STATEMENT NO.
At the beginning
of the year 1.4.51
Part I-Construction Accounts
C- 1 General Expenditure
770,814.12
C- 2 Preliminary Expenditure
80,045.23
C- 3
Land
5,210,696.83
C- 4
Formation
2,717,610.62
C- 5
Tunnels
3,584,168.19
C- 6
Bridgework
1,327,901.17
C- 7 Line Protection
90,074.47
C- 8 Telegraph & Telephones
C- 9
Track
C-10 Signals & Switches
10,000.00
4,318,661.16
186,984.70
C-11 Stations & Buildings
1,887,479.44
C-12 Central Mechanical Works
553,234.15
C-14 Plant
1,823,693.02
C-15 Rolling Stock
10,970,910.11
C-17 Docks, Harbour & Wharves
65,171.06
Total Cost
33,597,444,27
New Lines : Extention:
(A) One turning wheel lathe 84" diameter swing motor drive
sold by auction
$
25,00
One wheel hydraulic press-300 lbs. per inch sold by auction
One diesel engine 1 cycle 525 r.p.m. sold by auction
One gasoline engine generator set 50A. A.C. 1700 r.p.m. sold
by auction
3,00
60
38
40
One power hack saw 12′′ stroke sold by auction
One 350V. 3-phase 50 cycles A.C. 2900 r.p.m. 4 H.P. Motor
sold by auction
16
£
$ 29,39