle Peak side 68 231 126 302 Castle Peak Road at Tsun Wan 226 220 369 386 Castle Peak Road at Prison 265 221 373 431 Expenditure $69,939.89 96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Repairs were carried out to submarine cable between Lantau and Cheung Chau. Expenditure $4,353.47 97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good condition. Expenditure $453.50 98. Street Lighting:-The total number of electric street lamps in use at the end of the year was 63, an increase of 31 over the previous year. Expenditure $2,095.63
2026-05-11 16:21:30 · Baseline
View content

22

Taipo Market; re-instating surface and tarpainting road between Taipo Shui Wai and Lam Tsuen Village Bridge; widening and surfacing for heavy traffic road between Taipo Market Bridge and Taipo Railway Tunnel; filling in catchwater, laying cement concrete flat channel and re-instating road edges, Taipo Road near Kowloon

Reservoir.

The following are particulars of the areas laid-

Surface dressing (tarpaint)

Surface dressing (tartops)

New dry macadam surfacing

21" granolithic paving

New tarred macadam

Square yards.

34,022

152

16,715

1,078

6,225

A traffic census taken on some of the main roads during a twelve-hour period (8.00 a.m. to 8.00 p.m.) gave the following results which are shewn compared with the 1937 figures.

1937

1938

Points where Census was taken

Cars &

Lorries

Cars &

Lorries

Motor and

Motor

and

Cycles

Buses

Cycles

Buses

Taipo Road at junction with Castle Peak Road.

223

156

291

209

Taipo Market

131

123

164

143

Fanling Cross Roads:-

Sha Tau Kok Road

40

69

69

97

Sheung Shui Road

54

75

83

123

Fanling Road to Golf Club

107

97

155

148

Un Long:-

To Sheung Shui side

73

181

129

252

To Castle Peak side

68

231

126

302

Castle Peak Road at Tsun Wan

226

220

369

386

Castle Peak Road at Prison

265

221

373

431

Expenditure

$69,939.89

96. Maintenance of Telephones:-Lines and instruments were maintained in good order. Repairs were carried out to submarine cable between Lantau and Cheung

Chau.

Expenditure

$4,353.47

97. Maintenance of Sewers, Nullahs, etc.:-Sewers, storm water drains, trained nullahs and concrete channels were cleansed, repaired, and maintained in good

condition.

Expenditure

$453.50

98. Street Lighting:-The total number of electric street lamps in use at the end of the year was 63, an increase of 31 over the previous year.