Q 19
62. Water Meters:-The number of meters examined and repaired was 5,552. Eight meters were tested in accordance with Regulation 9 of the Water Works Regulations.
The number of meters on the island at the end of the year was:
City of Victoria 12,795 Peak District 301 Pokfulum and Mount Davis 94 85 Deep Water Bay (R.B.L.245) 25 Repulse Bay 32 Stanley and Tytam 76 Aberdeen and Aplichau 162 Shaukiwan 1 Stonecutters' Island I Under Repair at Workshop 634 Total 14,205 Expenditure $46,927.6463. Maintenance of Praya Walls and Piers-Praya Walls and Piers were maintained in a satisfactory condition. Repairs were carried out to the following piers: -Blake, French Street, Jubilee Street passenger ferry, Harbour Office, King Shan, Murray, Queen's, Sai Wan Ho and Tonnochy Road.
The Refuse Boat Piers were maintained in satisfactory condition; the conservancy junk pier at Whitfield was reconstructed.
The hoists on the passenger ferry berth at Jubilee Street were maintained in good condition.
A number of rocks were discovered in a shallow patch near Tonnochy Road pier and were removed by blasting to give a depth of 8.0 feet chart datum.
Expenditure
$10,470.80
64. Maintenance of Public Cemetery :-The Cemeteries were generally maintained in a satisfactory manner. paths in the Colonial Cemetery were laid with 24″ granolithic paving.
Expenditure
$935.92
Q 19
62. Water Meters:-The number of meters examined. and repaired was 5,552. Eight meters were tested in accordance with Regulation 9 of the Water Works Regula- tions.
The number of meters on the island at the end of the year was:
City of Victoria
Peak District
Pokfulum and Mount Davis
12,795
301
94
85
:
Deep Water Bay (R.B.L. 245)
25
Repulse Bay
Stanley and Tytam
32
76
Aberdeen and Aplichau
Shaukiwan
162
Stonecutters' Island
1
I
Under Repair at Workshop
634
Total
14,205
Expenditure
$46,927.64
63. Maintenance of Praya Walls and Piers-Praya Walls and Piers were maintained in a satisfactory condition. Repairs were carried out to the following piers: -Blake, French Street, Jubilee Street passenger ferry, Harbour Office, King Shan, Murray, Queen's, Sai Wan Ho and Tonnochy Road.
The Refuse Boat Piers were maintained in satisfactory condition; the conservancy junk pier at Whitfield was re-
constructed.
The hoists on the passenger ferry berth at Jubilee Street were maintained in good condition.
A number of rocks were discovered in a shallow patch near Tonnochy Road pier and were removed by blasting to give a depth of 8.0 feet chart datum.
Expenditure
$10,470.80
New
64. Maintenance of Public Cemetery :-The Cemeteries were generally maintained in a satisfactory manner. paths in the Colonial Cemetery were laid with 24′′ granolithic paving.
Expenditure
$ 935.92