1931 — Page 22

Public Works Department Annual Report 工務司署年報 All AI Reviewed

P.W.R. Kowloon.

21

KOWLOON.

129. Maintenance of Buildings.-Government buildings were in a good state of repair. Painting, colourwashing, and repairs carried out to fifteen buildings were in accordance with the recurring programme. Major repairs included the following: Police Training School-Cement surfacing to compound and renewing existing wooden floors in concrete, Central British School-Renewing ceilings, Ma Tau Kok Cattle Depot-Extensive repairs, Kowloon Magistracy-Repair of extensive white ant damage. The electrical installations were maintained in good order. Two hundred and sixty-eight fans, twenty-two radiators were cleaned and overhauled. Seventeen hundred and twenty-three points in seven Government buildings were tested and repaired, and inventories of electrical fittings issued.

Expenditure $23,239.16

130. Improvements to Buildings. The principal improvements carried out under this heading were as follows:-

Yaumati Pig Market-Extension to; Mong Kok Fire Station Alteration to house ambulance; Mong Kok Police Station-Renew wood floors in concrete; Kowloon Junior School-Erected fence along approach path to protect children from falling over bank.

Expenditure $1,712.42

131. Roads and Bridges (Maintenance and Improvements). The surfaces of approximately fifty-three miles of roads were generally maintained in a satisfactory manner.

The following are particulars of areas laid with improved surfacing during the year:

(1) Tarring and sanding additional area 37,233 Square yards.

(2) 21" granolithic paving slabs laid on footways 19,508

(3) Substitution of 7" reinforced concrete surfacing for ordinary macadam, tarpainted... 19,145

(4) New dry macadam surfacing... 37,233

Expenditure $78,228.34

132. Maintenance of Telephones. The lines and instruments were maintained in good order. The lines and instruments in the Kowloon-Canton Railway were also maintained in a satisfactory manner.

Expenditure $2,974.13

133. Maintenance of Sewers, Nullahs, &c. The sewers, stormwater drains, and trained nullahs were cleansed, repaired, and maintained in good condition; the open channels and nullahs...

Edit History

2026-05-11 13:59:58 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.R. Kowloon. 21 KOWLOON. 129. Maintenance of Buildings.-Government buildings were in a good state of repair. Painting, colourwashing, and repairs carried out to fifteen buildings were in accordance with the recurring programme. Major repairs included the following: Police Training School-Cement surfacing to compound and renewing existing wooden floors in concrete, Central British School-Renewing ceilings, Ma Tau Kok Cattle Depot-Extensive repairs, Kowloon Magistracy-Repair of extensive white ant damage. The electrical installations were maintained in good order. Two hundred and sixty-eight fans, twenty-two radiators were cleaned and overhauled. Seventeen hundred and twenty-three points in seven Government buildings were tested and repaired, and inventories of electrical fittings issued. Expenditure $23,239.16 130. Improvements to Buildings. The principal improvements carried out under this heading were as follows:- Yaumati Pig Market-Extension to; Mong Kok Fire Station Alteration to house ambulance; Mong Kok Police Station-Renew wood floors in concrete; Kowloon Junior School-Erected fence along approach path to protect children from falling over bank. Expenditure $1,712.42 131. Roads and Bridges (Maintenance and Improvements). The surfaces of approximately fifty-three miles of roads were generally maintained in a satisfactory manner. The following are particulars of areas laid with improved surfacing during the year: (1) Tarring and sanding additional area 37,233 Square yards. (2) 21" granolithic paving slabs laid on footways 19,508 (3) Substitution of 7" reinforced concrete surfacing for ordinary macadam, tarpainted... 19,145 (4) New dry macadam surfacing... 37,233 Expenditure $78,228.34 132. Maintenance of Telephones. The lines and instruments were maintained in good order. The lines and instruments in the Kowloon-Canton Railway were also maintained in a satisfactory manner. Expenditure $2,974.13 133. Maintenance of Sewers, Nullahs, &c. The sewers, stormwater drains, and trained nullahs were cleansed, repaired, and maintained in good condition; the open channels and nullahs...
Baseline (Original)
P.W.R. Kowloon. 21 KOWLOON. 129. Maintenance of Buildings.-Government buildings were a good state of repair. Painting, colourwashing and kept in in accordance with the recurring programme were repairs carried out to fifteen buildings. Major repairs included the fol- Police Training School-Cement surfacing to compound lowing: and renewing existing wooden floors in concrete, Central British School-Renewing ceilings, Ma Tau Kok Cattle Depot-Exten- sive repairs, Kowloon Magistracy-Repair of extensive white ant damage. The electrical installations were maintained in good order. Two hundred and sixty-eight fans, twenty-two radiators were cleaned and overhauled. Seventeen hundred and twenty- three points in seven Government buildings were tested and re- paired and inventories of electrical fittings issued. Expenditure $23,239.16 130. Improvements to Buildings. The principal improve- ments carried out under this heading were as follows:- Yaumati Pig Market-Extension to; Mong Kok Fire Station Alteration to house ambulance; Mong Kok Police Station-Renew wood floors in concrete; Kow- loon Junior School-Erected fence along approach path to protect children from falling over bank. Expenditure $1,712.42 131. Roads and Bridges (Maintenance and Improvements). The surfaces of approximately fifty-three miles of roads were generally maintained in a satisfactory manner. the The following are particulars of laid with improved surfacing during the year: (1) Tarring and sanding (2) 21" granolithic paving slabs laid on footways (3) Substitution of 7" reinforced concrete surfacing for ordin- ary' macadam, tarpainted... (4) New dry macadam surfacing... Expenditure additional area Square yards. 37,233 19.508 19,145 37,233 $78,228.34 132. Maintenance of Telephones. The lines and instru- ments were maintained in good order. The lines and instruments in the Kowloon-Canton Railway were also maintained in a satis- factory manner. Expenditure $2,974.13 133. Maintenance of Sewers, Nullahs, &c. The sewers, stormwater drains, and trained nullahs were cleansed, repaired and maintained in good condition, the open channels and nullahs
2026-05-11 13:59:58 · Baseline
View content

P.W.R. Kowloon.

21

KOWLOON.

129. Maintenance of Buildings.-Government buildings were a good state of repair. Painting, colourwashing and kept in

in accordance with the recurring programme were repairs carried out to fifteen buildings. Major repairs included the fol- Police Training School-Cement surfacing to compound lowing: and renewing existing wooden floors in concrete, Central British School-Renewing ceilings, Ma Tau Kok Cattle Depot-Exten- sive repairs, Kowloon Magistracy-Repair of extensive white ant damage. The electrical installations were maintained in good order. Two hundred and sixty-eight fans, twenty-two radiators were cleaned and overhauled. Seventeen hundred and twenty- three points in seven Government buildings were tested and re- paired and inventories of electrical fittings issued.

Expenditure

$23,239.16

130. Improvements to Buildings. The principal improve- ments carried out under this heading were as follows:-

Yaumati Pig Market-Extension to; Mong Kok Fire Station Alteration to house ambulance; Mong Kok Police Station-Renew wood floors in concrete; Kow- loon Junior School-Erected fence along approach path to protect children from falling over bank.

Expenditure

$1,712.42

131. Roads and Bridges (Maintenance and Improvements). The surfaces of approximately fifty-three miles of roads were generally maintained in a satisfactory manner.

the

The following are particulars of laid with improved surfacing during the year:

(1) Tarring and sanding

(2) 21" granolithic paving slabs laid

on footways

(3) Substitution of 7" reinforced concrete surfacing for ordin- ary' macadam, tarpainted...

(4) New dry macadam surfacing...

Expenditure

additional area

Square yards.

37,233

19.508

19,145

37,233 $78,228.34

132. Maintenance of Telephones. The lines and instru- ments were maintained in good order. The lines and instruments in the Kowloon-Canton Railway were also maintained in a satis- factory manner.

Expenditure

$2,974.13

133. Maintenance of Sewers, Nullahs, &c. The sewers, stormwater drains, and trained nullahs were cleansed, repaired and maintained in good condition, the open channels and nullahs