P.W.E. Hong Kong.
76
Alterations of Existing Stormwater Drains in Wanchai:-
Size Description Length Locality Position Remarks 18" Stormwater Drain 71' Praya East Morrison Hill Road Completed 12" 153' Praya East Yee Woo StreetWater Mains.--72 feet of 10" main were laid at junction of Johnston and Hennessy Roads.
The following table is an analysis of the total expenditure during the year:
Head of Expenditure Expenditure during 1930 $ Cts. Contract No. 12 of 1921 65,212 32 Dredging Alteration of Existing Sewers 55,819 10 Alteration of Existing Stormwater Drains 4,919 50 Water Mains 1,046 63 Roads 132,990 27 Salaries and Supervision 11,777 32 Advance Account Contract No. 12 of 1921 Items subsidiary to but not included in Bonus Payment on Contract No. 12 of 1921.. Total $271,765 14The total cost of carrying out the Scheme amounted to $5,421,493.38 of this amount $271,765.14 was expended during 1930.
P.W.E. Hong Kong.
76
Alterations of Existing Stormwater Drains in Wanchai:-
Size.
Description.
Length.
Locality.
Position.
Remarks.
18"
Storm-
71'
water Drain.
Praya East
Morrison Hill Road.
Com-
pleted.
12"
153
>"
Praya East
Yee Woo Street.
""
Water Mains.--72 feet of 10" main were laid at junction of Johnston and Hennessy Roads.
The following table is an analysis of the total expenditure during the year:
Head of Expenditure.
Expenditure during 1930.
$
Cts.
Contract No. 12 of 1921
65,212.32
Dredging
Alteration of Existing Sewers
55,819.10
Alteration of Existing Stormwater Drains
4,919.50
Water Mains
1,046.63
Roads
132,990.27
Salaries and Supervision
11,777.32
Advance Account
Contract No. 12 of 1921
Items subsidiary to but not included in
Bonus Payment on Contract No. 12 of 1921..
Total
$271,765.14
The total cost of carrying out the Scheme amounted to $5,421,493.38 of this amount $271,765.14 was expended during 1930.