1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 45
[Subsidiary]
B10. Describe the proposed method(s) of sludge removal and disposal to be employed at the plant, and estimate the amounts of sludge to be generated over a 2-year period.
B11. Specify one or more points on the proposed plant at which samples of any discharge or deposit from the plant may be taken by the Authority as being representative of the quality and quantity of the discharge or deposit.
SECTION C. DECLARATION
C1.
C2. I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct.
*I/We intend to apply to the Secretary/under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely
* Delete if inapplicable.
/APPLICANT
MANAGER OF DOMESTIC SEWAGE TREATMENT PLANT
(If not the applicant)
C3. Signature/s Name/s (Block letters) Date
The fee prescribed in the Third Schedule to the Water Pollution Control (General) Regulations should accompany this application.
SECTION D. LOCATION OF PROPOSED DOMESTIC SEWAGE TREATMENT PLANT, OF PROPOSED DISCHARGE POINT AND OF PROPOSED SAMPLING POINT
D1.
D2. Draw in the space provided, or on a separate sheet, a sketch plan, as near as possible to scale, showing the location of the proposed domestic sewage treatment plant. On the plan-
(a) show the catchment area to be served by the plant;
(b) show the relationship of the plant to the nearest major road intersection, and name the roads; or show the relationship of the plant to a readily identifiable landmark;
(c) show any public drain, public sewer, or waters of Hong Kong adjacent to the proposed plant; and
(d) mark the location of every proposed discharge point.
Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the proposed domestic sewage treatment plant. Mark on the plan the location of every proposed sampling point.
Page 45
Page 46
1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 45
[Subsidiary]
B10.
Describe the proposed method(s) of sludge removal and disposal to be employed at the plant, and estimate the amounts of sludge to be generated over a 2-year period.
B11. Specify one or more points on the proposed plant at which samples of any discharge or deposit from the plant may be taken by the Authority as being representative of the quality and quantity of the discharge or deposit.
SECTION C. DECLARATION
C1.
C2.
I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct.
*I/We intend to apply to the Secretary/under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely
* Delete if inapplicable.
/APPLICANT
MANAGER OF DOMESTIC SEWAGE TREATMENT PLANT
(If not the applicant)
C3.
Signature/s
Name/s
(Block letters)
Date
The fee/prescribed in the Third Schedule to the Water Pollution Control (General) Regulations should accompany this application.
SECTION D. LOCATION OF PROPOSED DOMESTIC SEWAGE
TREATMENT PLANT, OF PROPOSED DISCHARGE POINT AND OF PROPOSED SAMPLING POINT
DI.
D2.
Draw in the space provided, or on a separate sheet, a sketch plan, as near as possible to scale, showing the location of the proposed domestic sewage treatment plant. On the plan-
(a) show the catchment area to be served by the plant;
(b) show the relationship of the plant to the nearest major road intersection, and name the roads; or show the relationship of the plant to a readily identifiable landmark;
(c) show any public drain, public sewer, or waters of Hong Kong
adjacent to the proposed plant; and
(d) mark the location of every proposed discharge point.
Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the proposed domestic sewage treatment plant. Mark on the plan the location of every proposed sampling point.
Page 45Page 46