1913 — Page 56

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Hongkong.

54

(d.) Underground Trough Closet at the foot of Pottinger Street.-A contract for this work was let in October, but, before its construction could be commenced, it was necessary to lower the sewer in Pottinger Street. By the end of the year, the excavation for the site and lowering of the sewer were well advanced, but progress was necessarily slow owing to the existence of rock in the lower portion of the site, the close proximity of buildings and the presence of a large water main, which could not be disturbed. In connection with the laying of a pipe for conveying water from Glenealy culvert to the trough closet near the Fire Brigade Station, provision was made for affording a supply to this convenience also.

1913 Estimates, ...$10,000.00 1913 Expenditure,

Total Estimates,...$11,000.00 616.88 Expenditure to 31/12/13, 616.88

(e.) Extension of Latrine at Bath House in Cross Lane, Wantsai.--A contract for this extension was let in July and the work was completed in December. It consisted of bricking up the access from the bath-house to the latrine; making an addition at the north-east corner of the building; providing an entrance in Cross Lane; and increasing the latrine accommodation from 4 seats to 12 and the urinals from 1 stall to 2.

1913 Estimates, $800.00 Total Estimates,......$800.00 1913 Expenditure, 777.39 Expenditure to 31/12/13, 777.89

107. Roads and Streets:

Diversion of Wongneichong Road in connection with the conversion of Farm Lot 52 into Inland Lots.-This work was described in last year's Report under the heading "(e) General Works" (vide paragraph 101, item vi). It was completed in April.

1913 Estimates, ..$2,000.00 Total Estimates,...$4,400.00 1913 Expenditure, 1,076.16 Expenditure to 31/12/13,.. 3,476.66

(b.) Extension of Belchers Street past Marine Lots 266-268, Kennedy Town. This work was also described in last year's Report under the heading "(e) General Works" (vide paragraph 101, item v). The work was completed in May. The stormwater drain at the junction of Belchers and Beach Streets was extended with 24" pipes to the nullah south of Belchers Street.

1913 Estimates, ...$1,500.00 Total Estimates, ...$4,500.00 1913 Expenditure,... 1,281.95 Expenditure to 31/12/13, 3,108.70

Edit History

2026-05-11 11:42:21 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Hongkong. 54 (d.) Underground Trough Closet at the foot of Pottinger Street.-A contract for this work was let in October, but, before its construction could be commenced, it was necessary to lower the sewer in Pottinger Street. By the end of the year, the excavation for the site and lowering of the sewer were well advanced, but progress was necessarily slow owing to the existence of rock in the lower portion of the site, the close proximity of buildings and the presence of a large water main, which could not be disturbed. In connection with the laying of a pipe for conveying water from Glenealy culvert to the trough closet near the Fire Brigade Station, provision was made for affording a supply to this convenience also. 1913 Estimates, ...$10,000.00 1913 Expenditure, Total Estimates,...$11,000.00 616.88 Expenditure to 31/12/13, 616.88 (e.) Extension of Latrine at Bath House in Cross Lane, Wantsai.--A contract for this extension was let in July and the work was completed in December. It consisted of bricking up the access from the bath-house to the latrine; making an addition at the north-east corner of the building; providing an entrance in Cross Lane; and increasing the latrine accommodation from 4 seats to 12 and the urinals from 1 stall to 2. 1913 Estimates, $800.00 Total Estimates,......$800.00 1913 Expenditure, 777.39 Expenditure to 31/12/13, 777.89 107. Roads and Streets: Diversion of Wongneichong Road in connection with the conversion of Farm Lot 52 into Inland Lots.-This work was described in last year's Report under the heading "(e) General Works" (vide paragraph 101, item vi). It was completed in April. 1913 Estimates, ..$2,000.00 Total Estimates,...$4,400.00 1913 Expenditure, 1,076.16 Expenditure to 31/12/13,.. 3,476.66 (b.) Extension of Belchers Street past Marine Lots 266-268, Kennedy Town. This work was also described in last year's Report under the heading "(e) General Works" (vide paragraph 101, item v). The work was completed in May. The stormwater drain at the junction of Belchers and Beach Streets was extended with 24" pipes to the nullah south of Belchers Street. 1913 Estimates, ...$1,500.00 Total Estimates, ...$4,500.00 1913 Expenditure,... 1,281.95 Expenditure to 31/12/13, 3,108.70
Baseline (Original)
Hongkong. 54 (d.) Underground Trough Closet at the foot of Pottinger Street.-A contract for this work was let in October, but, before its construction could be commenced, it was necessary to lower the sewer in Pottinger Street. By the end of the year, the excavation for the site and lowering of the sewer were well advanced, but progress was necessarily slow owing to the existence of rock in the lower portion of the site, the close proximity of buildings and the presence of a large water main, which could not be disturbed. In connection with the laying of a pipe for conveying water from Glenealy culvert to the trough closet near the Fire Brigade Station, provision was made for affording a supply to this con- venience also. 1913 Estimates, ...$10,000.00 1913 Expenditure, Total Estimates,...$11,000.00 616.88 Expenditure to 31/12/13, . 616.88 (e.) Extension of Latrine at Bath House in Cross Lane, Wantsai.--A contract for this extension was let in July and the work was completed in December. It consisted of bricking up the access from the bath-house to the latrine; making an addition at the north-east corner of the building; providing an entrance in Cross Lane; and increasing the latrine accommodation from 4 seats to 12 and the urinals from 1 stall to 2. 1913 Estimates, 1913 Expenditure, | $800.00 Total Estimates,......$800.00 777.39 Expenditure to 31/12/13, 107. Roads and Streets: 777.89 Diversion of Wongneichong Road in connection with the conversion of Farm Lot 52 into Inland Lots.-This work was described in last year's Report under the heading" (e) General Works" (vide paragraph 101, item vi). It was completed in April. ... 1913 Estimates, ..$2,000.00 | Total Estimates,...$4,400.00 1913 Expenditure, 1,076.16 Expenditure to 31/12/13,.. 3,476.66 (b.) Extension of Belchers Street past Marine Lots 266-268, Kennedy Town. This work was also described in last year's Re- port under the heading "(e) General Works" (vide paragraph 101, item v). The work was completed in May. The stormwater drain at the junction of Belchers and Beach Streets was extended with 24" pipes to the nullah south of Belchers Street. 1913 Estimates, ...$1,500.00 | Total Estimates, ...$4,500.00 1913 Expenditure,... 1,281.95 Expenditure to | 31/12/13, 3,108.70 ..
2026-05-11 11:42:21 · Baseline
View content

Hongkong.

54

(d.) Underground Trough Closet at the foot of Pottinger Street.-A contract for this work was let in October, but, before its construction could be commenced, it was necessary to lower the sewer in Pottinger Street. By the end of the year, the excavation for the site and lowering of the sewer were well advanced, but progress was necessarily slow owing to the existence of rock in the lower portion of the site, the close proximity of buildings and the presence of a large water main, which could not be disturbed. In connection with the laying of a pipe for conveying water from Glenealy culvert to the trough closet near the Fire Brigade Station, provision was made for affording a supply to this con-

venience also.

1913 Estimates, ...$10,000.00 1913 Expenditure,

Total Estimates,...$11,000.00 616.88 Expenditure to

31/12/13, .

616.88

(e.) Extension of Latrine at Bath House in Cross Lane, Wantsai.--A contract for this extension was let in July and the work was completed in December. It consisted of bricking up

the access from the bath-house to the latrine; making an addition at the north-east corner of the building; providing an entrance in Cross Lane; and increasing the latrine accommodation from 4 seats to 12 and the urinals from 1 stall to 2.

1913 Estimates, 1913 Expenditure,

|

$800.00 Total Estimates,......$800.00

777.39 Expenditure to

31/12/13,

107. Roads and Streets:

777.89

Diversion of Wongneichong Road in connection with the conversion of Farm Lot 52 into Inland Lots.-This work was described in last year's Report under the heading" (e) General Works" (vide paragraph 101, item vi). It was completed in April.

...

1913 Estimates, ..$2,000.00 | Total Estimates,...$4,400.00 1913 Expenditure, 1,076.16 Expenditure to

31/12/13,..

3,476.66

(b.) Extension of Belchers Street past Marine Lots 266-268, Kennedy Town. This work was also described in last year's Re- port under the heading "(e) General Works" (vide paragraph 101, item v). The work was completed in May. The stormwater drain at the junction of Belchers and Beach Streets was extended with 24" pipes to the nullah south of Belchers Street.

1913 Estimates,

...$1,500.00 | Total Estimates, ...$4,500.00 1913 Expenditure,... 1,281.95 Expenditure to

|

31/12/13, 3,108.70

..