1936 — Page 25

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Q 23

Between the 10th and 17th December a traffic census was taken at the undernoted points. During a twelve hour period (8 a.m. to 8 p.m.) the following results were obtained and these are shown compared with the 1935 figures.

Street Point where Census was taken 1935
Cars and Lorries
Motor and Cycles 1936
Cars and Lorries
Buses 1936
Motor
and
Cycles Nathan Road....... Salisbury Road Junction................. 1,465 1,896 1,120 1,197 Nathan Road...... Waterloo Road Junction 2,516 2,908 1,681 1,686 Salisbury Road...... Nathan Road Junction 1,722 2,194 1,433 1,520 Jordan Road Canton Road Junction .... 428 651 1,306 1,268 Canton Road ... Jordan Road Junction... 127 115 344 327 Waterloo Road...... Nathan Road Junction 876 1,592 177 189 Waterloo Road...... Shanghai Street Junction 44 87 Waterloo Road...... Prince Edward Road Junction 64 1,329 111 402 Shanghai Street..... Waterloo Road Junction........ 76 471 Shanghai Street..... Prince Edward Road Junction 1.27 559 Prince Edward Rd. Shanghai Street Junction 39 461 Prince Edward Rd. Waterloo Road Junction....... 53 468 59 359 120 617 264 862 1,012 853

Expenditure $22,369.94

76. Maintenance of Telephones :-The lines and instruments, including those of the Kowloon-Canton Railway, were maintained in good order.

Expenditure $3,335.83

77. Maintenance of Sewers, Nullahs, etc. :-Sewers, storm water drains and trained nullahs were cleansed, re-paired and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Automatic flushing tanks were kept working continuously, and sand deposits, as these accumulated, were removed. Many defective traps, gullies gratings, etc., were replaced.

Expenditure $6,848.81

78. Gas Lighting:-The total number of street lamps in use at the end of the year, all of which are incandescent, was 581, an increase of thirteen over the previous year. Experiments with an improved type of gas lamp were carried out during the year.

Expenditure $32,171.41

Edit History

2026-05-11 15:36:47 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 23 Between the 10th and 17th December a traffic census was taken at the undernoted points. During a twelve hour period (8 a.m. to 8 p.m.) the following results were obtained and these are shown compared with the 1935 figures. Street Point where Census was taken 1935Cars and LorriesMotor and Cycles 1936Cars and LorriesBuses 1936MotorandCycles Nathan Road....... Salisbury Road Junction................. 1,465 1,896 1,120 1,197 Nathan Road...... Waterloo Road Junction 2,516 2,908 1,681 1,686 Salisbury Road...... Nathan Road Junction 1,722 2,194 1,433 1,520 Jordan Road Canton Road Junction .... 428 651 1,306 1,268 Canton Road ... Jordan Road Junction... 127 115 344 327 Waterloo Road...... Nathan Road Junction 876 1,592 177 189 Waterloo Road...... Shanghai Street Junction 44 87 Waterloo Road...... Prince Edward Road Junction 64 1,329 111 402 Shanghai Street..... Waterloo Road Junction........ 76 471 Shanghai Street..... Prince Edward Road Junction 1.27 559 Prince Edward Rd. Shanghai Street Junction 39 461 Prince Edward Rd. Waterloo Road Junction....... 53 468 59 359 120 617 264 862 1,012 853 Expenditure $22,369.94 76. Maintenance of Telephones :-The lines and instruments, including those of the Kowloon-Canton Railway, were maintained in good order. Expenditure $3,335.83 77. Maintenance of Sewers, Nullahs, etc. :-Sewers, storm water drains and trained nullahs were cleansed, re-paired and maintained in good condition. Open channels and nullahs were cleansed by the Sanitary Department. Automatic flushing tanks were kept working continuously, and sand deposits, as these accumulated, were removed. Many defective traps, gullies gratings, etc., were replaced. Expenditure $6,848.81 78. Gas Lighting:-The total number of street lamps in use at the end of the year, all of which are incandescent, was 581, an increase of thirteen over the previous year. Experiments with an improved type of gas lamp were carried out during the year. Expenditure $32,171.41
Baseline (Original)
Q 23 Between the 10th and 17th December a traffic census was taken at the undernoted points. During a twelve hour period (8 a.m. to 8 p.m.) the following results were obtained and these are shewn compared with the 1935 figures. 19 3 5 1 9 3 6 Street Point where Census was taken Cars and Lorries Motor and Cycles Cars and Lorries Motor and Buses Cycles Buses Nathan Road....... Salisbury Road Junction................. 1,465 1,120 1,896 1,197 Nathan Road...... Waterloo Road Junction 2,516 1,681 2,908 1,686 Salisbury Road...... Nathan Road Junction 1,722 1,433 2,194 1,520 Jordan Road Canton Road Junction .... 428 1,306 651 1,268 Canton Road ... Jordan Road Junction... 127 344 115 327 Waterloo Road...... Nathan Road Junction 876 177 1,592 189 Waterloo Road...... Shanghai Street Junction ...... Waterloo Road...... Prince Edward Road Junction Shanghai Street..... Waterloo Road Junction........ Shanghai Street..... Prince Edward Road Junction Prince Edward Rd. Shanghai Street Junction Prince Edward Rd. Waterloo Road Junction....... 44 87 64 111 918 381 1,329 402 76 471 1.27 559 39 461 53 468 59 359 120 264 617 862 1,012 853 Expenditure $22,369.94 76. Maintenance of Telephones :-The lines and instru- ments, including those of the Kowloon-Canton Railway, were maintained in good order. Expenditure $3,335.83 77. Maintenance of Sewers, Nullahs, etc. :-Sewers, storm water drains and trained nullahs were cleansed, re- Open channels paired and maintained in good condition. and nullahs were cleansed by the Sanitary Department. Automatic flushing tanks were kept working continuously, and sand deposits, as these accumulated, were removed. Many defective traps, gullies gratings, etc., were replaced. Expenditure $6,848.81 78. Gas Lighting:-The total number of street lamps in use at the end of the year, all of which are incandescent, was 581, an increase of thirteen over the previous year. Experiments with an improved type of gas lamp were carried out during the year. Expenditure $32,171.41
2026-05-11 15:36:47 · Baseline
View content

Q 23

Between the 10th and 17th December a traffic census was taken at the undernoted points. During a twelve hour period (8 a.m. to 8 p.m.) the following results were obtained and these are shewn compared with the 1935 figures.

19 3 5

1 9 3 6

Street

Point where Census was taken

Cars and Lorries Motor and Cycles

Cars and Lorries

Motor

and

Buses

Cycles

Buses

Nathan Road.......

Salisbury Road Junction.................

1,465

1,120

1,896

1,197

Nathan Road......

Waterloo Road Junction

2,516

1,681

2,908

1,686

Salisbury Road...... Nathan Road Junction

1,722

1,433

2,194

1,520

Jordan Road

Canton Road Junction ....

428

1,306

651

1,268

Canton Road ...

Jordan Road Junction...

127

344

115

327

Waterloo Road...... Nathan Road Junction

876

177

1,592

189

Waterloo Road...... Shanghai Street Junction ...... Waterloo Road...... Prince Edward Road Junction Shanghai Street..... Waterloo Road Junction........ Shanghai Street..... Prince Edward Road Junction Prince Edward Rd. Shanghai Street Junction Prince Edward Rd. Waterloo Road Junction.......

44

87

64

111

918

381

1,329

402

76

471

1.27

559

39

461

53

468

59

359

120

264

617

862

1,012

853

Expenditure

$22,369.94

76.

Maintenance of Telephones :-The lines and instru- ments, including those of the Kowloon-Canton Railway, were maintained in good order.

Expenditure

$3,335.83

77. Maintenance of Sewers, Nullahs, etc. :-Sewers, storm water drains and trained nullahs were cleansed, re- Open channels paired and maintained in good condition. and nullahs were cleansed by the Sanitary Department. Automatic flushing tanks were kept working continuously, and sand deposits, as these accumulated, were removed. Many defective traps, gullies gratings, etc., were replaced.

Expenditure

$6,848.81

78. Gas Lighting:-The total number of street lamps in use at the end of the year, all of which are incandescent, was 581, an increase of thirteen over the previous year. Experiments with an improved type of gas lamp were carried out during the year.

Expenditure

$32,171.41