CAP. 265] Peak Tramway (Safety) Regulations
[Subsidiary]
[1989 Ed.
components of the tramway and instructions for the safe running of the tramway; and
(b) a maintenance manual prepared by the designer or manufacturer describing the recommended maintenance procedures for the tramway, including types of lubricants required and the frequency of application, definitions and measurements to determine excessive wear, the recommended frequency of servicing of specific components and the periodic inspections to be carried out.
(2) Where the designer or manufacturer of the tramway amends the operation manual or maintenance manual prepared by him, the company shall notify the Director of such amendment as soon as reasonably possible after the company receives the amendment from the designer or manufacturer.
25. Company not to operate tramway without adequate rescue facilities and equipment
(1) The company shall, to the satisfaction of the Director, provide adequate equipment and facilities for the rescue of passengers in the event of an accident or emergency.
(2) Without prejudice to the generality of subregulation (1), the company shall ensure that-
(a) rescue equipment is located at suitable points along the length of the tramway;
(b) all rescue equipment is adequately protected from damage, deterioration by weather and loss by theft.
26. Company to replace hauling rope
The company, upon being informed by the engineering superintendent of the existence of a matter referred to in regulation 11(1)(a) or (b), shall immediately replace the hauling rope or take other appropriate safety measures, as the case may be.
27. Company to maintain safety of persons using or being in vicinity of tramway
(1) The company shall, to the satisfaction of the Director, provide reasonable numbers of personnel and facilities for the control and safety of persons using, or being in the vicinity of, the tramway.
(2) The company shall ensure that arrangements are made at each terminal on the tramway for the marshalling and control of persons using or
A 12
CAP. 265] Peak Tramway (Safety) Regulations
[Subsidiary]
[1989 Ed.
components of the tramway and instructions for the safe running of the tramway; and
(b) a maintenance manual prepared by the designer or manufacturer describing the recommended maintenance procedures for the tramway, including types of lubricants required and the frequency of application, definitions and measurements to determine excessive wear, the recommended frequency of servicing of specific components and the periodic inspections to be carried out.
(2) Where the designer or manufacturer of the tramway amends the operation manual or maintenance manual prepared by him, the company shall notify the Director of such amendment as soon as reasonably possible after the company receives the amendment from the designer or manufacturer.
25. Company not to operate tramway without
adequate rescue facilities and equipment
(1) The company shall, to the satisfaction of the Director, provide adequate equipment and facilities for the rescue of passengers in the event of an accident or emergency.
(2) Without prejudice to the generality of subregulation (1), the company shall ensure that-
(a) rescue equipment is located at suitable points along the length of
the tramway;
(b) all rescue equipment is adequately protected from damage,
deterioration by weather and loss by theft.
26. Company to replace hauling rope
The company, upon being informed by the engineering superintendent of the existence of a matter referred to in regulation 11(1)(a) or (b), shall immediately replace the hauling rope or take other appropriate safety mea- sures, as the case may be.
27. Company to maintain safety of persons
using or being in vicinity of tramway
(1) The company shall, to the satisfaction of the Director, provide reasonable numbers of personnel and facilities for the control and safety of persons using, or being in the vicinity of, the tramway.
(2) The company shall ensure that arrangements are made at each terminal on the tramway for the marshalling and control of persons using or